Question 140
At Timberline Foods, the supply-chain network operations team is planning a processing-plant network review under a requirement for production-line reliability. After the switch change, operators must prove that they resolved: A dual-homed server needs resilient links to two FortiSwitch chassis and a single-chassis LAG cannot meet the design. Which observation BEST demonstrates that the fix worked?
Explanation
Correct Answer
Loss of one chassis leaves the server reachable through the remaining permitted aggregate member. This observation verifies the specific reported problem, A dual-homed server needs resilient links to two FortiSwitch chassis and a single-chassis LAG cannot meet the design. The intended correction was: Evaluate a supported MCLAG peer pair and downstream aggregate topology before connecting the server. It provides a directly testable outcome for the Timberline Foods environment rather than treating a completed change ticket as proof.
Incorrect Answers
All inter-switch links report supported hardware and stable link health at the intended distances. For Timberline Foods, that measurement would support a separate technical case: A FortiSwitch stack design crosses multiple closets with unsupported interconnect optics and no link compatibility review. Its corresponding remedy is: Check the switch model, supported interconnect media, transceiver matrix and link budget before deployment. The reported Timberline Foods condition is A dual-homed server needs resilient links to two FortiSwitch chassis and a single-chassis LAG cannot meet the design. So the required outcome is: Loss of one chassis leaves the server reachable through the remaining permitted aggregate member.
FortiGate link-state and switch discovery remain consistent through a planned member-link outage. For Timberline Foods, that measurement would support a separate technical case: A FortiLink aggregate on FortiGate has two physically valid cables but the design did not account for switch topology and allowed forwarding state. Its corresponding remedy is: Choose the supported logical FortiLink interface and redundancy mode for the actual pair of downstream switches. The reported Timberline Foods condition is A dual-homed server needs resilient links to two FortiSwitch chassis and a single-chassis LAG cannot meet the design. So the required outcome is: Loss of one chassis leaves the server reachable through the remaining permitted aggregate member.
Failover tests show the correct active-versus-standby link behavior for the documented design. For Timberline Foods, that measurement would support a separate technical case: A design uses a FortiLink split interface and assumes that both uplinks must always forward simultaneously. Its corresponding remedy is: Apply the topology-specific split-interface behavior or transition to supported MCLAG when active-active is required. The reported Timberline Foods condition is A dual-homed server needs resilient links to two FortiSwitch chassis and a single-chassis LAG cannot meet the design. So the required outcome is: Loss of one chassis leaves the server reachable through the remaining permitted aggregate member.