McAfee-Secured Website

Exam Bundle

Exam Code: PK0-005

Exam Name CompTIA Project+

Certification Provider: CompTIA

Corresponding Certification: CompTIA Project+

CompTIA PK0-005 Bundle $44.99

100% CompTIA PK0-005 Guaranteed Success With Testking Training Materials

Get Real PK0-005 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    PK0-005 Questions & Answers

    628 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual PK0-005 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • PK0-005 Video Course

    PK0-005 Video Course

    159 Video Lectures

    PK0-005 Video Course is developed by CompTIA Professionals to help you pass the PK0-005 exam.

    Description

    This course will improve your knowledge and skills required to pass CompTIA Project+ exam.
  • Study Guide

    PK0-005 Study Guide

    682 PDF Pages

    Developed by industry experts, this 682-page guide spells out in painstaking detail all of the information you need to ace PK0-005 exam.

CompTIA Project+ (PK0-005) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    628 Questions

    $124.99
  • PK0-005 Video Course

    Video Course

    159 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    682 PDF Pages

    $29.99

CompTIA PK0-005 Practice Test 77

Question 760

For Evergreen Hospital, the delivery lead reports the following delivery problem: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The sponsor can identify start finish and overlap of work on the approved time axis.
  2. The chart separates progress on delivered work from additions to overall scope.
  3. The network identifies the controlling sequence and the effect of delaying a critical activity.
  4. A reviewer can distinguish a current blocker from an event that might occur in the future.

Explanation

Correct Answer

A:

The sponsor can identify start finish and overlap of work on the approved time axis. This is the relevant acceptance evidence because it tests whether the corrective action (Build a Gantt chart from scheduled tasks dependencies and milestones.) fixed the original concern (A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list.) at Evergreen Hospital, rather than relying only on a task marked complete. The affected work concerns care coordination and staff identity services.

Incorrect Answers

B:

The chart separates progress on delivered work from additions to overall scope. This evidence would be useful for another condition (Leadership wants to see how much scope has been delivered while total product scope has grown during the iteration.) and its different action (Use a burnup chart showing completed work against the changing total-scope line.). At Evergreen Hospital, it does not demonstrate the required project outcome: The sponsor can identify start finish and overlap of work on the approved time axis.

C:

The network identifies the controlling sequence and the effect of delaying a critical activity. This evidence would be useful for another condition (A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines.) and its different action (Use a project network diagram with dependencies and critical path analysis.). At Evergreen Hospital, it does not demonstrate the required project outcome: The sponsor can identify start finish and overlap of work on the approved time axis.

D:

A reviewer can distinguish a current blocker from an event that might occur in the future. This evidence would be useful for another condition (The PM keeps active blockers and potential threats in one list without distinguishing realized events from uncertainties.) and its different action (Use separate issue tracking and risk register entries with appropriate owners and responses.). At Evergreen Hospital, it does not demonstrate the required project outcome: The sponsor can identify start finish and overlap of work on the approved time axis.

Question 761

At Eastport Research Hospital, the delivery assessment finds: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. Which project management action BEST addresses the particular issue?

  1. Use a project network diagram with dependencies and critical path analysis.
  2. Use a burnup chart showing completed work against the changing total-scope line.
  3. Build a Gantt chart from scheduled tasks dependencies and milestones.
  4. Use separate issue tracking and risk register entries with appropriate owners and responses.

Explanation

Correct Answer

C:

Build a Gantt chart from scheduled tasks dependencies and milestones. This directly addresses the reported management gap: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. For Eastport Research Hospital and its medical research systems and directory accounts, a useful verification outcome is: The sponsor can identify start finish and overlap of work on the approved time axis.

Incorrect Answers

A:

Use a project network diagram with dependencies and critical path analysis. This choice addresses another specific project condition: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. The actual issue at Eastport Research Hospital is: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. That other intervention does not itself establish the required result: The sponsor can identify start finish and overlap of work on the approved time axis.

B:

Use a burnup chart showing completed work against the changing total-scope line. This choice addresses another specific project condition: Leadership wants to see how much scope has been delivered while total product scope has grown during the iteration. The actual issue at Eastport Research Hospital is: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. That other intervention does not itself establish the required result: The sponsor can identify start finish and overlap of work on the approved time axis.

D:

Use separate issue tracking and risk register entries with appropriate owners and responses. This choice addresses another specific project condition: The PM keeps active blockers and potential threats in one list without distinguishing realized events from uncertainties. The actual issue at Eastport Research Hospital is: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. That other intervention does not itself establish the required result: The sponsor can identify start finish and overlap of work on the approved time axis.

Question 762

At Eastport Research Hospital, the delivery assessment finds: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The sponsor can identify start finish and overlap of work on the approved time axis.
  2. A reviewer can distinguish a current blocker from an event that might occur in the future.
  3. The chart separates progress on delivered work from additions to overall scope.
  4. The network identifies the controlling sequence and the effect of delaying a critical activity.

Explanation

Correct Answer

A:

The sponsor can identify start finish and overlap of work on the approved time axis. This is the relevant acceptance evidence because it tests whether the corrective action (Build a Gantt chart from scheduled tasks dependencies and milestones.) fixed the original concern (A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list.) at Eastport Research Hospital, rather than relying only on a task marked complete. The affected work concerns medical research systems and directory accounts.

Incorrect Answers

B:

A reviewer can distinguish a current blocker from an event that might occur in the future. This evidence would be useful for another condition (The PM keeps active blockers and potential threats in one list without distinguishing realized events from uncertainties.) and its different action (Use separate issue tracking and risk register entries with appropriate owners and responses.). At Eastport Research Hospital, it does not demonstrate the required project outcome: The sponsor can identify start finish and overlap of work on the approved time axis.

C:

The chart separates progress on delivered work from additions to overall scope. This evidence would be useful for another condition (Leadership wants to see how much scope has been delivered while total product scope has grown during the iteration.) and its different action (Use a burnup chart showing completed work against the changing total-scope line.). At Eastport Research Hospital, it does not demonstrate the required project outcome: The sponsor can identify start finish and overlap of work on the approved time axis.

D:

The network identifies the controlling sequence and the effect of delaying a critical activity. This evidence would be useful for another condition (A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines.) and its different action (Use a project network diagram with dependencies and critical path analysis.). At Eastport Research Hospital, it does not demonstrate the required project outcome: The sponsor can identify start finish and overlap of work on the approved time axis.

Question 763

At Arborstone Tech, the delivery assessment finds: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. Which project management action BEST addresses the particular issue?

  1. Use a task board with visible workflow states ownership and blocked-item indicators.
  2. Build a Gantt chart from scheduled tasks dependencies and milestones.
  3. Use a project network diagram with dependencies and critical path analysis.
  4. Track the issue in a structured issue log with severity responsibility and progress notes.

Explanation

Correct Answer

C:

Use a project network diagram with dependencies and critical path analysis. This directly addresses the reported management gap: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. For Arborstone Tech and its SaaS product operations and app identities, a useful verification outcome is: The network identifies the controlling sequence and the effect of delaying a critical activity.

Incorrect Answers

A:

Use a task board with visible workflow states ownership and blocked-item indicators. This choice addresses another specific project condition: The project team needs to track work item movement through analysis build and review but reports only aggregate hours. The actual issue at Arborstone Tech is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

B:

Build a Gantt chart from scheduled tasks dependencies and milestones. This choice addresses another specific project condition: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. The actual issue at Arborstone Tech is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

D:

Track the issue in a structured issue log with severity responsibility and progress notes. This choice addresses another specific project condition: An open issue is assigned to a team but has no priority owner due date or history of follow-up. The actual issue at Arborstone Tech is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

Question 764

At Arborstone Tech, the delivery assessment finds: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The next review can identify the owner latest action and agreed resolution date.
  2. The network identifies the controlling sequence and the effect of delaying a critical activity.
  3. The board shows the current owner and state of each work item.
  4. The sponsor can identify start finish and overlap of work on the approved time axis.

Explanation

Correct Answer

B:

The network identifies the controlling sequence and the effect of delaying a critical activity. This is the relevant acceptance evidence because it tests whether the corrective action (Use a project network diagram with dependencies and critical path analysis.) fixed the original concern (A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines.) at Arborstone Tech, rather than relying only on a task marked complete. The affected work concerns SaaS product operations and app identities.

Incorrect Answers

A:

The next review can identify the owner latest action and agreed resolution date. This evidence would be useful for another condition (An open issue is assigned to a team but has no priority owner due date or history of follow-up.) and its different action (Track the issue in a structured issue log with severity responsibility and progress notes.). At Arborstone Tech, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

C:

The board shows the current owner and state of each work item. This evidence would be useful for another condition (The project team needs to track work item movement through analysis build and review but reports only aggregate hours.) and its different action (Use a task board with visible workflow states ownership and blocked-item indicators.). At Arborstone Tech, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

D:

The sponsor can identify start finish and overlap of work on the approved time axis. This evidence would be useful for another condition (A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list.) and its different action (Build a Gantt chart from scheduled tasks dependencies and milestones.). At Arborstone Tech, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

Question 765

Harbor Point Medical is delivering an IT initiative involving clinical collaboration and patient information with several affected stakeholder groups. The team observes: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. Which project management action BEST addresses the particular issue?

  1. Build a Gantt chart from scheduled tasks dependencies and milestones.
  2. Use a task board with visible workflow states ownership and blocked-item indicators.
  3. Track the issue in a structured issue log with severity responsibility and progress notes.
  4. Use a project network diagram with dependencies and critical path analysis.

Explanation

Correct Answer

D:

Use a project network diagram with dependencies and critical path analysis. This directly addresses the reported management gap: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. For Harbor Point Medical and its clinical collaboration and patient information, a useful verification outcome is: The network identifies the controlling sequence and the effect of delaying a critical activity.

Incorrect Answers

A:

Build a Gantt chart from scheduled tasks dependencies and milestones. This choice addresses another specific project condition: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. The actual issue at Harbor Point Medical is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

B:

Use a task board with visible workflow states ownership and blocked-item indicators. This choice addresses another specific project condition: The project team needs to track work item movement through analysis build and review but reports only aggregate hours. The actual issue at Harbor Point Medical is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

C:

Track the issue in a structured issue log with severity responsibility and progress notes. This choice addresses another specific project condition: An open issue is assigned to a team but has no priority owner due date or history of follow-up. The actual issue at Harbor Point Medical is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

Question 766

Harbor Point Medical is delivering an IT initiative involving clinical collaboration and patient information with several affected stakeholder groups. The team observes: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The sponsor can identify start finish and overlap of work on the approved time axis.
  2. The network identifies the controlling sequence and the effect of delaying a critical activity.
  3. The next review can identify the owner latest action and agreed resolution date.
  4. The board shows the current owner and state of each work item.

Explanation

Correct Answer

B:

The network identifies the controlling sequence and the effect of delaying a critical activity. This is the relevant acceptance evidence because it tests whether the corrective action (Use a project network diagram with dependencies and critical path analysis.) fixed the original concern (A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines.) at Harbor Point Medical, rather than relying only on a task marked complete. The affected work concerns clinical collaboration and patient information.

Incorrect Answers

A:

The sponsor can identify start finish and overlap of work on the approved time axis. This evidence would be useful for another condition (A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list.) and its different action (Build a Gantt chart from scheduled tasks dependencies and milestones.). At Harbor Point Medical, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

C:

The next review can identify the owner latest action and agreed resolution date. This evidence would be useful for another condition (An open issue is assigned to a team but has no priority owner due date or history of follow-up.) and its different action (Track the issue in a structured issue log with severity responsibility and progress notes.). At Harbor Point Medical, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

D:

The board shows the current owner and state of each work item. This evidence would be useful for another condition (The project team needs to track work item movement through analysis build and review but reports only aggregate hours.) and its different action (Use a task board with visible workflow states ownership and blocked-item indicators.). At Harbor Point Medical, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

Question 767

For Meadow Pharmaceutical, the implementation team reports the following delivery problem: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. Which project management action BEST addresses the particular issue?

  1. Use a project network diagram with dependencies and critical path analysis.
  2. Track the issue in a structured issue log with severity responsibility and progress notes.
  3. Build a Gantt chart from scheduled tasks dependencies and milestones.
  4. Use a task board with visible workflow states ownership and blocked-item indicators.

Explanation

Correct Answer

A:

Use a project network diagram with dependencies and critical path analysis. This directly addresses the reported management gap: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. For Meadow Pharmaceutical and its lab results and regulatory documents, a useful verification outcome is: The network identifies the controlling sequence and the effect of delaying a critical activity.

Incorrect Answers

B:

Track the issue in a structured issue log with severity responsibility and progress notes. This choice addresses another specific project condition: An open issue is assigned to a team but has no priority owner due date or history of follow-up. The actual issue at Meadow Pharmaceutical is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

C:

Build a Gantt chart from scheduled tasks dependencies and milestones. This choice addresses another specific project condition: A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list. The actual issue at Meadow Pharmaceutical is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

D:

Use a task board with visible workflow states ownership and blocked-item indicators. This choice addresses another specific project condition: The project team needs to track work item movement through analysis build and review but reports only aggregate hours. The actual issue at Meadow Pharmaceutical is: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. That other intervention does not itself establish the required result: The network identifies the controlling sequence and the effect of delaying a critical activity.

Question 768

For Meadow Pharmaceutical, the implementation team reports the following delivery problem: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The sponsor can identify start finish and overlap of work on the approved time axis.
  2. The network identifies the controlling sequence and the effect of delaying a critical activity.
  3. The board shows the current owner and state of each work item.
  4. The next review can identify the owner latest action and agreed resolution date.

Explanation

Correct Answer

B:

The network identifies the controlling sequence and the effect of delaying a critical activity. This is the relevant acceptance evidence because it tests whether the corrective action (Use a project network diagram with dependencies and critical path analysis.) fixed the original concern (A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines.) at Meadow Pharmaceutical, rather than relying only on a task marked complete. The affected work concerns lab results and regulatory documents.

Incorrect Answers

A:

The sponsor can identify start finish and overlap of work on the approved time axis. This evidence would be useful for another condition (A PM wants to see planned activities as horizontal bars against calendar dates but uses an unstructured issue list.) and its different action (Build a Gantt chart from scheduled tasks dependencies and milestones.). At Meadow Pharmaceutical, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

C:

The board shows the current owner and state of each work item. This evidence would be useful for another condition (The project team needs to track work item movement through analysis build and review but reports only aggregate hours.) and its different action (Use a task board with visible workflow states ownership and blocked-item indicators.). At Meadow Pharmaceutical, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

D:

The next review can identify the owner latest action and agreed resolution date. This evidence would be useful for another condition (An open issue is assigned to a team but has no priority owner due date or history of follow-up.) and its different action (Track the issue in a structured issue log with severity responsibility and progress notes.). At Meadow Pharmaceutical, it does not demonstrate the required project outcome: The network identifies the controlling sequence and the effect of delaying a critical activity.

Question 769

For Brightstone Legal, the implementation team reports the following delivery problem: An audit asks which requirements have corresponding tests and the PM searches loosely named spreadsheets by hand. Which project management action BEST addresses the particular issue?

  1. Maintain a controlled change log with identifiers impacts approvals and implementation status.
  2. Maintain a requirements traceability matrix linking needs designs and acceptance tests.
  3. Use a task board with visible workflow states ownership and blocked-item indicators.
  4. Use a project network diagram with dependencies and critical path analysis.

Explanation

Correct Answer

B:

Maintain a requirements traceability matrix linking needs designs and acceptance tests. This directly addresses the reported management gap: An audit asks which requirements have corresponding tests and the PM searches loosely named spreadsheets by hand. For Brightstone Legal and its matter files and sensitive case records, a useful verification outcome is: A sampled requirement has a traceable test case status and responsible owner.

Incorrect Answers

A:

Maintain a controlled change log with identifiers impacts approvals and implementation status. This choice addresses another specific project condition: A project manager needs a formal record of proposed scope modifications but stores change requests as unrelated emails. The actual issue at Brightstone Legal is: An audit asks which requirements have corresponding tests and the PM searches loosely named spreadsheets by hand. That other intervention does not itself establish the required result: A sampled requirement has a traceable test case status and responsible owner.

C:

Use a task board with visible workflow states ownership and blocked-item indicators. This choice addresses another specific project condition: The project team needs to track work item movement through analysis build and review but reports only aggregate hours. The actual issue at Brightstone Legal is: An audit asks which requirements have corresponding tests and the PM searches loosely named spreadsheets by hand. That other intervention does not itself establish the required result: A sampled requirement has a traceable test case status and responsible owner.

D:

Use a project network diagram with dependencies and critical path analysis. This choice addresses another specific project condition: A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines. The actual issue at Brightstone Legal is: An audit asks which requirements have corresponding tests and the PM searches loosely named spreadsheets by hand. That other intervention does not itself establish the required result: A sampled requirement has a traceable test case status and responsible owner.

Question 770

For Brightstone Legal, the implementation team reports the following delivery problem: An audit asks which requirements have corresponding tests and the PM searches loosely named spreadsheets by hand. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. A sampled requirement has a traceable test case status and responsible owner.
  2. A selected scope change has one traceable decision and closure record.
  3. The board shows the current owner and state of each work item.
  4. The network identifies the controlling sequence and the effect of delaying a critical activity.

Explanation

Correct Answer

A:

A sampled requirement has a traceable test case status and responsible owner. This is the relevant acceptance evidence because it tests whether the corrective action (Maintain a requirements traceability matrix linking needs designs and acceptance tests.) fixed the original concern (An audit asks which requirements have corresponding tests and the PM searches loosely named spreadsheets by hand.) at Brightstone Legal, rather than relying only on a task marked complete. The affected work concerns matter files and sensitive case records.

Incorrect Answers

B:

A selected scope change has one traceable decision and closure record. This evidence would be useful for another condition (A project manager needs a formal record of proposed scope modifications but stores change requests as unrelated emails.) and its different action (Maintain a controlled change log with identifiers impacts approvals and implementation status.). At Brightstone Legal, it does not demonstrate the required project outcome: A sampled requirement has a traceable test case status and responsible owner.

C:

The board shows the current owner and state of each work item. This evidence would be useful for another condition (The project team needs to track work item movement through analysis build and review but reports only aggregate hours.) and its different action (Use a task board with visible workflow states ownership and blocked-item indicators.). At Brightstone Legal, it does not demonstrate the required project outcome: A sampled requirement has a traceable test case status and responsible owner.

D:

The network identifies the controlling sequence and the effect of delaying a critical activity. This evidence would be useful for another condition (A steering group asks which planned activities control the project completion date but the team provides only a list of deadlines.) and its different action (Use a project network diagram with dependencies and critical path analysis.). At Brightstone Legal, it does not demonstrate the required project outcome: A sampled requirement has a traceable test case status and responsible owner.