Question 160
At Brookside Manufacturing, the plant operations team is planning an industrial Ethernet modernization under a requirement for planned downtime and resilient cabling. After the switch change, operators must prove that they resolved: A FortiSwitch stack design crosses multiple closets with unsupported interconnect optics and no link compatibility review. Which observation BEST demonstrates that the fix worked?
Explanation
Correct Answer
All inter-switch links report supported hardware and stable link health at the intended distances. This observation verifies the specific reported problem, A FortiSwitch stack design crosses multiple closets with unsupported interconnect optics and no link compatibility review. The intended correction was: Check the switch model, supported interconnect media, transceiver matrix and link budget before deployment. It provides a directly testable outcome for the Brookside Manufacturing environment rather than treating a completed change ticket as proof.
Incorrect Answers
Both switches report healthy peer and interchassis link state, and downstream traffic uses the intended redundant path. For Brookside Manufacturing, that measurement would support a separate technical case: An MCLAG pair is cabled without a correctly configured interchassis link for peer synchronization. Its corresponding remedy is: Configure and validate the supported MCLAG interchassis link and peer relationship before enabling downlinks. The reported Brookside Manufacturing condition is A FortiSwitch stack design crosses multiple closets with unsupported interconnect optics and no link compatibility review. So the required outcome is: All inter-switch links report supported hardware and stable link health at the intended distances.
FortiGate link-state and switch discovery remain consistent through a planned member-link outage. For Brookside Manufacturing, that measurement would support a separate technical case: A FortiLink aggregate on FortiGate has two physically valid cables but the design did not account for switch topology and allowed forwarding state. Its corresponding remedy is: Choose the supported logical FortiLink interface and redundancy mode for the actual pair of downstream switches. The reported Brookside Manufacturing condition is A FortiSwitch stack design crosses multiple closets with unsupported interconnect optics and no link compatibility review. So the required outcome is: All inter-switch links report supported hardware and stable link health at the intended distances.
After the migration all peer and trunk memberships match the plan and client paths survive a link test. For Brookside Manufacturing, that measurement would support a separate technical case: An operations team changes the stack interconnect without preserving documented LAG and MCLAG peer assignments. Its corresponding remedy is: Record original member ports, logical trunks and peer links, then make a controlled topology-aware migration. The reported Brookside Manufacturing condition is A FortiSwitch stack design crosses multiple closets with unsupported interconnect optics and no link compatibility review. So the required outcome is: All inter-switch links report supported hardware and stable link health at the intended distances.