Question 20
A server operations team encounters the following situation: An analytics rack's connected servers draw 6.8 kW, while the only installed PDU is rated for 5 kW continuous load. Which sustained operational control best reduces the likelihood of this same issue recurring?
Explanation
Correct Answer
This control targets the underlying recurrence risk: The rack demand exceeds its available safe power capacity. It builds validation into the affected workflow and supports the expected recovery result: Meter readings remain within rated continuous circuit and PDU limits under peak load.
Incorrect Answers
This control addresses a different scenario: An expansion server needs four network ports, but the small-form chassis lacks enough PCIe slots for the specified add-in NICs. That event's root mechanism was the proposed physical expansion count exceeds chassis slot capacity. The described incident instead arises from: The rack demand exceeds its available safe power capacity.
This control addresses a different scenario: Two database hosts share a single switch uplink despite a design requiring link resilience across switch failures. That event's root mechanism was an additional cable to the same switch would preserve a common point of failure. The described incident instead arises from: The rack demand exceeds its available safe power capacity.
This control addresses a different scenario: A branch installs both redundant PSU cords into the same power strip even though two independent protected circuits are available. That event's root mechanism was two supplies share one upstream electrical failure domain. The described incident instead arises from: The rack demand exceeds its available safe power capacity.