McAfee-Secured Website

Exam Code: 4A0-D01

Exam Name: Nokia Data Center Fabric Fundamentals

Certification Provider: Nokia

100% Nokia 4A0-D01 Guaranteed Success With Testking Training Materials

Get Real 4A0-D01 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

61 Questions & Answers with Testing Engine

"Nokia Data Center Fabric Fundamentals Exam", also known as 4A0-D01 exam, is a Nokia certification exam.

Pass your tests with the always up-to-date 4A0-D01 Exam Engine. Your 4A0-D01 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Nokia 4A0-D01 Practice Test 80

Question 790

At Windmere Health Systems, while reviewing fabric automation recovery, the data center fabric team observes: A fabric automation rollback is planned without a documented approved state to restore. Which result would establish that the original defect has been corrected?

  1. The provisioned environment contains the approved fabric topology and verified network links
  2. The known fault produces the expected observed state and alarm without false green status
  3. The intended service is realized on devices and a controlled workload flow succeeds
  4. A failed test change can be traced and restored to the accepted intended state

Explanation

Correct Answer

D:

At Windmere Health Systems, while reviewing fabric automation recovery, a failed test change can be traced and restored to the accepted intended state. This is linked directly to the observed symptom (A fabric automation rollback is planned without a documented approved state to restore) and cannot be replaced by an unrelated healthy dashboard.

Incorrect Answers

A:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: The provisioned environment contains the approved fabric topology and verified network links. Although related to Event-Driven Automation and intent operations, the proposed change fits another mechanism: The orchestrator platform is confused with the intended fabric and service intent definitions. The evidence in the current case requires a different result: A failed test change can be traced and restored to the accepted intended state.

B:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: The known fault produces the expected observed state and alarm without false green status. Using that approach would investigate An EDA observability panel has no alerts during a test network failure instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The EDA change plan lacks transaction traceability and pre-change intent baselines.

C:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: The intended service is realized on devices and a controlled workload flow succeeds. The alternative focuses on An accepted automation transaction was confused with actual service operational success, not on the stated defect. For this scenario the expected acceptance result would be: A failed test change can be traced and restored to the accepted intended state.

Question 791

At Windmere Health Systems, while reviewing fabric automation recovery, the data center fabric team observes: A fabric automation rollback is planned without a documented approved state to restore. Which root cause fits the reported state?

  1. The EDA change plan lacks transaction traceability and pre-change intent baselines
  2. The orchestrator platform is confused with the intended fabric and service intent definitions
  3. Manual changes were made without accounting for intent ownership and reconciliation
  4. The team uses the absence of alarms as the sole evidence of monitoring completeness

Explanation

Correct Answer

A:

At Windmere Health Systems, while reviewing fabric automation recovery, for Windmere Health Systems, investigate this cause first: The EDA change plan lacks transaction traceability and pre-change intent baselines. It is directly linked to the observed symptom rather than another service issue.

Incorrect Answers

B:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: The orchestrator platform is confused with the intended fabric and service intent definitions. The alternative focuses on The orchestrator platform is confused with the intended fabric and service intent definitions, not on the stated defect. For this scenario the expected acceptance result would be: A failed test change can be traced and restored to the accepted intended state.

C:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: Manual changes were made without accounting for intent ownership and reconciliation. This option assumes the other problem (An operator pushes individual switch settings that later drift from centrally managed EDA intent) is present. The case instead describes A fabric automation rollback is planned without a documented approved state to restore, for which the causal issue is The EDA change plan lacks transaction traceability and pre-change intent baselines.

D:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: The team uses the absence of alarms as the sole evidence of monitoring completeness. It tests a different symptom: An EDA observability panel has no alerts during a test network failure. For the observed case, the relevant distinction is The EDA change plan lacks transaction traceability and pre-change intent baselines, with verification: A failed test change can be traced and restored to the accepted intended state.

Question 792

At Windmere Health Systems, while reviewing fabric automation recovery, the data center fabric team observes: A fabric automation rollback is planned without a documented approved state to restore. Which recurring validation best prevents this failure mode?

  1. Include controlled monitoring fixtures in intent-platform acceptance
  2. Use device onboarding and intent-compliance gates separately
  3. Use defined change ownership for intent-managed devices
  4. Make audited rollback readiness part of automated network change reviews

Explanation

Correct Answer

D:

At Windmere Health Systems, while reviewing fabric automation recovery, use this repeatable control: Make audited rollback readiness part of automated network change reviews. Its scope is the problem (The EDA change plan lacks transaction traceability and pre-change intent baselines), not an unrelated network maintenance procedure.

Incorrect Answers

A:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: Include controlled monitoring fixtures in intent-platform acceptance. The alternative focuses on The team uses the absence of alarms as the sole evidence of monitoring completeness, not on the stated defect. For this scenario the expected acceptance result would be: A failed test change can be traced and restored to the accepted intended state.

B:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: Use device onboarding and intent-compliance gates separately. This option assumes the other problem (A newly onboarded device is visible in EDA but lacks its intended fabric configuration) is present. The case instead describes A fabric automation rollback is planned without a documented approved state to restore, for which the causal issue is The EDA change plan lacks transaction traceability and pre-change intent baselines.

C:

At Windmere Health Systems, while reviewing fabric automation recovery, this option proposes: Use defined change ownership for intent-managed devices. It tests a different symptom: An operator pushes individual switch settings that later drift from centrally managed EDA intent. For the observed case, the relevant distinction is The EDA change plan lacks transaction traceability and pre-change intent baselines, with verification: A failed test change can be traced and restored to the accepted intended state.

Question 793

At Westbrook Energy Services, while onboarding a device through EDA, the data center fabric team observes: A fabric automation rollback is planned without a documented approved state to restore. Which targeted adjustment best corrects this behavior?

  1. Check EDA transaction results and end-to-end tenant service health after execution
  2. Apply the approved fabric intent workflow and verify resulting device configuration and state
  3. Capture approved intent and transaction state and rehearse supported recovery on a test fabric
  4. Model and validate the actual fabric intent and device onboarding requirements in EDA

Explanation

Correct Answer

C:

At Westbrook Energy Services, while onboarding a device through EDA, choose this remediation because it targets the mechanism: The EDA change plan lacks transaction traceability and pre-change intent baselines. The supported corrective action is: Capture approved intent and transaction state and rehearse supported recovery on a test fabric. Verification requires: A failed test change can be traced and restored to the accepted intended state.

Incorrect Answers

A:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: Check EDA transaction results and end-to-end tenant service health after execution. It tests a different symptom: A tenant service deployment is considered complete because EDA accepted the requested intent. For the observed case, the relevant distinction is The EDA change plan lacks transaction traceability and pre-change intent baselines, with verification: A failed test change can be traced and restored to the accepted intended state.

B:

Device discovery was mistaken for successful fabric intent realization, but here the case reports A fabric automation rollback is planned without a documented approved state to restore. Here, the EDA change plan lacks transaction traceability and pre-change intent baselines.

D:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: Model and validate the actual fabric intent and device onboarding requirements in EDA. This is a valid category of fabric maintenance for another scenario (An EDA planning team assumes Kubernetes deployment alone creates fabric connectivity), not the targeted action for Westbrook Energy Services. The distinction is the actual cause: The EDA change plan lacks transaction traceability and pre-change intent baselines.

Question 794

At Westbrook Energy Services, while onboarding a device through EDA, the data center fabric team observes: A fabric automation rollback is planned without a documented approved state to restore. What observation should be required before this case is closed?

  1. The known fault produces the expected observed state and alarm without false green status
  2. The intended setting persists through an EDA consistency check without undocumented deviations
  3. The provisioned environment contains the approved fabric topology and verified network links
  4. A failed test change can be traced and restored to the accepted intended state

Explanation

Correct Answer

D:

At Westbrook Energy Services, while onboarding a device through EDA, a failed test change can be traced and restored to the accepted intended state. This is linked directly to the observed symptom (A fabric automation rollback is planned without a documented approved state to restore) and cannot be replaced by an unrelated healthy dashboard.

Incorrect Answers

A:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: The known fault produces the expected observed state and alarm without false green status. The option describes a different failure mode: An EDA observability panel has no alerts during a test network failure. It would address The team uses the absence of alarms as the sole evidence of monitoring completeness, but here the case reports A fabric automation rollback is planned without a documented approved state to restore. The current required evidence is: A failed test change can be traced and restored to the accepted intended state.

B:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: The intended setting persists through an EDA consistency check without undocumented deviations. That choice would be more relevant when this different symptom occurs: An operator pushes individual switch settings that later drift from centrally managed EDA intent. The present scenario instead points to: The EDA change plan lacks transaction traceability and pre-change intent baselines. The correct resolution has its own verification outcome: A failed test change can be traced and restored to the accepted intended state.

C:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: The provisioned environment contains the approved fabric topology and verified network links. This is a valid category of fabric maintenance for another scenario (An EDA planning team assumes Kubernetes deployment alone creates fabric connectivity), not the targeted action for Westbrook Energy Services. The distinction is the actual cause: The EDA change plan lacks transaction traceability and pre-change intent baselines.

Question 795

At Westbrook Energy Services, while onboarding a device through EDA, the data center fabric team observes: A fabric automation rollback is planned without a documented approved state to restore. What causal finding should the investigation prioritize?

  1. The EDA change plan lacks transaction traceability and pre-change intent baselines
  2. An accepted automation transaction was confused with actual service operational success
  3. The orchestrator platform is confused with the intended fabric and service intent definitions
  4. Device discovery was mistaken for successful fabric intent realization

Explanation

Correct Answer

A:

At Westbrook Energy Services, while onboarding a device through EDA, for Westbrook Energy Services, investigate this cause first: The EDA change plan lacks transaction traceability and pre-change intent baselines. It is directly linked to the observed symptom rather than another service issue.

Incorrect Answers

B:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: An accepted automation transaction was confused with actual service operational success. This is a valid category of fabric maintenance for another scenario (A tenant service deployment is considered complete because EDA accepted the requested intent), not the targeted action for Westbrook Energy Services. The distinction is the actual cause: The EDA change plan lacks transaction traceability and pre-change intent baselines.

C:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: The orchestrator platform is confused with the intended fabric and service intent definitions. Although related to Event-Driven Automation and intent operations, the proposed change fits another mechanism: The orchestrator platform is confused with the intended fabric and service intent definitions. The evidence in the current case requires a different result: A failed test change can be traced and restored to the accepted intended state.

D:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: Device discovery was mistaken for successful fabric intent realization. Using that approach would investigate A newly onboarded device is visible in EDA but lacks its intended fabric configuration instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The EDA change plan lacks transaction traceability and pre-change intent baselines.

Question 796

At Westbrook Energy Services, while onboarding a device through EDA, the data center fabric team observes: A fabric automation rollback is planned without a documented approved state to restore. What ongoing operational safeguard directly addresses this root issue?

  1. Make audited rollback readiness part of automated network change reviews
  2. Use device onboarding and intent-compliance gates separately
  3. Use defined change ownership for intent-managed devices
  4. Require transaction and live-network acceptance for service intent changes

Explanation

Correct Answer

A:

At Westbrook Energy Services, while onboarding a device through EDA, the preventive control is: Make audited rollback readiness part of automated network change reviews. It catches the same mechanism (The EDA change plan lacks transaction traceability and pre-change intent baselines) before the symptom recurs. An appropriate regression observation is: A failed test change can be traced and restored to the accepted intended state.

Incorrect Answers

B:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: Use device onboarding and intent-compliance gates separately. Although related to Event-Driven Automation and intent operations, the proposed change fits another mechanism: Device discovery was mistaken for successful fabric intent realization. The evidence in the current case requires a different result: A failed test change can be traced and restored to the accepted intended state.

C:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: Use defined change ownership for intent-managed devices. Using that approach would investigate An operator pushes individual switch settings that later drift from centrally managed EDA intent instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The EDA change plan lacks transaction traceability and pre-change intent baselines.

D:

At Westbrook Energy Services, while onboarding a device through EDA, this option proposes: Require transaction and live-network acceptance for service intent changes. The alternative focuses on An accepted automation transaction was confused with actual service operational success, not on the stated defect. For this scenario the expected acceptance result would be: A failed test change can be traced and restored to the accepted intended state.

Question 797

At Riverton Energy Services, while auditing EDA transactions, the data center fabric team observes: A newly onboarded device is visible in EDA but lacks its intended fabric configuration. Which supported remediation most directly addresses the stated failure?

  1. Validate configured telemetry collection and EDA observability against a controlled fault
  2. Apply the approved fabric intent workflow and verify resulting device configuration and state
  3. Reconcile the needed change through the authorized EDA fabric or service intent workflow
  4. Capture approved intent and transaction state and rehearse supported recovery on a test fabric

Explanation

Correct Answer

B:

At Riverton Energy Services, while auditing EDA transactions, for Riverton Energy Services, the applicable change is: Apply the approved fabric intent workflow and verify resulting device configuration and state. The causal issue is: Device discovery was mistaken for successful fabric intent realization. A successful validation would show: The device shows expected routed fabric links and EDA intended state after reconciliation.

Incorrect Answers

A:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: Validate configured telemetry collection and EDA observability against a controlled fault. Using that approach would investigate An EDA observability panel has no alerts during a test network failure instead. No evidence for that separate failure is supplied here; the reported case is consistent with: Device discovery was mistaken for successful fabric intent realization.

C:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: Reconcile the needed change through the authorized EDA fabric or service intent workflow. This option assumes the other problem (An operator pushes individual switch settings that later drift from centrally managed EDA intent) is present. The case instead describes A newly onboarded device is visible in EDA but lacks its intended fabric configuration, for which the causal issue is Device discovery was mistaken for successful fabric intent realization.

D:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: Capture approved intent and transaction state and rehearse supported recovery on a test fabric. It tests a different symptom: A fabric automation rollback is planned without a documented approved state to restore. For the observed case, the relevant distinction is Device discovery was mistaken for successful fabric intent realization, with verification: The device shows expected routed fabric links and EDA intended state after reconciliation.

Question 798

At Riverton Energy Services, while auditing EDA transactions, the data center fabric team observes: A newly onboarded device is visible in EDA but lacks its intended fabric configuration. Which evidence directly validates the intended repair?

  1. The known fault produces the expected observed state and alarm without false green status
  2. The intended setting persists through an EDA consistency check without undocumented deviations
  3. The device shows expected routed fabric links and EDA intended state after reconciliation
  4. A failed test change can be traced and restored to the accepted intended state

Explanation

Correct Answer

C:

At Riverton Energy Services, while auditing EDA transactions, the decisive validation is: The device shows expected routed fabric links and EDA intended state after reconciliation. It verifies that the change (Apply the approved fabric intent workflow and verify resulting device configuration and state) resolved the mechanism: Device discovery was mistaken for successful fabric intent realization.

Incorrect Answers

A:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: The known fault produces the expected observed state and alarm without false green status. The alternative focuses on The team uses the absence of alarms as the sole evidence of monitoring completeness, not on the stated defect. For this scenario the expected acceptance result would be: The device shows expected routed fabric links and EDA intended state after reconciliation.

B:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: The intended setting persists through an EDA consistency check without undocumented deviations. This option assumes the other problem (An operator pushes individual switch settings that later drift from centrally managed EDA intent) is present. The case instead describes A newly onboarded device is visible in EDA but lacks its intended fabric configuration, for which the causal issue is Device discovery was mistaken for successful fabric intent realization.

D:

The EDA change plan lacks transaction traceability and pre-change intent baselines, but here the case reports A newly onboarded device is visible in EDA but lacks its intended fabric configuration. Here, device discovery was mistaken for successful fabric intent realization.

Question 799

At Riverton Energy Services, while auditing EDA transactions, the data center fabric team observes: A newly onboarded device is visible in EDA but lacks its intended fabric configuration. Which underlying mechanism best accounts for this symptom?

  1. The orchestrator platform is confused with the intended fabric and service intent definitions
  2. The EDA change plan lacks transaction traceability and pre-change intent baselines
  3. Device discovery was mistaken for successful fabric intent realization
  4. The team uses the absence of alarms as the sole evidence of monitoring completeness

Explanation

Correct Answer

C:

At Riverton Energy Services, while auditing EDA transactions, the evidence points to: Device discovery was mistaken for successful fabric intent realization. The follow-up test (The device shows expected routed fabric links and EDA intended state after reconciliation) distinguishes this mechanism from a separate fabric fault.

Incorrect Answers

A:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: The orchestrator platform is confused with the intended fabric and service intent definitions. This option assumes the other problem (An EDA planning team assumes Kubernetes deployment alone creates fabric connectivity) is present. The case instead describes A newly onboarded device is visible in EDA but lacks its intended fabric configuration, for which the causal issue is Device discovery was mistaken for successful fabric intent realization.

B:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: The EDA change plan lacks transaction traceability and pre-change intent baselines. It tests a different symptom: A fabric automation rollback is planned without a documented approved state to restore. For the observed case, the relevant distinction is Device discovery was mistaken for successful fabric intent realization, with verification: The device shows expected routed fabric links and EDA intended state after reconciliation.

D:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: The team uses the absence of alarms as the sole evidence of monitoring completeness. That choice would be more relevant when this different symptom occurs: An EDA observability panel has no alerts during a test network failure. The present scenario instead points to: Device discovery was mistaken for successful fabric intent realization. The correct resolution has its own verification outcome: The device shows expected routed fabric links and EDA intended state after reconciliation.

Question 800

At Riverton Energy Services, while auditing EDA transactions, the data center fabric team observes: A newly onboarded device is visible in EDA but lacks its intended fabric configuration. Which review gate should be added to prevent the same error?

  1. Include controlled monitoring fixtures in intent-platform acceptance
  2. Require transaction and live-network acceptance for service intent changes
  3. Use device onboarding and intent-compliance gates separately
  4. Check network intent results separately from Kubernetes platform health

Explanation

Correct Answer

C:

At Riverton Energy Services, while auditing EDA transactions, for Riverton Energy Services, include the safeguard: Use device onboarding and intent-compliance gates separately. It reduces repeat risk from the original mechanism and complements a validation of: The device shows expected routed fabric links and EDA intended state after reconciliation.

Incorrect Answers

A:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: Include controlled monitoring fixtures in intent-platform acceptance. It tests a different symptom: An EDA observability panel has no alerts during a test network failure. For the observed case, the relevant distinction is Device discovery was mistaken for successful fabric intent realization, with verification: The device shows expected routed fabric links and EDA intended state after reconciliation.

B:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: Require transaction and live-network acceptance for service intent changes. The option describes a different failure mode: A tenant service deployment is considered complete because EDA accepted the requested intent. It would address An accepted automation transaction was confused with actual service operational success, but here the case reports A newly onboarded device is visible in EDA but lacks its intended fabric configuration. The current required evidence is: The device shows expected routed fabric links and EDA intended state after reconciliation.

D:

At Riverton Energy Services, while auditing EDA transactions, this option proposes: Check network intent results separately from Kubernetes platform health. This is a valid category of fabric maintenance for another scenario (An EDA planning team assumes Kubernetes deployment alone creates fabric connectivity), not the targeted action for Riverton Energy Services. The distinction is the actual cause: Device discovery was mistaken for successful fabric intent realization.