Question 200
A service provider design workshop presents the following case: A company transports sensitive east-west tenant traffic in a shared overlay but uses no route-target import controls, allowing intertenant prefixes to leak. Which recurring design governance control best prevents the problem from returning?
Explanation
Correct Answer
This governance measure targets recurrence of the identified architectural risk: Overlay encapsulation alone does not create routing isolation without correct control-plane policy. It supports sustained validation using: A test tenant cannot learn or reach another tenant's routes except through approved shared services.
Incorrect Answers
This operational control is aimed at a different concern: A regional fabric uses a single BGP route reflector without redundant reachability and a planned maintenance event removes new EVPN routes. The current design risk remains: Overlay encapsulation alone does not create routing isolation without correct control-plane policy.
This operational control is aimed at a different concern: A retail SD-WAN adds two broadband circuits but both are routed through one provider aggregation cabinet in the town. The current design risk remains: Overlay encapsulation alone does not create routing isolation without correct control-plane policy.
This operational control is aimed at a different concern: An enterprise asks network automation to change ACLs by REST API but does not publish a schema or version for the device intent model. The current design risk remains: Overlay encapsulation alone does not create routing isolation without correct control-plane policy.