Question 320
To prevent recurrence of this provider network issue: A customer uses DS-Lite but expects its home CPE to perform normal IPv4 public-NAT termination locally, and the B4 tunnel is never provisioned. Which control should be retained?
Explanation
Correct Answer
Validate B4 reachability and AFTR capacity at subscriber activation. This helps prevent recurrence of the issue: A customer uses DS-Lite but expects its home CPE to perform normal IPv4 public-NAT termination locally, and the B4 tunnel is never provisioned. Acceptance evidence should be: A test IPv4 session traverses the IPv6 access and exits through the correct AFTR public address.
Incorrect Answers
Test deterministic mapping and log lookup as part of CGNAT capacity exercises. That is a sensible control for ANOTHER scenario: A CGNAT operator has millions of sessions but translation logs record only subscriber private addresses, making legal attribution impossible for shared public IPv4 connections. It is less targeted to this issue than: Validate B4 reachability and AFTR capacity at subscriber activation.
Audit port-block assignments and exhausted mapping pools. That is a sensible control for ANOTHER scenario: An ISP assigns customer IPv4 address blocks through CGNAT but configures identical port-set mappings on two subscribers behind the same public address, causing connection collisions. It is less targeted to this issue than: Validate B4 reachability and AFTR capacity at subscriber activation.
Test component-prefix ownership before exporting aggregates. That is a sensible control for ANOTHER scenario: A link between routing domains advertises a summary into the wrong IS-IS level, so traffic loops toward an area without the actual component prefix. It is less targeted to this issue than: Validate B4 reachability and AFTR capacity at subscriber activation.