McAfee-Secured Website

Exam Code: PRINCE2 7 Practitioner

Exam Name: PRINCE2 7 Practitioner

Certification Provider: PRINCE2

100% PRINCE2 PRINCE2 7 Practitioner Guaranteed Success With Testking Training Materials

Get Real PRINCE2 7 Practitioner Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

93 Questions & Answers with Testing Engine

"PRINCE2 7 Practitioner Exam", also known as PRINCE2 7 Practitioner exam, is a PRINCE2 certification exam.

Pass your tests with the always up-to-date PRINCE2 7 Practitioner Exam Engine. Your PRINCE2 7 Practitioner training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

PRINCE2 PRINCE2 7 Practitioner Practice Test 80

Question 790

The board requests proof that this project fault is controlled: A park renovation project manager asks the project board to close the project while the final stage plan still lists an unaccepted safety inspection. Which result is most relevant?

  1. The lessons report is accepted and relevant improvement owners are named.
  2. The board decision rests on verified safety acceptance rather than a claimed task completion.
  3. The service owner signs off operational readiness and responsibilities are recorded.
  4. The end project report and handover record identify each residual item and its owner.

Explanation

Correct Answer

B:

The strongest confirmation is: The board decision rests on verified safety acceptance rather than a claimed task completion. It is evidence for the specific corrective step—Complete or formally resolve the inspection and update the end project report before seeking closure.—rather than a generic system-health signal.

Incorrect Answers

A:

The observation relates to a problem where the closing process omits lessons reporting needed to improve future projects; the required finding here is that the board decision rests on verified safety acceptance rather than a claimed task completion.

C:

The offered finding is relevant when project closure is being proposed before a controlled handover to operations. Here the acceptance test must show that the board decision rests on verified safety acceptance rather than a claimed task completion.

D:

This result could confirm a fix when closing activities have not resolved or transferred remaining issues as actionable follow-on work. It would not demonstrate that the board decision rests on verified safety acceptance rather than a claimed task completion.

Question 791

A project team is examining a control failure: A park renovation project manager asks the project board to close the project while the final stage plan still lists an unaccepted safety inspection. What is the most plausible explanation?

  1. Premature closure lacks controlled preservation, handover and contractual accountability.
  2. The completion recommendation is inconsistent with the actual acceptance status of a critical product.
  3. Closing activities have not resolved or transferred remaining issues as actionable follow-on work.
  4. Project closure is being proposed before a controlled handover to operations.

Explanation

Correct Answer

B:

The failure is explained by: The completion recommendation is inconsistent with the actual acceptance status of a critical product. It supports the targeted intervention: Complete or formally resolve the inspection and update the end project report before seeking closure. The observable test of success is: The board decision rests on verified safety acceptance rather than a claimed task completion.

Incorrect Answers

A:

There could be such a cause if premature closure lacks controlled preservation, handover and contractual accountability. The stated incident instead arises because the completion recommendation is inconsistent with the actual acceptance status of a critical product.

C:

The mechanism could explain a fault where closing activities have not resolved or transferred remaining issues as actionable follow-on work; it does not account for the current condition, where the completion recommendation is inconsistent with the actual acceptance status of a critical product.

D:

The cause in this option would matter if project closure is being proposed before a controlled handover to operations. The reported failure instead arises because the completion recommendation is inconsistent with the actual acceptance status of a critical product.

Question 792

Choose the most relevant preventive check for this PRINCE2 project situation: A park renovation project manager asks the project board to close the project while the final stage plan still lists an unaccepted safety inspection.

  1. Include a viable post-project benefits review arrangement in closure artifacts.
  2. Require baseline-versus-actual evidence for time, cost, quality, risk and sustainability at closure.
  3. Reconcile final-stage product status against acceptance records before closure.
  4. Apply proportionate controlled closure steps even when a project is stopped early.

Explanation

Correct Answer

C:

This practice reduces the documented recurrence risk: Reconcile final-stage product status against acceptance records before closure. The original root fault was: The completion recommendation is inconsistent with the actual acceptance status of a critical product. The practical health indicator is: The board decision rests on verified safety acceptance rather than a claimed task completion.

Incorrect Answers

A:

The option addresses cases in which project closure is being confused with completion of all future benefit realization. In the reported incident, the completion recommendation is inconsistent with the actual acceptance status of a critical product instead.

B:

This safeguard is useful when the closing report does not provide a reliable assessment of overall project performance. It does not prevent the present fault, where the completion recommendation is inconsistent with the actual acceptance status of a critical product.

D:

The proposed routine targets situations in which premature closure lacks controlled preservation, handover and contractual accountability. To prevent the reported problem, the team must address the fact that the completion recommendation is inconsistent with the actual acceptance status of a critical product.

Question 793

A practitioner must act on this project issue: A university data programme is cancelled by the business layer, yet its project manager simply stops vendor work and deletes the shared project logs. Which intervention most directly addresses the failure?

  1. Finalize benefit measures, owners and review dates and transfer monitoring to the operating organization.
  2. Prepare a lessons report identifying what worked and what should change and share with the appropriate organization.
  3. Use the closing process in a tailored premature-closure form to document products, costs, obligations and lessons.
  4. Document outstanding issues and agree accountable follow-on actions with the receiving business owners.

Explanation

Correct Answer

C:

Use the closing process in a tailored premature-closure form to document products, costs, obligations and lessons. This is the appropriate intervention because Premature closure lacks controlled preservation, handover and contractual accountability. The specific outcome to verify is: The business receives an authorized closure report and retained records of delivered and outstanding work.

Incorrect Answers

A:

When project closure is being confused with completion of all future benefit realization, “Finalize benefit measures, owners and review dates and transfer monitoring to the operating organization” could be justified. Here, premature closure lacks controlled preservation, handover and contractual accountability, so this is not the needed correction.

B:

That action tackles a problem where the closing process omits lessons reporting needed to improve future projects. The reported issue is instead that premature closure lacks controlled preservation, handover and contractual accountability.

D:

The option would help when closing activities have not resolved or transferred remaining issues as actionable follow-on work, but it would not address a situation where premature closure lacks controlled preservation, handover and contractual accountability.

Question 794

A PRINCE2 practitioner has implemented a correction to this situation: A university data programme is cancelled by the business layer, yet its project manager simply stops vendor work and deletes the shared project logs. Which outcome demonstrates that the correction worked?

  1. The business receives an authorized closure report and retained records of delivered and outstanding work.
  2. The board receives an acceptance record tied to the approved project product description.
  3. The board closes delivery with a documented post-project benefits review schedule and accountable senior user.
  4. The board can evaluate project results across agreed targets and approve follow-on ownership.

Explanation

Correct Answer

A:

This finding directly demonstrates the intended result: The business receives an authorized closure report and retained records of delivered and outstanding work. It tests whether the chosen remediation—Use the closing process in a tailored premature-closure form to document products, costs, obligations and lessons.—has addressed the cause: Premature closure lacks controlled preservation, handover and contractual accountability.

Incorrect Answers

B:

The offered finding is relevant when the closing project process has not confirmed acceptance of products against their criteria. Here the acceptance test must show that the business receives an authorized closure report and retained records of delivered and outstanding work.

C:

It would be evidence for a problem in which project closure is being confused with completion of all future benefit realization. It does not verify that the business receives an authorized closure report and retained records of delivered and outstanding work.

D:

The offered finding is relevant when the closing report does not provide a reliable assessment of overall project performance. Here the acceptance test must show that the business receives an authorized closure report and retained records of delivered and outstanding work.

Question 795

A project assurance reviewer investigates the following: A university data programme is cancelled by the business layer, yet its project manager simply stops vendor work and deletes the shared project logs. What is the root cause?

  1. Closing activities have not resolved or transferred remaining issues as actionable follow-on work.
  2. Premature closure lacks controlled preservation, handover and contractual accountability.
  3. The completion recommendation is inconsistent with the actual acceptance status of a critical product.
  4. The closing project process has not confirmed acceptance of products against their criteria.

Explanation

Correct Answer

B:

The identified root cause is: Premature closure lacks controlled preservation, handover and contractual accountability. The appropriate correction is: Use the closing process in a tailored premature-closure form to document products, costs, obligations and lessons. A separate validation must then show: The business receives an authorized closure report and retained records of delivered and outstanding work.

Incorrect Answers

A:

The mechanism could explain a fault where closing activities have not resolved or transferred remaining issues as actionable follow-on work; it does not account for the current condition, where premature closure lacks controlled preservation, handover and contractual accountability.

C:

The cause in this option would matter if the completion recommendation is inconsistent with the actual acceptance status of a critical product. The reported failure instead arises because premature closure lacks controlled preservation, handover and contractual accountability.

D:

This diagnosis fits a situation in which the closing project process has not confirmed acceptance of products against their criteria. Here, premature closure lacks controlled preservation, handover and contractual accountability.

Question 796

A project assurance review examines the cause of this problem: A university data programme is cancelled by the business layer, yet its project manager simply stops vendor work and deletes the shared project logs. What preventive action should be introduced?

  1. Require baseline-versus-actual evidence for time, cost, quality, risk and sustainability at closure.
  2. Include a viable post-project benefits review arrangement in closure artifacts.
  3. Reconcile final-stage product status against acceptance records before closure.
  4. Apply proportionate controlled closure steps even when a project is stopped early.

Explanation

Correct Answer

D:

The lasting control is: Apply proportionate controlled closure steps even when a project is stopped early. It addresses recurrence of this mechanism: Premature closure lacks controlled preservation, handover and contractual accountability. A successful system should still demonstrate: The business receives an authorized closure report and retained records of delivered and outstanding work.

Incorrect Answers

A:

The control would be appropriate if the closing report does not provide a reliable assessment of overall project performance; the issue here is that premature closure lacks controlled preservation, handover and contractual accountability.

B:

The control would be appropriate if project closure is being confused with completion of all future benefit realization; the issue here is that premature closure lacks controlled preservation, handover and contractual accountability.

C:

The proposed routine targets situations in which the completion recommendation is inconsistent with the actual acceptance status of a critical product. To prevent the reported problem, the team must address the fact that premature closure lacks controlled preservation, handover and contractual accountability.

Question 797

Apply PRINCE2 to this project decision: A cultural heritage digitization programme completes product handover but no report compares final performance with the baselined time, cost and sustainability targets. Which response is best supported by the method?

  1. Prepare the end project report with actual performance against the authorized baselines and outstanding benefit actions.
  2. Finalize benefit measures, owners and review dates and transfer monitoring to the operating organization.
  3. Document outstanding issues and agree accountable follow-on actions with the receiving business owners.
  4. Obtain authorized user acceptance or formally resolve deficiencies before recommending closure.

Explanation

Correct Answer

A:

The case requires this change: Prepare the end project report with actual performance against the authorized baselines and outstanding benefit actions. The actual failure mechanism is: The closing report does not provide a reliable assessment of overall project performance. A meaningful acceptance check is: The board can evaluate project results across agreed targets and approve follow-on ownership.

Incorrect Answers

B:

The option would help when project closure is being confused with completion of all future benefit realization, but it would not address a situation where the closing report does not provide a reliable assessment of overall project performance.

C:

This change addresses a situation in which closing activities have not resolved or transferred remaining issues as actionable follow-on work. It leaves the current failure unresolved because the closing report does not provide a reliable assessment of overall project performance.

D:

This change addresses a situation in which the closing project process has not confirmed acceptance of products against their criteria. It leaves the current failure unresolved because the closing report does not provide a reliable assessment of overall project performance.

Question 798

Following the agreed corrective action for this project concern—A cultural heritage digitization programme completes product handover but no report compares final performance with the baselined time, cost and sustainability targets.—which evidence would verify a suitable outcome?

  1. The board can evaluate project results across agreed targets and approve follow-on ownership.
  2. The lessons report is accepted and relevant improvement owners are named.
  3. The business receives an authorized closure report and retained records of delivered and outstanding work.
  4. The board closes delivery with a documented post-project benefits review schedule and accountable senior user.

Explanation

Correct Answer

A:

Successful remediation is demonstrated when: The board can evaluate project results across agreed targets and approve follow-on ownership. That result connects to the targeted action: Prepare the end project report with actual performance against the authorized baselines and outstanding benefit actions. The previously observed defect was: The closing report does not provide a reliable assessment of overall project performance.

Incorrect Answers

B:

It would be evidence for a problem in which the closing process omits lessons reporting needed to improve future projects. It does not verify that the board can evaluate project results across agreed targets and approve follow-on ownership.

C:

It would be evidence for a problem in which premature closure lacks controlled preservation, handover and contractual accountability. It does not verify that the board can evaluate project results across agreed targets and approve follow-on ownership.

D:

That outcome could matter in a case where project closure is being confused with completion of all future benefit realization, but the present check needs to show that the board can evaluate project results across agreed targets and approve follow-on ownership.

Question 799

Which management-control deficiency underlies the following situation? A cultural heritage digitization programme completes product handover but no report compares final performance with the baselined time, cost and sustainability targets.

  1. The closing project process has not confirmed acceptance of products against their criteria.
  2. Project closure is being proposed before a controlled handover to operations.
  3. The closing process omits lessons reporting needed to improve future projects.
  4. The closing report does not provide a reliable assessment of overall project performance.

Explanation

Correct Answer

D:

This mechanism accounts for the observation: The closing report does not provide a reliable assessment of overall project performance. Address it by implementing: Prepare the end project report with actual performance against the authorized baselines and outstanding benefit actions. Confirm the fix through: The board can evaluate project results across agreed targets and approve follow-on ownership.

Incorrect Answers

A:

The cause in this option would matter if the closing project process has not confirmed acceptance of products against their criteria. The reported failure instead arises because the closing report does not provide a reliable assessment of overall project performance.

B:

There could be such a cause if project closure is being proposed before a controlled handover to operations. The stated incident instead arises because the closing report does not provide a reliable assessment of overall project performance.

C:

The proposed diagnosis concerns a problem where the closing process omits lessons reporting needed to improve future projects. The facts here indicate that the closing report does not provide a reliable assessment of overall project performance.

Question 800

The project team has corrected the following defect: A cultural heritage digitization programme completes product handover but no report compares final performance with the baselined time, cost and sustainability targets. Which future assurance check should be added?

  1. Reconcile final-stage product status against acceptance records before closure.
  2. Require residual issue disposition and handover ownership before board closure.
  3. Make operational handover and support acceptance closure prerequisites.
  4. Require baseline-versus-actual evidence for time, cost, quality, risk and sustainability at closure.

Explanation

Correct Answer

D:

To prevent the same issue, apply this check: Require baseline-versus-actual evidence for time, cost, quality, risk and sustainability at closure. The risk to contain is: The closing report does not provide a reliable assessment of overall project performance. Verify control effectiveness using: The board can evaluate project results across agreed targets and approve follow-on ownership.

Incorrect Answers

A:

The proposed routine targets situations in which the completion recommendation is inconsistent with the actual acceptance status of a critical product. To prevent the reported problem, the team must address the fact that the closing report does not provide a reliable assessment of overall project performance.

B:

The control would be appropriate if closing activities have not resolved or transferred remaining issues as actionable follow-on work; the issue here is that the closing report does not provide a reliable assessment of overall project performance.

C:

The option addresses cases in which project closure is being proposed before a controlled handover to operations. In the reported incident, the closing report does not provide a reliable assessment of overall project performance instead.

PRINCE2 7 Practitioner Practice Tests