McAfee-Secured Website

Exam Code: 156-315.82

Exam Name: Check Point Certified Security Expert - R82 (CCSE)

Certification Provider: Checkpoint

Corresponding Certification: CCSE R82

100% Checkpoint 156-315.82 Guaranteed Success With Testking Training Materials

Get Real 156-315.82 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

100 Questions & Answers with Testing Engine

"Check Point Certified Security Expert - R82 (CCSE) Exam", also known as 156-315.82 exam, is a Checkpoint certification exam.

Pass your tests with the always up-to-date 156-315.82 Exam Engine. Your 156-315.82 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Checkpoint 156-315.82 Practice Test 7

Question 60

Compliance reviewers ask why a managed gateway’s security rulebase fails specific Check Point best practices. Analysts have only log searches and cannot see configuration-grade rule findings. What management capability should be enabled for the assessment?

  1. Review Regulatory Compliance requirements and scores
  2. Activate the Compliance Software Blade
  3. Generate a Compliance Blade report in the Reports view
  4. Open Logs & Events and select Views

Explanation

Correct Answer

B:

Enable the Compliance Software Blade to assess configured policy against best-practice and regulatory rule requirements.

Incorrect Answers

A:

Viewing regulatory scores assumes the underlying compliance analysis capability is available.

C:

Exporting a static compliance report cannot generate policy-best-practice findings when the underlying analysis blade is disabled.

D:

A log Views filter analyzes events, not security best-practice rulebase compliance.

Question 61

An R82 Security Gateway must move to a specifically approved major release, while its current Jumbo Hotfix is already adequate. The change must run remotely through supported Central Deployment. Which job type fits the requested major-version transition?

  1. Choose Install a Specific Hotfix/Jumbo and enter the filename
  2. Use Central Deployment Version Upgrade to Specific Major Version
  3. Select gateways in SmartConsole and Install Hotfix/Jumbo
  4. Use the Install Hotfix/Jumbo deployment action

Explanation

Correct Answer

B:

Choose the specific Major Version Upgrade operation, not a Jumbo Hotfix action, for the approved target release.

Incorrect Answers

A:

Selecting a specific Jumbo package changes patch level, not the required major version.

C:

Install Hotfix/Jumbo applies within a release rather than upgrading to the named major release.

D:

A generic hotfix action does not satisfy a major-version upgrade request.

Question 62

After the replacement R82 management database imports and services start, SmartConsole connects successfully but the owner has not checked that critical access rules or gateway objects survived. Which acceptance activity should close the migration before gateways are pointed at the new manager?

  1. Invoke migrate_server import for the exported archive
  2. Disconnect the retired source before activating its replacement
  3. Connect with SmartConsole and inspect imported configuration
  4. Connect the new management host on the intended network

Explanation

Correct Answer

C:

Inspect the imported management policies, objects and relevant settings in SmartConsole against the pre-cutover baseline.

Incorrect Answers

A:

Re-running import can overwrite state and is not an acceptance inspection.

B:

Retiring the old host does not establish that required policy objects were preserved.

D:

Bringing the replacement host online does not prove database-content accuracy.

Question 63

A customer plans to enable traditional VSX mode on an already installed R82 ElasticXL cluster. The installation guide states that ElasticXL supports VSNext, and the VSNext choice must be made during installation. What design decision should the architect make?

  1. Select VSNext rather than unsupported Traditional VSX mode
  2. Create one Single Management Object for the entire cluster
  3. Install policy on the cluster single gateway object
  4. Add supported members through ElasticXL admission and cloning

Explanation

Correct Answer

A:

Plan an ElasticXL deployment in VSNext mode from the initial installation instead of expecting Traditional VSX or post-install conversion.

Incorrect Answers

B:

A single management object is required but cannot add the unsupported Traditional VSX mode.

C:

Installing policy on the cluster does not change its supported virtualization mode.

D:

Adding members does not convert an existing cluster into a VSNext installation.

Question 64

A site-recovery exercise will capture backups for two R82 management HA peers. The standby receives changes continuously and the team wants a recoverable, mutually consistent pair of images. Which backup approach best limits mismatch between recovered databases?

  1. Back up or snapshot all HA servers at the same point in time
  2. Use Management HA revision-based synchronization for published changes
  3. Initiate a manual synchronization between management peers
  4. Verify exactly one Active and remaining Standby status

Explanation

Correct Answer

A:

Coordinate backup or snapshot points for both HA servers so each recoverable image represents compatible management state.

Incorrect Answers

B:

Incremental revision synchronization alone does not make independently timed snapshots consistent.

C:

A manual sync at an arbitrary time does not guarantee both backups represent the same point.

D:

Verifying role names after backup does not align the databases captured at different times.

Question 65

A newly published internal server has a Manual NAT rule and a public address object, but connections still drop against the gateway rulebase. The NAT log shows the address translation matched. Which missing configuration dimension should be checked before changing NAT again?

  1. Create translated objects, NAT rule, and matching Access Control rule
  2. Configure required Proxy ARP entries for the translated address
  3. Use the Translated Services column in a Manual NAT rule
  4. Configure supported NAT for management control connections

Explanation

Correct Answer

A:

Confirm the Access Control policy permits the applicable translated objects and service; NAT translation alone does not authorize the connection.

Incorrect Answers

B:

Proxy ARP matters if the translated IP is unreachable on its segment, but the NAT log already shows packets arriving.

C:

Translated Services is not the first missing control when logs show NAT worked but the rulebase dropped traffic.

D:

Management-server NAT is irrelevant to access to the published application host.

Question 66

An R82 site-to-site peer negotiates an IPv6-only protected network over an IPv6 outer tunnel. A design review proposes IPv4 payload inside the IPv6 tunnel to reuse old selectors. Which supported transport should be retained for the IPv6 site?

  1. Use IKEv2 for IPv6 VPN negotiations
  2. Use the matching IPv6-in-IPv6 tunnel scheme and IKEv2
  3. Verify phase-two traffic selectors and matching policy rules
  4. Verify VPN domain definitions and encryption-domain selectors

Explanation

Correct Answer

B:

Use IPv6 payload in an IPv6 VPN tunnel with IKEv2; mismatched IPv4-inside-IPv6 encapsulation is not supported here.

Incorrect Answers

A:

Selecting IKEv2 alone does not make IPv4-over-IPv6 payload encapsulation valid.

C:

Phase-two policy review remains important but does not make the unsupported mixed encapsulation work.

D:

Updating the VPN domain alone cannot change the unsupported outer/inner address-family combination.

Question 67

A custom SmartEvent detection correctly flags unusual authentication activity, but a known approved monitoring subnet must be excluded to prevent daily false positives. The team cannot disable the entire event or reduce detection elsewhere. What should be configured?

  1. Adjust its event threshold after examining the event
  2. Configure a suitable event exception or exclusion
  3. Configure a SmartEvent threshold of log count and seconds
  4. Edit the relevant Event Definition threshold

Explanation

Correct Answer

B:

Add a targeted exception or exclusion for the known subnet in the event logic while keeping the main detection active.

Incorrect Answers

A:

Raising the global threshold may hide legitimate incidents outside the maintenance subnet.

C:

Changing count/time affects all sources rather than the single known exception.

D:

Tuning the whole event without an explicit source exclusion risks suppressing unrelated attacks.

Question 68

A central upgrade job was configured against ten gateways, but the approved ticket lists only six of them. Operators want to avoid changes to unapproved sites without altering the package contents. What is the safest job correction before execution?

  1. Use supported Central Deployment parallel target selection
  2. Check Management Server connectivity to selected gateways
  3. Use the Gateway & Servers deployment actions in SmartConsole
  4. Deploy packages to the explicitly selected target objects

Explanation

Correct Answer

D:

Restrict the Central Deployment target selection to the six explicitly approved objects before installing packages.

Incorrect Answers

A:

Parallel deployment controls how many jobs run, not which sites have change approval.

B:

Network reachability checks do not remove excess targets from the job.

C:

Opening the gateway deployment action without correcting target scope still risks unauthorized installation.

Question 69

A replacement management server is deployed at a different IP address than its predecessor. Managed gateways and related log servers must reconnect after the database import, and the upgrade guide requires additional control-plane planning for changed addresses. What should be included?

  1. Connect the new management host on the intended network
  2. Disconnect the retired source before activating its replacement
  3. Export on the source and import on the destination
  4. Prepare consistent /var/log/mdss.json with changed management IP addresses on affected servers, then plan gateway reconnection

Explanation

Correct Answer

D:

Plan the documented identity/address changes and required migration configuration for all affected management components and gateway reconnection.

Incorrect Answers

A:

Connecting only the new machine does not propagate required address changes to the rest of the environment.

B:

Disconnecting the old source reduces conflicts but does not rewrite identities and communication settings.

C:

Export/import without planning changed management addressing may leave managed components pointing to the old endpoint.

Question 70

An administrator needs to move a member from ElasticXL Site 1 into Site 2. It already appears as a managed member of Site 1, so it is not pending for enrollment in the second site. Which sequence does the R82 guide describe?

  1. Remove it then add as a pending member to the target site
  2. Add the pending appliance to the existing Site
  3. Create a new Site while admitting the pending appliance
  4. Use Gaia Portal Cluster Management Actions > Delete

Explanation

Correct Answer

A:

Remove the member from its current site, then admit it again as a pending appliance into the intended destination site.

Incorrect Answers

B:

Simply adding a new member to the current site does not relocate an existing member.

C:

Creating a new site does not by itself move a member currently assigned elsewhere.

D:

Deleting it without re-adding to the destination site does not complete the planned move.

Check Point Certified Security Expert - R82 (CCSE) (156-315.82) Practice Tests