Question 520
At Cobalt Aerospace, the production environment supports CAD shares and simulation data volumes under a documented recovery-time objective. Investigators find: A planned switchover proceeds even though the remote site has insufficient capacity for the protected workload. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?
Explanation
Correct Answer
The target site accepts the planned workload and capacity telemetry stays within validated thresholds. The observation verifies that the chosen action (Verify destination resources, compatibility and protected workload capacity before permitting switchover) has corrected the initiating failure (A planned switchover proceeds even though the remote site has insufficient capacity for the protected workload). This is directly measurable for Cobalt Aerospace's CAD shares and simulation data volumes rather than merely reporting task completion.
Incorrect Answers
The design documents which node or site failures each mechanism covers and proves the selected recovery path. This is a valid test for another condition (A regional continuity plan refers to MetroCluster and ordinary local HA as interchangeable solutions) after a different correction (Match MetroCluster architecture and distance or quorum prerequisites to actual site-level continuity requirements). It does not establish the necessary result for Cobalt Aerospace's CAD shares and simulation data volumes: The target site accepts the planned workload and capacity telemetry stays within validated thresholds.
An inter-site link interruption follows the expected fenced failover behavior without split-brain writes. This is a valid test for another condition (A two-site SAN continuity design omits the mediator or quorum mechanisms required by its selected SnapMirror active sync topology) after a different correction (Validate the supported mediator placement and cluster connectivity for the chosen active sync design). It does not establish the necessary result for Cobalt Aerospace's CAD shares and simulation data volumes: The target site accepts the planned workload and capacity telemetry stays within validated thresholds.
A representative client mounts the recovered file service through an approved network route after failover. This is a valid test for another condition (A site-level recovery plan restores the replicated volume but neglects protocol LIFs, SVM networking and client DNS records) after a different correction (Include SVM and client access reconfiguration in the end-to-end recovery runbook). It does not establish the necessary result for Cobalt Aerospace's CAD shares and simulation data volumes: The target site accepts the planned workload and capacity telemetry stays within validated thresholds.