McAfee-Secured Website

Exam Code: KEO1

Exam Name: Secure Software Design

Certification Provider: WGU University

100% WGU University KEO1 Guaranteed Success With Testking Training Materials

Get Real KEO1 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

66 Questions & Answers with Testing Engine

"Secure Software Design Exam", also known as KEO1 exam, is a WGU University certification exam.

Pass your tests with the always up-to-date KEO1 Exam Engine. Your KEO1 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

WGU University KEO1 Practice Test 1

Question 1

At fictional Upland Comms, a software-security team is conducting a security incident follow-up assessment under a defined risk appetite and change authorization. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which security design action most directly addresses the documented problem?

  1. For the a security incident follow-up assessment at fictional Upland Comms, define verifiable vendor security requirements and contractual acceptance criteria before purchasing the service.
  2. For the a security incident follow-up assessment at fictional Upland Comms, replace standing access with time-bound, least-privilege support sessions subject to explicit approval and audit logging.
  3. For the a security incident follow-up assessment at fictional Upland Comms, establish a risk-based evaluation using authoritative attestation, configuration review, a scoped technical assessment, and documented exceptions.
  4. For the a security incident follow-up assessment at fictional Upland Comms, evaluate supported migration choices, lifecycle dates, compensating controls, and a funded replacement decision before production adoption.

Explanation

Writer-proposed answer: A (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

A:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

B:

Vendor remote-support scope concerns a different operational mechanism. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

C:

Focusing on acquired software security testing would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

D:

Software end-of-life dependency concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Question 2

At fictional Upland Comms, a software-security team is conducting a security incident follow-up assessment under a defined risk appetite and change authorization. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which independent verification evidence would most directly show that the proposed action succeeded?

  1. For the a security incident follow-up assessment at fictional Upland Comms, independent procurement acceptance references test outcomes, security configuration, risk owner, and remediation conditions.
  2. For the a security incident follow-up assessment at fictional Upland Comms, a completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.
  3. For the a security incident follow-up assessment at fictional Upland Comms, architecture decision records show a supported target, compatibility test results, sunset milestones, and accountable ownership.
  4. For the a security incident follow-up assessment at fictional Upland Comms, the reproducible build and software bill of materials identify the complete dependency lineage and a verified approved artifact digest.

Explanation

Writer-proposed answer: B (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

B:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

A:

This response concerns acquired software security testing. Here, a procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The confirming evidence is: A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

C:

Focusing on software end-of-life dependency would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

D:

Transitive dependency provenance concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Question 3

At fictional Upland Comms, a software-security team is conducting a security incident follow-up assessment under a defined risk appetite and change authorization. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which secure-design principle best explains the appropriate approach?

  1. For the a security incident follow-up assessment at fictional Upland Comms, a third-party component is both a security dependency and a governance obligation throughout its lifecycle.
  2. For the a security incident follow-up assessment at fictional Upland Comms, provenance and dependency inventory reduce software supply-chain uncertainty but do not by themselves prove a component is vulnerability-free.
  3. For the a security incident follow-up assessment at fictional Upland Comms, secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.
  4. For the a security incident follow-up assessment at fictional Upland Comms, external support access is a privileged trust boundary that requires controllable authorization and accountability.

Explanation

Writer-proposed answer: C (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

C:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

A:

This response concerns open-source license and security review. Here, a procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The confirming evidence is: A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

B:

Transitive dependency provenance concerns a different operational mechanism. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

D:

Vendor remote-support scope concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Question 4

At fictional Upland Comms, a software-security team is conducting a security incident follow-up assessment under a defined risk appetite and change authorization. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which consequence is most directly associated with leaving this documented problem unresolved?

  1. For the a security incident follow-up assessment at fictional Upland Comms, excess personal data may be exposed through a breach or retained beyond legitimate processing needs.
  2. For the a security incident follow-up assessment at fictional Upland Comms, late or unreliable notification may delay containment, breach assessment, and regulatory decisions.
  3. For the a security incident follow-up assessment at fictional Upland Comms, compromise of a supplier account could provide persistent unauthorized access to sensitive production systems.
  4. For the a security incident follow-up assessment at fictional Upland Comms, the organization can inherit unmitigated security obligations and have no enforceable response when weaknesses emerge.

Explanation

Writer-proposed answer: D (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

D:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

A:

This response concerns third-party data processing boundary. Here, a procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The confirming evidence is: A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

B:

Supplier incident escalation concerns a different operational mechanism. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

C:

Focusing on vendor remote-support scope would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

Question 5

At fictional Upland Comms, a software-security team is conducting a security incident follow-up assessment under a defined risk appetite and change authorization. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which repeatable engineering safeguard would most directly reduce recurrence?

  1. For the a security incident follow-up assessment at fictional Upland Comms, maintain a supplier risk register with renewal reviews, evidence expiry dates, breach-notification tests, and documented exit triggers.
  2. For the a security incident follow-up assessment at fictional Upland Comms, enforce dependency review, signed artifact policies, inventory monitoring, and exception expiry in the build pipeline.
  3. For the a security incident follow-up assessment at fictional Upland Comms, automate data-sharing schema checks and periodically reassess third-party retention and access requirements.
  4. For the a security incident follow-up assessment at fictional Upland Comms, require versioned component approval with scheduled advisories review and a documented replacement path.

Explanation

Writer-proposed answer: A (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

A:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

B:

Transitive dependency provenance concerns a different operational mechanism. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

C:

Focusing on third-party data processing boundary would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

D:

Open-source license and security review concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Question 6

At fictional Cedarhaven Supplies, a software-security team is conducting a regulated data-protection review while protecting cross-tenant boundaries. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which security design action most directly addresses the documented problem?

  1. For the a regulated data-protection review at fictional Cedarhaven Supplies, evaluate supported migration choices, lifecycle dates, compensating controls, and a funded replacement decision before production adoption.
  2. For the a regulated data-protection review at fictional Cedarhaven Supplies, define verifiable vendor security requirements and contractual acceptance criteria before purchasing the service.
  3. For the a regulated data-protection review at fictional Cedarhaven Supplies, resolve the dependency tree, establish trusted package provenance, pin an approved version, and block unverified artifacts until reviewed.
  4. For the a regulated data-protection review at fictional Cedarhaven Supplies, define incident notification channels, escalation timelines, evidence preservation, and shared responsibilities with the supplier.

Explanation

Writer-proposed answer: B (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

B:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

A:

This response concerns software end-of-life dependency. Here, a procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The confirming evidence is: A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

C:

Focusing on transitive dependency provenance would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

D:

Supplier incident escalation concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Question 7

At fictional Cedarhaven Supplies, a software-security team is conducting a regulated data-protection review while protecting cross-tenant boundaries. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which independent verification evidence would most directly show that the proposed action succeeded?

  1. For the a regulated data-protection review at fictional Cedarhaven Supplies, a tabletop exercise demonstrates contacts, time thresholds, coordinated triage, and accurate incident communications.
  2. For the a regulated data-protection review at fictional Cedarhaven Supplies, independent procurement acceptance references test outcomes, security configuration, risk owner, and remediation conditions.
  3. For the a regulated data-protection review at fictional Cedarhaven Supplies, a completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.
  4. For the a regulated data-protection review at fictional Cedarhaven Supplies, an approval record includes license compatibility, supported versions, vulnerability disposition, and named maintenance owner.

Explanation

Writer-proposed answer: C (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

C:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

A:

This response concerns supplier incident escalation. Here, a procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The confirming evidence is: A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

B:

Acquired software security testing concerns a different operational mechanism. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

D:

Open-source license and security review concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Question 8

At fictional Cedarhaven Supplies, a software-security team is conducting a regulated data-protection review while protecting cross-tenant boundaries. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which secure-design principle best explains the appropriate approach?

  1. For the a regulated data-protection review at fictional Cedarhaven Supplies, external support access is a privileged trust boundary that requires controllable authorization and accountability.
  2. For the a regulated data-protection review at fictional Cedarhaven Supplies, product lifecycle and support guarantees are security design inputs, not tasks deferred until a vulnerability appears.
  3. For the a regulated data-protection review at fictional Cedarhaven Supplies, provenance and dependency inventory reduce software supply-chain uncertainty but do not by themselves prove a component is vulnerability-free.
  4. For the a regulated data-protection review at fictional Cedarhaven Supplies, secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Explanation

Writer-proposed answer: D (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

D:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

A:

This response concerns vendor remote-support scope. Here, a procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The confirming evidence is: A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

B:

Software end-of-life dependency concerns a different operational mechanism. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

C:

Focusing on transitive dependency provenance would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

Question 9

At fictional Cedarhaven Supplies, a software-security team is conducting a regulated data-protection review while protecting cross-tenant boundaries. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which consequence is most directly associated with leaving this documented problem unresolved?

  1. For the a regulated data-protection review at fictional Cedarhaven Supplies, the organization can inherit unmitigated security obligations and have no enforceable response when weaknesses emerge.
  2. For the a regulated data-protection review at fictional Cedarhaven Supplies, the organization may deploy insecure defaults that supplier certifications did not evaluate.
  3. For the a regulated data-protection review at fictional Cedarhaven Supplies, a hidden license conflict or abandoned vulnerable library can disrupt release and create future remediation debt.
  4. For the a regulated data-protection review at fictional Cedarhaven Supplies, an untrusted dependency could introduce malicious code or unsupported components into releases without an obvious direct dependency change.

Explanation

Writer-proposed answer: A (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

A:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

B:

Acquired software security testing concerns a different operational mechanism. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

C:

Focusing on open-source license and security review would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

D:

Transitive dependency provenance concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Question 10

At fictional Cedarhaven Supplies, a software-security team is conducting a regulated data-protection review while protecting cross-tenant boundaries. The case observation is: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The team must select a defensible control or assessment. Which repeatable engineering safeguard would most directly reduce recurrence?

  1. For the a regulated data-protection review at fictional Cedarhaven Supplies, require versioned component approval with scheduled advisories review and a documented replacement path.
  2. For the a regulated data-protection review at fictional Cedarhaven Supplies, maintain a supplier risk register with renewal reviews, evidence expiry dates, breach-notification tests, and documented exit triggers.
  3. For the a regulated data-protection review at fictional Cedarhaven Supplies, test supplier response playbooks and update contacts, service dependencies, and notification obligations regularly.
  4. For the a regulated data-protection review at fictional Cedarhaven Supplies, enforce dependency review, signed artifact policies, inventory monitoring, and exception expiry in the build pipeline.

Explanation

Writer-proposed answer: B (UNVERIFIED)

Preliminary individual option explanations — NOT expert validated

Correct Answer

B:

Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control. A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

Incorrect Answers

A:

This response concerns open-source license and security review. Here, a procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion. The confirming evidence is: A completed vendor review maps each critical control to contract language, tested evidence, a responsible party, and an exit obligation.

C:

Focusing on supplier incident escalation would leave this problem unresolved: A procurement team is adopting a scheduling SaaS product, but the agreement has no explicit requirements for vulnerability notification, data segregation, or secure deletion.

D:

Transitive dependency provenance concerns another aspect of the problem. Secure acquisition establishes assurance requirements before reliance on software outside the buyer's direct development control.

Secure Software Design (KEO1) Practice Tests