Question 30
A server operations team encounters the following situation: Two database hosts share a single switch uplink despite a design requiring link resilience across switch failures. After making the corrective change, which result best demonstrates that this particular problem is resolved?
Explanation
Correct Answer
This is incident-specific acceptance evidence: Disconnecting one switch leaves tested database access functional. It verifies the action provide redundant NIC paths to independent switches with a compatible teaming design. The failure under test was: An additional cable to the same switch would preserve a common point of failure.
Incorrect Answers
This observation tests an unrelated Given a scenario, install physical hardware case: A heavy UPS is planned above lightly loaded servers in a rack that maintenance technicians frequently roll across a raised floor. It may be true while the current failure persists; the decisive current cause is: An additional cable to the same switch would preserve a common point of failure.
This observation tests an unrelated Given a scenario, install physical hardware case: One site's new rack consumes more power than two UPS battery strings can support for the required graceful shutdown window. It may be true while the current failure persists; the decisive current cause is: An additional cable to the same switch would preserve a common point of failure.
This observation tests an unrelated Given a scenario, install physical hardware case: Technicians install an active 10GbE optical link using a multimode transceiver at one end and a single-mode optic at the other. It may be true while the current failure persists; the decisive current cause is: An additional cable to the same switch would preserve a common point of failure.