Question 530
A VMware Cloud Foundation 9.0 design workshop at an auto parts supplier identifies a problem in plant applications: The destination cluster is sized for only the final workloads without temporary dual-run overhead. What should the architect specify?
Explanation
Correct Answer
The most direct design decision is to reserve migration-phase compute storage and networking capacity in the landing design. For plant applications at an auto parts supplier, the stated problem is: The destination cluster is sized for only the final workloads without temporary dual-run overhead. That approach addresses the documented architecture objective rather than an unrelated implementation detail. It should be accepted when concurrent source and target operations stay within capacity limits. The design choice remains subject to the real environment's compatibility and constraints.
Incorrect Answers
Create and verify the required recovery point before executing the migration addresses the separate architecture topic of data protection before cutover, where the underlying concern is: A database cutover begins with no validated backup or recovery point for rollback. It does not most directly resolve the present issue for plant applications at an auto parts supplier: The destination cluster is sized for only the final workloads without temporary dual-run overhead. The targeted decision is instead to reserve migration-phase compute storage and networking capacity in the landing design.
Validate compatibility and supported migration paths before wave planning addresses the separate architecture topic of version compatibility, where the underlying concern is: The project proposes migrating application VMs without checking the supported VM hardware and platform versions. It does not most directly resolve the present issue for plant applications at an auto parts supplier: The destination cluster is sized for only the final workloads without temporary dual-run overhead. The targeted decision is instead to reserve migration-phase compute storage and networking capacity in the landing design.
Group migration waves by application dependencies and required sequencing addresses the separate architecture topic of migration dependency waves, where the underlying concern is: The team migrates web servers independently of database and identity dependencies without assessing cutover risk. It does not most directly resolve the present issue for plant applications at an auto parts supplier: The destination cluster is sized for only the final workloads without temporary dual-run overhead. The targeted decision is instead to reserve migration-phase compute storage and networking capacity in the landing design.