McAfee-Secured Website

Exam Bundle

Exam Code: 2V0-17.25

Exam Name VMware Cloud Foundation 9.0 Administrator

Certification Provider: VMware

Corresponding Certification: VCP-VCF Administrator

VMware 2V0-17.25 Bundle $19.99

100% VMware 2V0-17.25 Guaranteed Success With Testking Training Materials

Get Real 2V0-17.25 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    2V0-17.25 Questions & Answers

    100 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual 2V0-17.25 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • Study Guide

    2V0-17.25 Study Guide

    121 PDF Pages

    Developed by industry experts, this 121-page guide spells out in painstaking detail all of the information you need to ace 2V0-17.25 exam.

VMware Cloud Foundation 9.0 Administrator (2V0-17.25) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $154.98
Bundle Price: $134.99

Purchase Individually

  • Questions & Answers

    Questions & Answers

    100 Questions

    $124.99
  • Study Guide

    Study Guide

    121 PDF Pages

    $29.99

VMware 2V0-17.25 Practice Test 14

Question 130

Scenario: An operations engineer must explain how a vSphere Distributed Switch differs from NSX overlay networking in a VCF deployment. Which observation would demonstrate that the requirement is satisfied?

  1. A port group is created but the required NSX overlay tenant segment is absent
  2. Storage policies appear healthy while all virtual networks lose host connectivity
  3. Host uplinks and port groups are managed in vSphere while tenant overlays use their intended NSX constructs
  4. NSX segment metadata exists but ESX uplinks are disconnected from the physical fabric

Explanation

Correct Answer

C:

That confirms the correct placement of switching and overlay configuration.

Incorrect Answers

A:

Virtual switch success alone cannot establish tenant overlay networking.

B:

Storage compliance is not a substitute for working virtual switching.

D:

A logical segment without working host transport cannot carry traffic.

Question 131

Scenario: A VCF administrator is tracing a dropped north-south packet and needs to distinguish the NSX Edge function from host-local distributed switching. What is the most defensible next step for the VCF administrator?

  1. Disable the physical router's logs rather than inspect NSX edge and gateway policy
  2. Inspect only the guest NIC driver and assume all north-south routing occurs there
  3. Change VM snapshots to influence external packet forwarding
  4. Inspect the NSX Edge uplinks and relevant gateway routing path for north-south services

Explanation

Correct Answer

D:

Edge nodes provide gateway service functions at the boundary between virtual and external networks.

Incorrect Answers

A:

Removing evidence cannot resolve an external traffic path defect.

B:

A guest interface does not control NSX gateway forwarding between networks.

C:

Snapshot management is unrelated to gateway or uplink routing.

Question 132

Scenario: A VCF administrator is tracing a dropped north-south packet and needs to distinguish the NSX Edge function from host-local distributed switching. During acceptance testing, what result should the team require?

  1. An overlay VM can ping a peer but traffic to external subnets still fails
  2. External path routes exist but stateful gateway policy drops the requested service flow
  3. A gateway has a valid name but its Edge uplink VLAN is wrong
  4. Packet tracing reveals the expected Edge/gateway forwarding and external next hop

Explanation

Correct Answer

D:

This confirms the traffic crosses the intended north-south data path.

Incorrect Answers

A:

East-west success cannot validate the NSX external gateway.

B:

Routing reachability alone is insufficient without permitted service policy.

C:

Control-plane naming cannot replace physical connectivity.

Question 133

Scenario: An ESX host's vDS uplink is reconfigured, and several guest networks become unreachable only after one physical NIC fails. Which configuration change best resolves this problem?

  1. Increase the guest VM disk reservation to improve network failover
  2. Assume a standby vmnic reaches all VLANs merely because its link is up
  3. Review active/standby uplink mappings and associated physical switch VLAN trunks
  4. Move all networks to one untrunked port to simplify redundancy

Explanation

Correct Answer

C:

Virtual switch failover requires that alternate paths carry every intended VLAN.

Incorrect Answers

A:

Storage reservation cannot correct a miswired switching path.

B:

A physical link may be connected to a switch port with different VLAN permissions.

D:

A single incompatible physical port undermines multiple network services.

Question 134

Scenario: An ESX host's vDS uplink is reconfigured, and several guest networks become unreachable only after one physical NIC fails. What evidence distinguishes a successful change from a misleading green status?

  1. The standby uplink shows link-up but the guest VLAN is absent from its trunk
  2. Management connectivity survives but tenant application VLANs vanish on failover
  3. A new port-group label is created while the same physical VLAN mismatch remains
  4. VM traffic remains on the correct VLAN after a controlled active-uplink failure

Explanation

Correct Answer

D:

That verifies both logical teaming and physical fabric compatibility.

Incorrect Answers

A:

Link presence does not establish correct tagged traffic forwarding.

B:

Host control survival does not prove all workload port groups are redundant.

C:

Labels do not modify upstream switch trunk configuration.

Question 135

Scenario: Two VCF workload clusters need network policies that persist as hosts are added without recreating local virtual switches on each host. How should the platform team proceed?

  1. Configure independent standard switches manually on every host with unrelated policies
  2. Use VM guest static routes as a substitute for host switch configuration
  3. Use an approved vSphere Distributed Switch and consistent distributed port groups
  4. Configure one distributed port group but omit uplink mappings on new hosts

Explanation

Correct Answer

C:

Centralized switch configuration keeps host networking aligned as cluster membership grows.

Incorrect Answers

A:

Host-local switches increase drift and complicate consistent cluster operation.

B:

Guest routing cannot provide centralized virtual switch port policy.

D:

The switch object alone does not give new nodes working physical transport.

Question 136

Scenario: Two VCF workload clusters need network policies that persist as hosts are added without recreating local virtual switches on each host. Which measured outcome would verify the intended behavior?

  1. Existing VMs work but every newly added host has different guest VLAN mappings
  2. Port group permissions are documented but differ between hosts after manual edits
  3. New hosts join with expected distributed port groups and correct VLAN connectivity
  4. A host receives the vDS name but all its physical uplinks remain disconnected

Explanation

Correct Answer

C:

This demonstrates the centrally managed networking baseline applied in practice.

Incorrect Answers

A:

The deployment lacks the desired switch consistency.

B:

Uncontrolled host drift violates the managed network policy requirement.

D:

An inventory object is not an operational virtual switching fabric.

Question 137

Scenario: A cloud platform is deploying NSX overlay networking across ESX nodes and application traffic fails because transport encapsulation packets are blocked. Which implementation choice fits these constraints?

  1. Validate transport-node connectivity, tunnel endpoint addressing and appropriate MTU support
  2. Change only application DNS settings to fix overlay transport encapsulation
  3. Ignore physical fabric maximum transmission unit and assume encapsulation adds zero overhead
  4. Reduce VM memory reservations and expect the tunnel transport to recover

Explanation

Correct Answer

A:

Overlay packets need an intact physical underlay capable of forwarding encapsulation traffic.

Incorrect Answers

B:

DNS resolution does not provide missing TEP reachability or MTU support.

C:

Tunnel headers increase packet size and require validated end-to-end path handling.

D:

Guest resource sizing cannot fix hypervisor tunnel network failures.

Question 138

Scenario: A cloud platform is deploying NSX overlay networking across ESX nodes and application traffic fails because transport encapsulation packets are blocked. Which result should block sign-off until it is achieved?

  1. An NSX segment is visible but tunnel packets never reach the destination host
  2. Local VMs connect but cross-host packets fail at the TEP interface
  3. Cross-host overlay workloads communicate at the intended MTU with acceptable packet loss
  4. A TEP address is assigned while the physical switch drops larger encapsulated frames

Explanation

Correct Answer

C:

A real encapsulated path test confirms the fabric can carry overlay data.

Incorrect Answers

A:

A logical network definition cannot replace data-plane connectivity.

B:

Same-host communication does not validate overlay underlay reachability.

D:

Address configuration alone does not establish usable tunnel transport.

Question 139

Scenario: A network team is designing a virtual fabric where storage and vMotion traffic must not consume an unreserved management link. Which administrative action best meets the stated requirement?

  1. Run all large data copies over the only management NIC without monitoring
  2. Add more guest vNICs without providing host uplink capacity for infrastructure services
  3. Create and validate appropriate vmkernel services, traffic separation and physical uplink capacity
  4. Rely on DNS priority to allocate physical bandwidth between vmkernel services

Explanation

Correct Answer

C:

Traffic isolation and capacity planning protect management responsiveness during bursts.

Incorrect Answers

A:

Unbounded shared load can starve essential host management traffic.

B:

Guest virtual adapters cannot create new physical transport headroom.

D:

Name resolution does not enforce host switching bandwidth or traffic separation.

Question 140

Scenario: A network team is designing a virtual fabric where storage and vMotion traffic must not consume an unreserved management link. Which observation would demonstrate that the requirement is satisfied?

  1. A concurrent migration test completes while management latency remains within target
  2. Storage throughput is high only when management packets are dropped
  3. Host management becomes unreachable whenever a large storage transfer starts
  4. Network adapter inventory lists redundant cards but traffic still shares one saturated uplink

Explanation

Correct Answer

A:

It demonstrates intended traffic isolation under load rather than merely configuration presence.

Incorrect Answers

B:

Performance gained by starving control traffic is not acceptable.

C:

The virtual fabric has failed the congestion isolation requirement.

D:

Installed hardware does not prove correct service mapping and capacity.