Question 630
A management-HA changeover is reported as complete after planned maintenance. Operators can reach both R82 servers and want to ensure that the promotion did not leave a collision. The controls that address the separate requirement to recover administration when the active management node goes offline are already working as designed, and the change ticket must not disturb them. Which R82 action addresses the remaining symptom?
Explanation
Correct Answer
One Active peer is the expected result of controlled changeover. This directly addresses the documented incident evidence.
Incorrect Answers
A controlled management changeover restores an Active management server, but the current evidence calls for a different R82 operation.
Collision recovery should establish an authoritative Active node, yet that applies to resolve two active nodes safely during collision troubleshooting rather than the observed issue.
Demoting a server to Standby overwrites its data from the Active peer; this does not resolve the observed condition.