McAfee-Secured Website

Exam Bundle

Exam Code: OGEA-103

Exam Name TOGAF Enterprise Architecture Combined Part 1 and Part 2

Certification Provider: The Open Group

Corresponding Certification: TOGAF Enterprise Architecture Practitioner

The Open Group OGEA-103 Bundle $19.99

100% The Open Group OGEA-103 Guaranteed Success With Testking Training Materials

Get Real OGEA-103 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    OGEA-103 Questions & Answers

    183 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual OGEA-103 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • Study Guide

    OGEA-103 Study Guide

    488 PDF Pages

    Developed by industry experts, this 488-page guide spells out in painstaking detail all of the information you need to ace OGEA-103 exam.

TOGAF Enterprise Architecture Combined Part 1 and Part 2 (OGEA-103) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $154.98
Bundle Price: $134.99

Purchase Individually

  • Questions & Answers

    Questions & Answers

    183 Questions

    $124.99
  • Study Guide

    Study Guide

    488 PDF Pages

    $29.99

The Open Group OGEA-103 Practice Test 49

Question 480

A program sponsor asks to proceed on requirements capture although the proposed solution is Record requirements and sources in continuous ADM Requirements Management. The architecture review cannot confirm: Each requirement has an owner, priority, rationale and affected architecture elements. Which action best restores defensible approval?

  1. Suspend conflicting design changes until the current requirement baseline is confirmed.
  2. Trigger an appropriate architecture update with risk and governance controls.
  3. Escalate missing sponsorship rather than commence unbounded detailed design.
  4. Reconcile contradictions before locking a technology solution.

Explanation

Correct Answer

D:

Reconcile contradictions before locking a technology solution. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

A:

That response concerns requirements baseline and would be useful for a different gap. Here, the corrective step is to reconcile contradictions before locking a technology solution.

B:

That response concerns phase h change triggers and would be useful for a different gap. Here, the corrective step is to reconcile contradictions before locking a technology solution.

C:

That response concerns phase a sponsorship and would be useful for a different gap. Here, the corrective step is to reconcile contradictions before locking a technology solution.

Question 481

An ADM change review examines requirements prioritization. The previously approved approach is Prioritize requirements with stakeholders using value, risks and constraints. However no evidence shows: The requirements log records agreed priority and rationale for deferrals. What should be done to resolve the remaining architectural exposure?

  1. Resolve sequencing conflicts before handing the roadmap to detailed migration planning.
  2. Escalate unresolved critical requirements before committing a limited roadmap.
  3. Reprioritize packages when expected value is not supported by evidence.
  4. Re-engage affected operations before treating the vision as agreed.

Explanation

Correct Answer

B:

Escalate unresolved critical requirements before committing a limited roadmap. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

A:

That response concerns phase e roadmap consolidation and would be useful for a different gap. Here, the corrective step is to escalate unresolved critical requirements before committing a limited roadmap.

C:

That response concerns phase f business value and would be useful for a different gap. Here, the corrective step is to escalate unresolved critical requirements before committing a limited roadmap.

D:

That response concerns phase a stakeholders and would be useful for a different gap. Here, the corrective step is to escalate unresolved critical requirements before committing a limited roadmap.

Question 482

An ADM change review examines phase b roadmap. The previously approved approach is Identify candidate Business Architecture roadmap components in Phase B. However no evidence shows: Change candidates link business capability gaps to implementation planning. What should be done to resolve the remaining architectural exposure?

  1. Include organizational change work rather than marking the business gap as an IT-only task.
  2. Redesign broken handoffs rather than only automate one department's tasks.
  3. Invoke contract governance instead of approving a unilateral substitution.
  4. Rework platform topology when mandatory controls are omitted.

Explanation

Correct Answer

A:

Include organizational change work rather than marking the business gap as an IT-only task. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

B:

That response concerns phase b value streams and would be useful for a different gap. Here, the corrective step is to include organizational change work rather than marking the business gap as an IT-only task.

C:

That response concerns phase g contract and would be useful for a different gap. Here, the corrective step is to include organizational change work rather than marking the business gap as an IT-only task.

D:

That response concerns phase d security infrastructure and would be useful for a different gap. Here, the corrective step is to include organizational change work rather than marking the business gap as an IT-only task.

Question 483

A program applied the intended measure for phase e roadmap consolidation: Consolidate candidate roadmap components into an integrated Architecture Roadmap in Phase E. The following expected result cannot be demonstrated: A coherent roadmap accounts for cross-domain dependencies and target milestones. Which corrective response should the architecture authority prioritize before approving the next transition?

  1. Trigger an appropriate architecture update with risk and governance controls.
  2. Revisit affected earlier phases when a late security constraint changes the operating model.
  3. Add an enabling business work package before claiming the target can operate.
  4. Resolve sequencing conflicts before handing the roadmap to detailed migration planning.

Explanation

Correct Answer

D:

Resolve sequencing conflicts before handing the roadmap to detailed migration planning. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

A:

That response concerns phase h change triggers and would be useful for a different gap. Here, the corrective step is to resolve sequencing conflicts before handing the roadmap to detailed migration planning.

B:

That response concerns adm security integration and would be useful for a different gap. Here, the corrective step is to resolve sequencing conflicts before handing the roadmap to detailed migration planning.

C:

That response concerns phase b gaps and would be useful for a different gap. Here, the corrective step is to resolve sequencing conflicts before handing the roadmap to detailed migration planning.

Question 484

An enterprise architecture review of phase h governance continuity finds a material verification gap despite the documented action: Operate an ongoing architecture change governance process in Phase H. The expected proof is absent: Change requests receive impact analysis, triage, approval and traceable outcomes. What is the best next governance response?

  1. Restore change governance before projects bypass the architecture baseline.
  2. Resolve sequencing conflicts before handing the roadmap to detailed migration planning.
  3. Escalate missing sponsorship rather than commence unbounded detailed design.
  4. Reconsider deployment strategy when readiness or interoperability evidence contradicts assumptions.

Explanation

Correct Answer

A:

Restore change governance before projects bypass the architecture baseline. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

B:

That response concerns phase e roadmap consolidation and would be useful for a different gap. Here, the corrective step is to restore change governance before projects bypass the architecture baseline.

C:

That response concerns phase a sponsorship and would be useful for a different gap. Here, the corrective step is to restore change governance before projects bypass the architecture baseline.

D:

That response concerns phase e implementation strategy and would be useful for a different gap. Here, the corrective step is to restore change governance before projects bypass the architecture baseline.

Question 485

A program sponsor asks to proceed on adm simultaneous streams although the proposed solution is Coordinate concurrent ADM work through explicit interfaces and shared governance. The architecture review cannot confirm: Cross-project dependency records align requirements and architecture decisions. Which action best restores defensible approval?

  1. Flag unproven capacity assumptions as delivery risks before migration planning.
  2. Introduce an integration-enablement change before promising the mobile experience.
  3. Resolve shared data design disagreement before parallel deployments diverge.
  4. Reprioritize packages when expected value is not supported by evidence.

Explanation

Correct Answer

C:

Resolve shared data design disagreement before parallel deployments diverge. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

A:

That response concerns phase d capacity and would be useful for a different gap. Here, the corrective step is to resolve shared data design disagreement before parallel deployments diverge.

B:

That response concerns phase c application gaps and would be useful for a different gap. Here, the corrective step is to resolve shared data design disagreement before parallel deployments diverge.

D:

That response concerns phase f business value and would be useful for a different gap. Here, the corrective step is to resolve shared data design disagreement before parallel deployments diverge.

Question 486

An enterprise architecture review of phase g contract finds a material verification gap despite the documented action: Use Architecture Contracts and governance during Phase G. The expected proof is absent: Signed obligations and tracked deviations determine whether implementation meets architecture commitments. What is the best next governance response?

  1. Invoke contract governance instead of approving a unilateral substitution.
  2. Harmonize contracts before authorizing separate point-to-point solutions.
  3. Seek change approval or partition the work before uncontrolled expansion.
  4. Reopen prioritization when a risk changes the preferred sequence.

Explanation

Correct Answer

A:

Invoke contract governance instead of approving a unilateral substitution. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

B:

That response concerns phase c integration and would be useful for a different gap. Here, the corrective step is to invoke contract governance instead of approving a unilateral substitution.

C:

That response concerns phase a scope and would be useful for a different gap. Here, the corrective step is to invoke contract governance instead of approving a unilateral substitution.

D:

That response concerns phase f prioritization and would be useful for a different gap. Here, the corrective step is to invoke contract governance instead of approving a unilateral substitution.

Question 487

An enterprise architecture review of phase c data gap finds a material verification gap despite the documented action: Identify data architecture gaps and candidate roadmap changes. The expected proof is absent: Gap assessment captures integration timeliness, stewardship and required new data services. What is the best next governance response?

  1. Split or re-sequence packages when critical enabling changes are omitted.
  2. Bring unacceptable exposure to sponsors before architecture approval.
  3. Add a data-platform dependency to the roadmap when application plans assume immediate data access.
  4. Sequence the platform capability ahead of application cutover.

Explanation

Correct Answer

C:

Add a data-platform dependency to the roadmap when application plans assume immediate data access. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

A:

That response concerns phase e work packages and would be useful for a different gap. Here, the corrective step is to add a data-platform dependency to the roadmap when application plans assume immediate data access.

B:

That response concerns phase a risk and would be useful for a different gap. Here, the corrective step is to add a data-platform dependency to the roadmap when application plans assume immediate data access.

D:

That response concerns phase d technology gaps and would be useful for a different gap. Here, the corrective step is to add a data-platform dependency to the roadmap when application plans assume immediate data access.

Question 488

A program applied the intended measure for phase d target platforms: Develop Target Technology Architecture that supports application and data requirements. The following expected result cannot be demonstrated: Platform architecture shows availability zones, connections, technology services and standards. Which corrective response should the architecture authority prioritize before approving the next transition?

  1. Reassess tailoring when risk or scope grows beyond the lightweight plan.
  2. Include organizational change work rather than marking the business gap as an IT-only task.
  3. Reassess target platform choices when resilience objectives cannot be met.
  4. Correct the method workflow so requirements inform every phase rather than wait until the end.

Explanation

Correct Answer

C:

Reassess target platform choices when resilience objectives cannot be met. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

A:

That response concerns adm iteration depth and would be useful for a different gap. Here, the corrective step is to reassess target platform choices when resilience objectives cannot be met.

B:

That response concerns phase b roadmap and would be useful for a different gap. Here, the corrective step is to reassess target platform choices when resilience objectives cannot be met.

D:

That response concerns adm phase relationships and would be useful for a different gap. Here, the corrective step is to reassess target platform choices when resilience objectives cannot be met.

Question 489

A program applied the intended measure for phase a stakeholders: Identify stakeholders, concerns and communication needs during Phase A. The following expected result cannot be demonstrated: Stakeholder map and review feedback demonstrate operational concerns were represented. Which corrective response should the architecture authority prioritize before approving the next transition?

  1. Harmonize contracts before authorizing separate point-to-point solutions.
  2. Re-engage affected operations before treating the vision as agreed.
  3. Fill data ownership gaps before planning the target data architecture.
  4. Restore change governance before projects bypass the architecture baseline.

Explanation

Correct Answer

B:

Re-engage affected operations before treating the vision as agreed. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

A:

That response concerns phase c integration and would be useful for a different gap. Here, the corrective step is to re-engage affected operations before treating the vision as agreed.

C:

That response concerns phase c data baseline and would be useful for a different gap. Here, the corrective step is to re-engage affected operations before treating the vision as agreed.

D:

That response concerns phase h governance continuity and would be useful for a different gap. Here, the corrective step is to re-engage affected operations before treating the vision as agreed.

Question 490

An enterprise architecture review of adm architecture levels finds a material verification gap despite the documented action: Apply ADM cycles at suitable architecture landscape levels and coordinate them. The expected proof is absent: Strategy, portfolio and solution work have appropriate scope and linked constraints. What is the best next governance response?

  1. Refine or separate the engagement when abstraction levels are being mixed.
  2. Rework platform topology when mandatory controls are omitted.
  3. Fill data ownership gaps before planning the target data architecture.
  4. Add a data-platform dependency to the roadmap when application plans assume immediate data access.

Explanation

Correct Answer

A:

Refine or separate the engagement when abstraction levels are being mixed. The required evidence was not demonstrated, so the corrected outcome must be verified before proceeding.

Incorrect Answers

B:

That response concerns phase d security infrastructure and would be useful for a different gap. Here, the corrective step is to refine or separate the engagement when abstraction levels are being mixed.

C:

That response concerns phase c data baseline and would be useful for a different gap. Here, the corrective step is to refine or separate the engagement when abstraction levels are being mixed.

D:

That response concerns phase c data gap and would be useful for a different gap. Here, the corrective step is to refine or separate the engagement when abstraction levels are being mixed.