McAfee-Secured Website

Exam Code: 1H0_25

Exam Name: Omnissa Certified Administrator Horizon

Certification Provider: Omnissa

100% Omnissa 1H0_25 Guaranteed Success With Testking Training Materials

Get Real 1H0_25 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

44 Questions & Answers with Testing Engine

"Omnissa Certified Administrator Horizon Exam", also known as 1H0_25 exam, is a Omnissa certification exam.

Pass your tests with the always up-to-date 1H0_25 Exam Engine. Your 1H0_25 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Omnissa 1H0_25 Practice Test 73

Question 720

After resolving this Horizon operational issue: A finance application crashes only when an App Volumes package is assigned alongside a second package containing the same DLL. Which ongoing practice would best prevent its recurrence?

  1. Maintain package conflict and dependency inventories before enabling multiple concurrent attachments.
  2. Monitor agent connectivity and package repository reachability independently of user entitlement.
  3. Validate package assignments and user session state when promoting application updates.
  4. Validate farm session placement against actual host capacity and peak concurrency.

Explanation

Correct Answer

A:

Maintain package conflict and dependency inventories before enabling multiple concurrent attachments. This recurring safeguard addresses the specific fault: Overlapping package components create a runtime dependency conflict in the delivered application stack. The original corrective action is: Compare package contents and assign compatible nonconflicting versions through a staged change.

Incorrect Answers

B:

This control protects against a condition in which the desktop's App Volumes Agent cannot reach the required management or package storage endpoint. The issue to prevent here is: Overlapping package components create a runtime dependency conflict in the delivered application stack. Maintain package conflict and dependency inventories before enabling multiple concurrent attachments.

C:

Overlapping package components create a runtime dependency conflict in the delivered application stack. The proposed safeguard is intended for another failure mechanism: Active assignments still point to the old version or existing sessions retain the earlier attachment. Maintain package conflict and dependency inventories before enabling multiple concurrent attachments.

D:

The farm's load balancing or capacity weighting does not reflect current host health and active sessions. The option addresses that risk, not the one responsible for the present issue. Overlapping package components create a runtime dependency conflict in the delivered application stack. Maintain package conflict and dependency inventories before enabling multiple concurrent attachments.

Question 721

A newly packaged application works on the capture machine but reports missing dependencies on fresh instant clones. Which Horizon administration action is the most appropriate response?

  1. Measure first-launch I/O and delivery path and use a tested supported staging or site topology improvement.
  2. Identify the runtime dependency and put it in the supported base image or a compatible application layer.
  3. Compare package contents and assign compatible nonconflicting versions through a staged change.
  4. Adopt a staged maintenance sequence that excludes the host from new placement and respects active users.

Explanation

Correct Answer

B:

Identify the runtime dependency and put it in the supported base image or a compatible application layer. The relevant Horizon technical mechanism is: The application capture assumed a runtime installed only on the packaging workstation. A specific acceptance check is: A clean-image test clone launches the package without missing-library errors.

Incorrect Answers

A:

This action is useful for the following failure: First-launch delivery must transfer application components over a constrained storage or network route. Here, the application capture assumed a runtime installed only on the packaging workstation. Identify the runtime dependency and put it in the supported base image or a compatible application layer.

C:

Overlapping package components create a runtime dependency conflict in the delivered application stack. The proposal would address that limitation, but the problem here is different: The application capture assumed a runtime installed only on the packaging workstation. Identify the runtime dependency and put it in the supported base image or a compatible application layer.

D:

The option targets this technical issue: The maintenance automation restarts hosts before draining or otherwise protecting active sessions. The reported fault remains: The application capture assumed a runtime installed only on the packaging workstation. Identify the runtime dependency and put it in the supported base image or a compatible application layer.

Question 722

An Omnissa Horizon administrator verifies the resolution of this desktop infrastructure incident: A newly packaged application works on the capture machine but reports missing dependencies on fresh instant clones. Which evidence best confirms the intended correction?

  1. A Linux user launches the approved application through a supported delivery route without a failed Windows layer.
  2. A test user logs off without file loss and the volume detaches cleanly afterward.
  3. A clean-image test clone launches the package without missing-library errors.
  4. The published app opens an approved file from the intended user storage location.

Explanation

Correct Answer

C:

A clean-image test clone launches the package without missing-library errors. This evidence validates the corrective action: Identify the runtime dependency and put it in the supported base image or a compatible application layer. The original fault mechanism was: The application capture assumed a runtime installed only on the packaging workstation.

Incorrect Answers

A:

The application capture assumed a runtime installed only on the packaging workstation. The selected observation would assess a different failure: The selected App Volumes package delivery mechanism targets a different supported guest platform. Evidence for the current fix is: A clean-image test clone launches the package without missing-library errors.

B:

The volume is still actively mounted and holds user data whose session operations have not completed. That explains the usefulness of the selected check, but the outcome required here is different. The application capture assumed a runtime installed only on the packaging workstation. A clean-image test clone launches the package without missing-library errors.

D:

The application capture assumed a runtime installed only on the packaging workstation. The proposed check does not demonstrate that this failure was corrected; it is intended for a condition in which the RDS session environment or file-redirection dependency differs from the working desktop environment. A clean-image test clone launches the package without missing-library errors.

Question 723

The Horizon support team investigates this end-user computing issue: A newly packaged application works on the capture machine but reports missing dependencies on fresh instant clones. Which explanation most accurately identifies the underlying cause?

  1. The volume is still actively mounted and holds user data whose session operations have not completed.
  2. First-launch delivery must transfer application components over a constrained storage or network route.
  3. RDS host licensing or server role prerequisites were not validated for the new farm image.
  4. The application capture assumed a runtime installed only on the packaging workstation.

Explanation

Correct Answer

D:

The application capture assumed a runtime installed only on the packaging workstation. This cause matches the reported symptom rather than a different Horizon issue. The appropriate corrective step is: Identify the runtime dependency and put it in the supported base image or a compatible application layer. Confirming evidence is: A clean-image test clone launches the package without missing-library errors.

Incorrect Answers

A:

The volume is still actively mounted and holds user data whose session operations have not completed. That mechanism does not account for the reported symptom. The application capture assumed a runtime installed only on the packaging workstation. Identify the runtime dependency and put it in the supported base image or a compatible application layer.

B:

The issue described by this choice is: First-launch delivery must transfer application components over a constrained storage or network route. For the reported behavior, the relevant cause is: The application capture assumed a runtime installed only on the packaging workstation. Identify the runtime dependency and put it in the supported base image or a compatible application layer.

C:

The application capture assumed a runtime installed only on the packaging workstation. The alternative explanation would fit a different condition, where RDS host licensing or server role prerequisites were not validated for the new farm image. Identify the runtime dependency and put it in the supported base image or a compatible application layer.

Question 724

After resolving this Horizon operational issue: A newly packaged application works on the capture machine but reports missing dependencies on fresh instant clones. Which ongoing practice would best prevent its recurrence?

  1. Validate package assignments and user session state when promoting application updates.
  2. Test App Volumes packages against genuinely clean target images before release.
  3. Include restart and installer completion in App Volumes packaging quality gates.
  4. Separate DEM support visibility from unrestricted profile data administration.

Explanation

Correct Answer

B:

Test App Volumes packages against genuinely clean target images before release. This recurring safeguard addresses the specific fault: The application capture assumed a runtime installed only on the packaging workstation. The original corrective action is: Identify the runtime dependency and put it in the supported base image or a compatible application layer.

Incorrect Answers

A:

The prevention measure is relevant to this condition: Active assignments still point to the old version or existing sessions retain the earlier attachment. Here the recurring weakness is: The application capture assumed a runtime installed only on the packaging workstation. Test App Volumes packages against genuinely clean target images before release.

C:

The package was finalized before installation and restart-sensitive registration steps completed. The selected safeguard helps with that exposure, but it leaves the recurrence risk here unaddressed. The application capture assumed a runtime installed only on the packaging workstation. Test App Volumes packages against genuinely clean target images before release.

D:

This control protects against a condition in which support operators have insufficient delegated diagnostic access, not a failure of personalization itself. The issue to prevent here is: The application capture assumed a runtime installed only on the packaging workstation. Test App Volumes packages against genuinely clean target images before release.

Question 725

Users receive an old application release although the administrator has promoted a new package version in App Volumes Manager. Which Horizon administration action is the most appropriate response?

  1. Identify the runtime dependency and put it in the supported base image or a compatible application layer.
  2. Compare package contents and assign compatible nonconflicting versions through a staged change.
  3. Assign a narrowly scoped authorized troubleshooting role and collect the relevant per-user DEM diagnostic bundle.
  4. Inspect package version state and effective assignments and apply an approved version migration or reconnect.

Explanation

Correct Answer

D:

Inspect package version state and effective assignments and apply an approved version migration or reconnect. The relevant Horizon technical mechanism is: Active assignments still point to the old version or existing sessions retain the earlier attachment. A specific acceptance check is: A clean new session loads the intended version while the rollback package stays available.

Incorrect Answers

A:

Active assignments still point to the old version or existing sessions retain the earlier attachment. The proposal is better suited to this other condition: The application capture assumed a runtime installed only on the packaging workstation. Inspect package version state and effective assignments and apply an approved version migration or reconnect.

B:

Overlapping package components create a runtime dependency conflict in the delivered application stack. That is the condition this measure can address. In the reported situation, active assignments still point to the old version or existing sessions retain the earlier attachment. Inspect package version state and effective assignments and apply an approved version migration or reconnect.

C:

This action is useful for the following failure: Support operators have insufficient delegated diagnostic access, not a failure of personalization itself. Here, active assignments still point to the old version or existing sessions retain the earlier attachment. Inspect package version state and effective assignments and apply an approved version migration or reconnect.

Question 726

An Omnissa Horizon administrator verifies the resolution of this desktop infrastructure incident: Users receive an old application release although the administrator has promoted a new package version in App Volumes Manager. Which evidence best confirms the intended correction?

  1. A Linux user launches the approved application through a supported delivery route without a failed Windows layer.
  2. A clean new session loads the intended version while the rollback package stays available.
  3. A new package attaches fully and the application starts with all required services registered.
  4. A fresh session evaluates the current policy and the obsolete setting no longer appears.

Explanation

Correct Answer

B:

A clean new session loads the intended version while the rollback package stays available. This evidence validates the corrective action: Inspect package version state and effective assignments and apply an approved version migration or reconnect. The original fault mechanism was: Active assignments still point to the old version or existing sessions retain the earlier attachment.

Incorrect Answers

A:

The selected App Volumes package delivery mechanism targets a different supported guest platform. The proposed result could verify work on that issue, but it would not establish success here. Active assignments still point to the old version or existing sessions retain the earlier attachment. A clean new session loads the intended version while the rollback package stays available.

C:

Active assignments still point to the old version or existing sessions retain the earlier attachment. The selected observation would assess a different failure: The package was finalized before installation and restart-sensitive registration steps completed. Evidence for the current fix is: A clean new session loads the intended version while the rollback package stays available.

D:

The active session has not reprocessed the updated settings configuration at the required trigger. That explains the usefulness of the selected check, but the outcome required here is different. Active assignments still point to the old version or existing sessions retain the earlier attachment. A clean new session loads the intended version while the rollback package stays available.

Question 727

The Horizon support team investigates this end-user computing issue: Users receive an old application release although the administrator has promoted a new package version in App Volumes Manager. Which explanation most accurately identifies the underlying cause?

  1. The desktop's App Volumes Agent cannot reach the required management or package storage endpoint.
  2. The application capture assumed a runtime installed only on the packaging workstation.
  3. Active assignments still point to the old version or existing sessions retain the earlier attachment.
  4. RDS host licensing or server role prerequisites were not validated for the new farm image.

Explanation

Correct Answer

C:

Active assignments still point to the old version or existing sessions retain the earlier attachment. This cause matches the reported symptom rather than a different Horizon issue. The appropriate corrective step is: Inspect package version state and effective assignments and apply an approved version migration or reconnect. Confirming evidence is: A clean new session loads the intended version while the rollback package stays available.

Incorrect Answers

A:

The suggested cause relates to this separate failure: The desktop's App Volumes Agent cannot reach the required management or package storage endpoint. The facts in the question instead point to: Active assignments still point to the old version or existing sessions retain the earlier attachment. Inspect package version state and effective assignments and apply an approved version migration or reconnect.

B:

Active assignments still point to the old version or existing sessions retain the earlier attachment. The selected diagnosis describes a different mechanism: The application capture assumed a runtime installed only on the packaging workstation. Inspect package version state and effective assignments and apply an approved version migration or reconnect.

D:

The issue described by this choice is: RDS host licensing or server role prerequisites were not validated for the new farm image. For the reported behavior, the relevant cause is: Active assignments still point to the old version or existing sessions retain the earlier attachment. Inspect package version state and effective assignments and apply an approved version migration or reconnect.

Question 728

After resolving this Horizon operational issue: Users receive an old application release although the administrator has promoted a new package version in App Volumes Manager. Which ongoing practice would best prevent its recurrence?

  1. Validate package assignments and user session state when promoting application updates.
  2. Monitor agent connectivity and package repository reachability independently of user entitlement.
  3. Reconcile application assignments with effective directory entitlements during access changes.
  4. Revalidate RDS application entitlements after identity group restructuring.

Explanation

Correct Answer

A:

Validate package assignments and user session state when promoting application updates. This recurring safeguard addresses the specific fault: Active assignments still point to the old version or existing sessions retain the earlier attachment. The original corrective action is: Inspect package version state and effective assignments and apply an approved version migration or reconnect.

Incorrect Answers

B:

The desktop's App Volumes Agent cannot reach the required management or package storage endpoint. The option addresses that risk, not the one responsible for the present issue. Active assignments still point to the old version or existing sessions retain the earlier attachment. Validate package assignments and user session state when promoting application updates.

C:

The prevention measure is relevant to this condition: The configured application package assignment does not match the user's current effective directory group. Here the recurring weakness is: Active assignments still point to the old version or existing sessions retain the earlier attachment. Validate package assignments and user session state when promoting application updates.

D:

Active assignments still point to the old version or existing sessions retain the earlier attachment. Using the proposed safeguard would guard against a separate risk: The published application entitlement references a group no longer resolved to the intended users. Validate package assignments and user session state when promoting application updates.

Question 729

An on-demand application launches slowly only for a remote site that has high latency to the package repository. Which Horizon administration action is the most appropriate response?

  1. Verify supported identity and authorization for the package path and correct the minimal rights.
  2. Collect agent and manager logs and restore the specific missing authenticated network or storage path.
  3. Measure first-launch I/O and delivery path and use a tested supported staging or site topology improvement.
  4. Inspect per-host session counts and resources and correct the supported load distribution policy.

Explanation

Correct Answer

C:

Measure first-launch I/O and delivery path and use a tested supported staging or site topology improvement. The relevant Horizon technical mechanism is: First-launch delivery must transfer application components over a constrained storage or network route. A specific acceptance check is: A remote-site pilot launches the app within target time without replacing the entire desktop pool.

Incorrect Answers

A:

A service account or storage permission prevents the manager or agent from reading the required package. The proposal would address that limitation, but the problem here is different: First-launch delivery must transfer application components over a constrained storage or network route. Measure first-launch I/O and delivery path and use a tested supported staging or site topology improvement.

B:

The option targets this technical issue: The desktop's App Volumes Agent cannot reach the required management or package storage endpoint. The reported fault remains: First-launch delivery must transfer application components over a constrained storage or network route. Measure first-launch I/O and delivery path and use a tested supported staging or site topology improvement.

D:

The farm's load balancing or capacity weighting does not reflect current host health and active sessions. That is the condition this measure can address. In the reported situation, first-launch delivery must transfer application components over a constrained storage or network route. Measure first-launch I/O and delivery path and use a tested supported staging or site topology improvement.

Question 730

An Omnissa Horizon administrator verifies the resolution of this desktop infrastructure incident: An on-demand application launches slowly only for a remote site that has high latency to the package repository. Which evidence best confirms the intended correction?

  1. The target desktop attaches the package successfully and logs a completed attachment event.
  2. The test user sees the application after a new session while an unentitled user does not.
  3. A remote-site pilot launches the app within target time without replacing the entire desktop pool.
  4. New sessions are placed only on eligible hosts and the maintenance host receives none.

Explanation

Correct Answer

C:

A remote-site pilot launches the app within target time without replacing the entire desktop pool. This evidence validates the corrective action: Measure first-launch I/O and delivery path and use a tested supported staging or site topology improvement. The original fault mechanism was: First-launch delivery must transfer application components over a constrained storage or network route.

Incorrect Answers

A:

The result shown is suited to this other condition: The desktop's App Volumes Agent cannot reach the required management or package storage endpoint. The reported fix should instead produce the following evidence: A remote-site pilot launches the app within target time without replacing the entire desktop pool.

B:

First-launch delivery must transfer application components over a constrained storage or network route. The proposed check does not demonstrate that this failure was corrected; it is intended for a condition in which the configured application package assignment does not match the user's current effective directory group. A remote-site pilot launches the app within target time without replacing the entire desktop pool.

D:

This measurement is relevant when the administrator has confused draining and active-host states when evaluating farm capacity. It cannot verify that the reported problem is fixed. A remote-site pilot launches the app within target time without replacing the entire desktop pool.

Omnissa Certified Administrator Horizon (1H0_25) Practice Tests