McAfee-Secured Website

Exam Bundle

Exam Code: 400-007

Exam Name Cisco Certified Design Expert

Certification Provider: Cisco

Corresponding Certification: CCDE

Cisco 400-007 Bundle $19.99

100% Cisco 400-007 Guaranteed Success With Testking Training Materials

Get Real 400-007 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    400-007 Questions & Answers

    349 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual 400-007 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • Study Guide

    400-007 Study Guide

    934 PDF Pages

    Developed by industry experts, this 934-page guide spells out in painstaking detail all of the information you need to ace 400-007 exam.

Cisco Certified Design Expert (400-007) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $154.98
Bundle Price: $134.99

Purchase Individually

  • Questions & Answers

    Questions & Answers

    349 Questions

    $124.99
  • Study Guide

    Study Guide

    934 PDF Pages

    $29.99

Cisco 400-007 Practice Test 19

Question 180

A service provider design workshop presents the following case: A retail SD-WAN adds two broadband circuits but both are routed through one provider aggregation cabinet in the town. Which recurring design governance control best prevents the problem from returning?

  1. Audit tenant route-target intent as part of fabric automation testing.
  2. Tie route decisions to service SLOs and validate under representative impairment.
  3. Review sensor locations against actual user and application populations.
  4. Trace last-mile duct and provider aggregation diversity for critical branches.

Explanation

Correct Answer

D:

This governance measure targets recurrence of the identified architectural risk: Multiple logical circuits can still share one physical single point of failure. It supports sustained validation using: A cabinet outage test or path dependency assessment shows at least one independent operational route.

Incorrect Answers

A:

This operational control is aimed at a different concern: A company transports sensitive east-west tenant traffic in a shared overlay but uses no route-target import controls, allowing intertenant prefixes to leak. The current design risk remains: Multiple logical circuits can still share one physical single point of failure.

B:

This operational control is aimed at a different concern: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. The current design risk remains: Multiple logical circuits can still share one physical single point of failure.

C:

This operational control is aimed at a different concern: An operations team captures one-way latency at headquarters yet claims that distant remote users have the same experience. The current design risk remains: Multiple logical circuits can still share one physical single point of failure.

Question 181

A network architect is reviewing a high-level design: A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. Which network architecture or design decision best meets the stated requirements?

  1. Design per-tenant VRFs and explicit route-target import/export policy with segmentation tests.
  2. Design resilient IP underlay ECMP and overlay endpoint advertisements with supported convergence.
  3. Use routed intersite connectivity and application migration patterns instead of indiscriminate L2 stretch.
  4. Establish an authoritative source of truth and require drift reconciliation before applying changes.

Explanation

Correct Answer

B:

This high-level design choice addresses the stated constraints: A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. The design risk is: An overlay depends on underlay routing continuity even when tenant control is abstracted. The defining acceptance evidence is: A spine failure preserves VTEP reachability and approved tenant traffic.

Incorrect Answers

A:

This may be suitable for a different CCDE design context (2.5, Software-defined architecture and controller-based solution design): A company transports sensitive east-west tenant traffic in a shared overlay but uses no route-target import controls, allowing intertenant prefixes to leak. It does not resolve the present constraint: An overlay depends on underlay routing continuity even when tenant control is abstracted.

C:

This may be suitable for a different CCDE design context (2.5, Software-defined architecture and controller-based solution design): A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. It does not resolve the present constraint: An overlay depends on underlay routing continuity even when tenant control is abstracted.

D:

This may be suitable for a different CCDE design context (2.4, Network automation and orchestration design, integration, and ongoing support): A network inventory and an Ansible playbook disagree on BGP neighbors, causing automated removal of a newly approved peer. It does not resolve the present constraint: An overlay depends on underlay routing continuity even when tenant control is abstracted.

Question 182

A network architect is reviewing a high-level design: A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. Which measurable acceptance result most directly validates that design decision?

  1. A cabinet outage test or path dependency assessment shows at least one independent operational route.
  2. A test tenant cannot learn or reach another tenant's routes except through approved shared services.
  3. A spine failure preserves VTEP reachability and approved tenant traffic.
  4. The platform detects the rejected policy and reverts the batch before marking it complete.

Explanation

Correct Answer

C:

This measurable result validates the proposed architecture: A spine failure preserves VTEP reachability and approved tenant traffic. It directly checks the selected design (Design resilient IP underlay ECMP and overlay endpoint advertisements with supported convergence.) against the original requirements.

Incorrect Answers

A:

This could validate a different design context: A retail SD-WAN adds two broadband circuits but both are routed through one provider aggregation cabinet in the town. It does not demonstrate the necessary outcome for this case: A spine failure preserves VTEP reachability and approved tenant traffic.

B:

This could validate a different design context: A company transports sensitive east-west tenant traffic in a shared overlay but uses no route-target import controls, allowing intertenant prefixes to leak. It does not demonstrate the necessary outcome for this case: A spine failure preserves VTEP reachability and approved tenant traffic.

D:

This could validate a different design context: A change platform marks a push successful because its API returned HTTP 200 even though the device rejected a critical route policy after commit. It does not demonstrate the necessary outcome for this case: A spine failure preserves VTEP reachability and approved tenant traffic.

Question 183

A network architect is reviewing a high-level design: A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. Which architectural tradeoff or failure mechanism most directly explains the design concern?

  1. Link price is not a substitute for application transport quality in path policy.
  2. Centralized route advertisement dependencies need redundancy even in multipath fabrics.
  3. Underlay reachability does not prove feature-rich end-to-end IP service correctness.
  4. An overlay depends on underlay routing continuity even when tenant control is abstracted.

Explanation

Correct Answer

D:

This tradeoff explains the reported network design challenge: A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. A requirement-aligned design would: Design resilient IP underlay ECMP and overlay endpoint advertisements with supported convergence. Its validation is: A spine failure preserves VTEP reachability and approved tenant traffic.

Incorrect Answers

A:

This principle belongs to another architecture problem: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. The specific current tradeoff is instead: An overlay depends on underlay routing continuity even when tenant control is abstracted.

B:

This principle belongs to another architecture problem: A regional fabric uses a single BGP route reflector without redundant reachability and a planned maintenance event removes new EVPN routes. The specific current tradeoff is instead: An overlay depends on underlay routing continuity even when tenant control is abstracted.

C:

This principle belongs to another architecture problem: A dual-stack branch reaches a cloud API through a stateful firewall, NAT, MPLS underlay, and an encrypted overlay, but the design tests only ICMP to the carrier edge. The specific current tradeoff is instead: An overlay depends on underlay routing continuity even when tenant control is abstracted.

Question 184

A network architect is reviewing a high-level design: A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. Which recurring design governance control best prevents the problem from returning?

  1. Validate underlay failure scenarios before extending overlay segments.
  2. Include reflector isolation and maintenance tests in fabric acceptance.
  3. Tie route decisions to service SLOs and validate under representative impairment.
  4. Include actual encapsulation overhead in every overlay path budget.

Explanation

Correct Answer

A:

This governance measure targets recurrence of the identified architectural risk: An overlay depends on underlay routing continuity even when tenant control is abstracted. It supports sustained validation using: A spine failure preserves VTEP reachability and approved tenant traffic.

Incorrect Answers

B:

This operational control is aimed at a different concern: A regional fabric uses a single BGP route reflector without redundant reachability and a planned maintenance event removes new EVPN routes. The current design risk remains: An overlay depends on underlay routing continuity even when tenant control is abstracted.

C:

This operational control is aimed at a different concern: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. The current design risk remains: An overlay depends on underlay routing continuity even when tenant control is abstracted.

D:

This operational control is aimed at a different concern: A company inserts a VXLAN overlay over a WAN with 1,500-byte MTU and observes loss of large encrypted application packets. The current design risk remains: An overlay depends on underlay routing continuity even when tenant control is abstracted.

Question 185

A CCDE design team receives these customer constraints: A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. Which network architecture or design decision best meets the stated requirements?

  1. Design resilient IP underlay ECMP and overlay endpoint advertisements with supported convergence.
  2. Use application-aware routing with measured SLA thresholds and fallback hysteresis.
  3. Use routed intersite connectivity and application migration patterns instead of indiscriminate L2 stretch.
  4. Add pre-change route-policy simulation, staged rollout, health gates, and automatic rollback.

Explanation

Correct Answer

C:

This high-level design choice addresses the stated constraints: A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. The design risk is: Extended L2 increases shared failure domains and control dependencies across sites. The defining acceptance evidence is: A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.

Incorrect Answers

A:

This may be suitable for a different CCDE design context (2.5, Software-defined architecture and controller-based solution design): A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. It does not resolve the present constraint: Extended L2 increases shared failure domains and control dependencies across sites.

B:

This may be suitable for a different CCDE design context (2.5, Software-defined architecture and controller-based solution design): An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. It does not resolve the present constraint: Extended L2 increases shared failure domains and control dependencies across sites.

D:

This may be suitable for a different CCDE design context (2.4, Network automation and orchestration design, integration, and ongoing support): A CI/CD pipeline automatically promotes every route-map change from lab to production without validating traffic impact on dependent sites. It does not resolve the present constraint: Extended L2 increases shared failure domains and control dependencies across sites.

Question 186

A CCDE design team receives these customer constraints: A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. Which measurable acceptance result most directly validates that design decision?

  1. A test tenant cannot learn or reach another tenant's routes except through approved shared services.
  2. Calls remain within loss and jitter limits when the preferred inexpensive transport degrades.
  3. Loss of one controller path does not prevent critical policy continuity or documented recovery.
  4. A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.

Explanation

Correct Answer

D:

This measurable result validates the proposed architecture: A site loop or broadcast storm remains isolated while workload movement follows an approved routed process. It directly checks the selected design (Use routed intersite connectivity and application migration patterns instead of indiscriminate L2 stretch.) against the original requirements.

Incorrect Answers

A:

This could validate a different design context: A company transports sensitive east-west tenant traffic in a shared overlay but uses no route-target import controls, allowing intertenant prefixes to leak. It does not demonstrate the necessary outcome for this case: A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.

B:

This could validate a different design context: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. It does not demonstrate the necessary outcome for this case: A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.

C:

This could validate a different design context: A city deploys a single SDN controller with no alternate control channel and a carrier cut cuts its only southbound connection. It does not demonstrate the necessary outcome for this case: A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.

Question 187

A CCDE design team receives these customer constraints: A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. Which architectural tradeoff or failure mechanism most directly explains the design concern?

  1. Extended L2 increases shared failure domains and control dependencies across sites.
  2. Centralized route advertisement dependencies need redundancy even in multipath fabrics.
  3. An overlay depends on underlay routing continuity even when tenant control is abstracted.
  4. Federation balances policy consistency against fault containment and site autonomy.

Explanation

Correct Answer

A:

This tradeoff explains the reported network design challenge: A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. A requirement-aligned design would: Use routed intersite connectivity and application migration patterns instead of indiscriminate L2 stretch. Its validation is: A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.

Incorrect Answers

B:

This principle belongs to another architecture problem: A regional fabric uses a single BGP route reflector without redundant reachability and a planned maintenance event removes new EVPN routes. The specific current tradeoff is instead: Extended L2 increases shared failure domains and control dependencies across sites.

C:

This principle belongs to another architecture problem: A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. The specific current tradeoff is instead: Extended L2 increases shared failure domains and control dependencies across sites.

D:

This principle belongs to another architecture problem: A government network requires consistent policy across districts but forbids an outage in one district from taking down the national management cluster. The specific current tradeoff is instead: Extended L2 increases shared failure domains and control dependencies across sites.

Question 188

A CCDE design team receives these customer constraints: A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. Which recurring design governance control best prevents the problem from returning?

  1. Tie route decisions to service SLOs and validate under representative impairment.
  2. Require explicit necessity and fault analysis for every proposed L2 extension.
  3. Include reflector isolation and maintenance tests in fabric acceptance.
  4. Treat route reachability and user impact as release gates for network policy.

Explanation

Correct Answer

B:

This governance measure targets recurrence of the identified architectural risk: Extended L2 increases shared failure domains and control dependencies across sites. It supports sustained validation using: A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.

Incorrect Answers

A:

This operational control is aimed at a different concern: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. The current design risk remains: Extended L2 increases shared failure domains and control dependencies across sites.

C:

This operational control is aimed at a different concern: A regional fabric uses a single BGP route reflector without redundant reachability and a planned maintenance event removes new EVPN routes. The current design risk remains: Extended L2 increases shared failure domains and control dependencies across sites.

D:

This operational control is aimed at a different concern: A CI/CD pipeline automatically promotes every route-map change from lab to production without validating traffic impact on dependent sites. The current design risk remains: Extended L2 increases shared failure domains and control dependencies across sites.

Question 189

A regional network transformation proposal describes this situation: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. Which network architecture or design decision best meets the stated requirements?

  1. Design resilient IP underlay ECMP and overlay endpoint advertisements with supported convergence.
  2. Design per-tenant VRFs and explicit route-target import/export policy with segmentation tests.
  3. Use versioned model-driven interfaces with validation and idempotent desired-state transactions.
  4. Use application-aware routing with measured SLA thresholds and fallback hysteresis.

Explanation

Correct Answer

D:

This high-level design choice addresses the stated constraints: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. The design risk is: Link price is not a substitute for application transport quality in path policy. The defining acceptance evidence is: Calls remain within loss and jitter limits when the preferred inexpensive transport degrades.

Incorrect Answers

A:

This may be suitable for a different CCDE design context (2.5, Software-defined architecture and controller-based solution design): A campus VXLAN fabric is deployed without a stable underlay routing design and loses VTEP reachability when one spine fails. It does not resolve the present constraint: Link price is not a substitute for application transport quality in path policy.

B:

This may be suitable for a different CCDE design context (2.5, Software-defined architecture and controller-based solution design): A company transports sensitive east-west tenant traffic in a shared overlay but uses no route-target import controls, allowing intertenant prefixes to leak. It does not resolve the present constraint: Link price is not a substitute for application transport quality in path policy.

C:

This may be suitable for a different CCDE design context (2.4, Network automation and orchestration design, integration, and ongoing support): An enterprise asks network automation to change ACLs by REST API but does not publish a schema or version for the device intent model. It does not resolve the present constraint: Link price is not a substitute for application transport quality in path policy.

Question 190

A regional network transformation proposal describes this situation: An enterprise changes SD-WAN application steering to the cheapest circuit while ignoring voice jitter and packet loss under congestion. Which measurable acceptance result most directly validates that design decision?

  1. Calls remain within loss and jitter limits when the preferred inexpensive transport degrades.
  2. A cabinet outage test or path dependency assessment shows at least one independent operational route.
  3. A site loop or broadcast storm remains isolated while workload movement follows an approved routed process.
  4. Loss of one controller path does not prevent critical policy continuity or documented recovery.

Explanation

Correct Answer

A:

This measurable result validates the proposed architecture: Calls remain within loss and jitter limits when the preferred inexpensive transport degrades. It directly checks the selected design (Use application-aware routing with measured SLA thresholds and fallback hysteresis.) against the original requirements.

Incorrect Answers

B:

This could validate a different design context: A retail SD-WAN adds two broadband circuits but both are routed through one provider aggregation cabinet in the town. It does not demonstrate the necessary outcome for this case: Calls remain within loss and jitter limits when the preferred inexpensive transport degrades.

C:

This could validate a different design context: A bank stretches one L2 broadcast domain across data centers for application mobility although the carrier RTT and fault containment requirements prohibit this. It does not demonstrate the necessary outcome for this case: Calls remain within loss and jitter limits when the preferred inexpensive transport degrades.

D:

This could validate a different design context: A city deploys a single SDN controller with no alternate control channel and a carrier cut cuts its only southbound connection. It does not demonstrate the necessary outcome for this case: Calls remain within loss and jitter limits when the preferred inexpensive transport degrades.