McAfee-Secured Website

Exam Code: NS0-165

Exam Name: NetApp Certified Data Administrator, ONTAP

Certification Provider: Network Appliance

Corresponding Certification: NCDA ONTAP

100% Network Appliance NS0-165 Guaranteed Success With Testking Training Materials

Get Real NS0-165 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

60 Questions & Answers with Testing Engine

"NetApp Certified Data Administrator, ONTAP Exam", also known as NS0-165 exam, is a Network Appliance certification exam.

Pass your tests with the always up-to-date NS0-165 Exam Engine. Your NS0-165 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Network Appliance NS0-165 Practice Test 27

Question 260

The data protection team at Clearwater Airport are responsible for operations databases and maintenance records. Their assessment shows: A cold dataset remains on premium local flash indefinitely despite an approved performance tiering requirement. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?

  1. Cold-block location changes according to policy while frequently used blocks meet the latency objective.
  2. An audited capacity report reconciles physical blocks and logical consumption without double counting.
  3. A synthetic sparse/zero-filled dataset shows appropriate physical savings without altered logical reads.
  4. The measurement shows fewer physical blocks with identical logical data and application read results.

Explanation

Correct Answer

A:

Cold-block location changes according to policy while frequently used blocks meet the latency objective. The observation verifies that the chosen action (Evaluate supported FabricPool or equivalent tiering policy and object-tier compatibility for cold blocks) has corrected the initiating failure (A cold dataset remains on premium local flash indefinitely despite an approved performance tiering requirement). This is directly measurable for Clearwater Airport's operations databases and maintenance records rather than merely reporting task completion.

Incorrect Answers

B:

An audited capacity report reconciles physical blocks and logical consumption without double counting. This is a valid test for another condition (A storage report confuses logical provisioned space with physical written space and declares impossible capacity gains) after a different correction (Compare logical, used, and efficiency metrics from the correct volume and local-tier counters). It does not establish the necessary result for Clearwater Airport's operations databases and maintenance records: Cold-block location changes according to policy while frequently used blocks meet the latency objective.

C:

A synthetic sparse/zero-filled dataset shows appropriate physical savings without altered logical reads. This is a valid test for another condition (An efficiency report claims all zero-filled blocks consume full physical space despite enabled zero-block deduplication) after a different correction (Validate deduplication and zero-block elimination using the relevant ONTAP efficiency counters). It does not establish the necessary result for Clearwater Airport's operations databases and maintenance records: Cold-block location changes according to policy while frequently used blocks meet the latency objective.

D:

The measurement shows fewer physical blocks with identical logical data and application read results. This is a valid test for another condition (A virtual desktop dataset contains repeated OS blocks but storage operators never evaluate deduplication savings) after a different correction (Enable supported deduplication policies and compare physical blocks before and after optimization). It does not establish the necessary result for Clearwater Airport's operations databases and maintenance records: Cold-block location changes according to policy while frequently used blocks meet the latency objective.

Question 261

For Oak River Energy, a proposed storage change affects plant historian archives and virtual machine storage. The identified control failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. Which administrative action BEST addresses the specific problem?

  1. Account for shared block references and overwritten deltas when estimating FlexClone space reclamation.
  2. Compare logical, used, and efficiency metrics from the correct volume and local-tier counters.
  3. Validate deduplication and zero-block elimination using the relevant ONTAP efficiency counters.
  4. Follow supported FlexClone parent/snapshot dependency and split procedures before removing shared references.

Explanation

Correct Answer

A:

Account for shared block references and overwritten deltas when estimating FlexClone space reclamation. This action addresses the specific failure: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. For Oak River Energy's plant historian archives and virtual machine storage, a successful implementation should produce the following evidence: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

Incorrect Answers

B:

Compare logical, used, and efficiency metrics from the correct volume and local-tier counters. That approach targets a different ONTAP condition: A storage report confuses logical provisioned space with physical written space and declares impossible capacity gains. At Oak River Energy, for plant historian archives and virtual machine storage, the actual failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. That alternative by itself would not prove the needed outcome: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

C:

Validate deduplication and zero-block elimination using the relevant ONTAP efficiency counters. That approach targets a different ONTAP condition: An efficiency report claims all zero-filled blocks consume full physical space despite enabled zero-block deduplication. At Oak River Energy, for plant historian archives and virtual machine storage, the actual failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. That alternative by itself would not prove the needed outcome: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

D:

Follow supported FlexClone parent/snapshot dependency and split procedures before removing shared references. That approach targets a different ONTAP condition: A FlexClone is deleted by destroying its source snapshot before confirming clone dependency requirements. At Oak River Energy, for plant historian archives and virtual machine storage, the actual failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. That alternative by itself would not prove the needed outcome: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

Question 262

For Oak River Energy, a proposed storage change affects plant historian archives and virtual machine storage. The identified control failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?

  1. Clone data remains consistent after the planned dependency removal and space usage is accounted for.
  2. An audited capacity report reconciles physical blocks and logical consumption without double counting.
  3. A synthetic sparse/zero-filled dataset shows appropriate physical savings without altered logical reads.
  4. Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

Explanation

Correct Answer

D:

Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed. The observation verifies that the chosen action (Account for shared block references and overwritten deltas when estimating FlexClone space reclamation) has corrected the initiating failure (A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size). This is directly measurable for Oak River Energy's plant historian archives and virtual machine storage rather than merely reporting task completion.

Incorrect Answers

A:

Clone data remains consistent after the planned dependency removal and space usage is accounted for. This is a valid test for another condition (A FlexClone is deleted by destroying its source snapshot before confirming clone dependency requirements) after a different correction (Follow supported FlexClone parent/snapshot dependency and split procedures before removing shared references). It does not establish the necessary result for Oak River Energy's plant historian archives and virtual machine storage: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

B:

An audited capacity report reconciles physical blocks and logical consumption without double counting. This is a valid test for another condition (A storage report confuses logical provisioned space with physical written space and declares impossible capacity gains) after a different correction (Compare logical, used, and efficiency metrics from the correct volume and local-tier counters). It does not establish the necessary result for Oak River Energy's plant historian archives and virtual machine storage: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

C:

A synthetic sparse/zero-filled dataset shows appropriate physical savings without altered logical reads. This is a valid test for another condition (An efficiency report claims all zero-filled blocks consume full physical space despite enabled zero-block deduplication) after a different correction (Validate deduplication and zero-block elimination using the relevant ONTAP efficiency counters). It does not establish the necessary result for Oak River Energy's plant historian archives and virtual machine storage: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

Question 263

A storage engineer reviewing Harbor Point Medical's medical records file services observes: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. Which administrative action BEST addresses the specific problem?

  1. Follow supported FlexClone parent/snapshot dependency and split procedures before removing shared references.
  2. Compare logical, used, and efficiency metrics from the correct volume and local-tier counters.
  3. Account for shared block references and overwritten deltas when estimating FlexClone space reclamation.
  4. Validate deduplication and zero-block elimination using the relevant ONTAP efficiency counters.

Explanation

Correct Answer

C:

Account for shared block references and overwritten deltas when estimating FlexClone space reclamation. This action addresses the specific failure: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. For Harbor Point Medical's medical records file services, a successful implementation should produce the following evidence: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

Incorrect Answers

A:

Follow supported FlexClone parent/snapshot dependency and split procedures before removing shared references. That approach targets a different ONTAP condition: A FlexClone is deleted by destroying its source snapshot before confirming clone dependency requirements. At Harbor Point Medical, for medical records file services, the actual failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. That alternative by itself would not prove the needed outcome: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

B:

Compare logical, used, and efficiency metrics from the correct volume and local-tier counters. That approach targets a different ONTAP condition: A storage report confuses logical provisioned space with physical written space and declares impossible capacity gains. At Harbor Point Medical, for medical records file services, the actual failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. That alternative by itself would not prove the needed outcome: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

D:

Validate deduplication and zero-block elimination using the relevant ONTAP efficiency counters. That approach targets a different ONTAP condition: An efficiency report claims all zero-filled blocks consume full physical space despite enabled zero-block deduplication. At Harbor Point Medical, for medical records file services, the actual failure is: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. That alternative by itself would not prove the needed outcome: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

Question 264

A storage engineer reviewing Harbor Point Medical's medical records file services observes: A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?

  1. An audited capacity report reconciles physical blocks and logical consumption without double counting.
  2. Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.
  3. A synthetic sparse/zero-filled dataset shows appropriate physical savings without altered logical reads.
  4. Clone data remains consistent after the planned dependency removal and space usage is accounted for.

Explanation

Correct Answer

B:

Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed. The observation verifies that the chosen action (Account for shared block references and overwritten deltas when estimating FlexClone space reclamation) has corrected the initiating failure (A heavily deduplicated shared dataset is cloned for QA and planners assume deleting the clone immediately restores its whole logical size). This is directly measurable for Harbor Point Medical's medical records file services rather than merely reporting task completion.

Incorrect Answers

A:

An audited capacity report reconciles physical blocks and logical consumption without double counting. This is a valid test for another condition (A storage report confuses logical provisioned space with physical written space and declares impossible capacity gains) after a different correction (Compare logical, used, and efficiency metrics from the correct volume and local-tier counters). It does not establish the necessary result for Harbor Point Medical's medical records file services: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

C:

A synthetic sparse/zero-filled dataset shows appropriate physical savings without altered logical reads. This is a valid test for another condition (An efficiency report claims all zero-filled blocks consume full physical space despite enabled zero-block deduplication) after a different correction (Validate deduplication and zero-block elimination using the relevant ONTAP efficiency counters). It does not establish the necessary result for Harbor Point Medical's medical records file services: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

D:

Clone data remains consistent after the planned dependency removal and space usage is accounted for. This is a valid test for another condition (A FlexClone is deleted by destroying its source snapshot before confirming clone dependency requirements) after a different correction (Follow supported FlexClone parent/snapshot dependency and split procedures before removing shared references). It does not establish the necessary result for Harbor Point Medical's medical records file services: Physical capacity reports show only uniquely referenced blocks reclaimed when the clone is removed.

Question 265

Riverbend Automotive manages vehicle diagnostics and engineering data with a limited change window. A storage incident report states: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. Which administrative action BEST addresses the specific problem?

  1. Design data LIF failover groups and home-port policies for supported NAS high availability.
  2. Separate supported cluster networking from data access networking in the physical design.
  3. Evaluate link speed, supported interface aggregation and redundant path design against measured throughput.
  4. Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set.

Explanation

Correct Answer

A:

Design data LIF failover groups and home-port policies for supported NAS high availability. This action addresses the specific failure: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. For Riverbend Automotive's vehicle diagnostics and engineering data, a successful implementation should produce the following evidence: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

Incorrect Answers

B:

Separate supported cluster networking from data access networking in the physical design. That approach targets a different ONTAP condition: A cluster interconnect switch is reused for arbitrary client traffic without checking the supported cluster switch topology. At Riverbend Automotive, for vehicle diagnostics and engineering data, the actual failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. That alternative by itself would not prove the needed outcome: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

C:

Evaluate link speed, supported interface aggregation and redundant path design against measured throughput. That approach targets a different ONTAP condition: A high-bandwidth NAS share is connected through an unplanned single slow uplink while the required service target needs more capacity. At Riverbend Automotive, for vehicle diagnostics and engineering data, the actual failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. That alternative by itself would not prove the needed outcome: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

D:

Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set. That approach targets a different ONTAP condition: An administrator creates LIFs on arbitrary physical ports without checking port, broadcast-domain and failover-group membership. At Riverbend Automotive, for vehicle diagnostics and engineering data, the actual failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. That alternative by itself would not prove the needed outcome: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

Question 266

Riverbend Automotive manages vehicle diagnostics and engineering data with a limited change window. A storage incident report states: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?

  1. LIF placement and failover tests show only allowed network ports are used.
  2. Cluster network health remains stable under a representative client traffic load.
  3. A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.
  4. A load test achieves the planned bandwidth and survives loss of one approved member link.

Explanation

Correct Answer

C:

A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability. The observation verifies that the chosen action (Design data LIF failover groups and home-port policies for supported NAS high availability) has corrected the initiating failure (A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists). This is directly measurable for Riverbend Automotive's vehicle diagnostics and engineering data rather than merely reporting task completion.

Incorrect Answers

A:

LIF placement and failover tests show only allowed network ports are used. This is a valid test for another condition (An administrator creates LIFs on arbitrary physical ports without checking port, broadcast-domain and failover-group membership) after a different correction (Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set). It does not establish the necessary result for Riverbend Automotive's vehicle diagnostics and engineering data: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

B:

Cluster network health remains stable under a representative client traffic load. This is a valid test for another condition (A cluster interconnect switch is reused for arbitrary client traffic without checking the supported cluster switch topology) after a different correction (Separate supported cluster networking from data access networking in the physical design). It does not establish the necessary result for Riverbend Automotive's vehicle diagnostics and engineering data: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

D:

A load test achieves the planned bandwidth and survives loss of one approved member link. This is a valid test for another condition (A high-bandwidth NAS share is connected through an unplanned single slow uplink while the required service target needs more capacity) after a different correction (Evaluate link speed, supported interface aggregation and redundant path design against measured throughput). It does not establish the necessary result for Riverbend Automotive's vehicle diagnostics and engineering data: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

Question 267

For Pinecrest Research, a proposed storage change affects scientific datasets and GPU project file shares. The identified control failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. Which administrative action BEST addresses the specific problem?

  1. Evaluate link speed, supported interface aggregation and redundant path design against measured throughput.
  2. Design data LIF failover groups and home-port policies for supported NAS high availability.
  3. Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set.
  4. Separate supported cluster networking from data access networking in the physical design.

Explanation

Correct Answer

B:

Design data LIF failover groups and home-port policies for supported NAS high availability. This action addresses the specific failure: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. For Pinecrest Research's scientific datasets and GPU project file shares, a successful implementation should produce the following evidence: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

Incorrect Answers

A:

Evaluate link speed, supported interface aggregation and redundant path design against measured throughput. That approach targets a different ONTAP condition: A high-bandwidth NAS share is connected through an unplanned single slow uplink while the required service target needs more capacity. At Pinecrest Research, for scientific datasets and GPU project file shares, the actual failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. That alternative by itself would not prove the needed outcome: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

C:

Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set. That approach targets a different ONTAP condition: An administrator creates LIFs on arbitrary physical ports without checking port, broadcast-domain and failover-group membership. At Pinecrest Research, for scientific datasets and GPU project file shares, the actual failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. That alternative by itself would not prove the needed outcome: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

D:

Separate supported cluster networking from data access networking in the physical design. That approach targets a different ONTAP condition: A cluster interconnect switch is reused for arbitrary client traffic without checking the supported cluster switch topology. At Pinecrest Research, for scientific datasets and GPU project file shares, the actual failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. That alternative by itself would not prove the needed outcome: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

Question 268

For Pinecrest Research, a proposed storage change affects scientific datasets and GPU project file shares. The identified control failure is: A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?

  1. A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.
  2. A load test achieves the planned bandwidth and survives loss of one approved member link.
  3. Cluster network health remains stable under a representative client traffic load.
  4. LIF placement and failover tests show only allowed network ports are used.

Explanation

Correct Answer

A:

A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability. The observation verifies that the chosen action (Design data LIF failover groups and home-port policies for supported NAS high availability) has corrected the initiating failure (A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists). This is directly measurable for Pinecrest Research's scientific datasets and GPU project file shares rather than merely reporting task completion.

Incorrect Answers

B:

A load test achieves the planned bandwidth and survives loss of one approved member link. This is a valid test for another condition (A high-bandwidth NAS share is connected through an unplanned single slow uplink while the required service target needs more capacity) after a different correction (Evaluate link speed, supported interface aggregation and redundant path design against measured throughput). It does not establish the necessary result for Pinecrest Research's scientific datasets and GPU project file shares: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

C:

Cluster network health remains stable under a representative client traffic load. This is a valid test for another condition (A cluster interconnect switch is reused for arbitrary client traffic without checking the supported cluster switch topology) after a different correction (Separate supported cluster networking from data access networking in the physical design). It does not establish the necessary result for Pinecrest Research's scientific datasets and GPU project file shares: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

D:

LIF placement and failover tests show only allowed network ports are used. This is a valid test for another condition (An administrator creates LIFs on arbitrary physical ports without checking port, broadcast-domain and failover-group membership) after a different correction (Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set). It does not establish the necessary result for Pinecrest Research's scientific datasets and GPU project file shares: A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability.

Question 269

At Crescent Education, the production environment supports student records and backup repositories under a measured storage-latency target. Investigators find: A tenant VLAN is created on a trunk that is not permitted on the upstream switch ports and NAS access fails. Which administrative action BEST addresses the specific problem?

  1. Provide proper protocol-serving data LIFs and keep management functions on authorized management interfaces.
  2. Align ONTAP VLAN interfaces, broadcast domains and upstream switch VLAN membership.
  3. Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set.
  4. Separate supported cluster networking from data access networking in the physical design.

Explanation

Correct Answer

B:

Align ONTAP VLAN interfaces, broadcast domains and upstream switch VLAN membership. This action addresses the specific failure: A tenant VLAN is created on a trunk that is not permitted on the upstream switch ports and NAS access fails. For Crescent Education's student records and backup repositories, a successful implementation should produce the following evidence: Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.

Incorrect Answers

A:

Provide proper protocol-serving data LIFs and keep management functions on authorized management interfaces. That approach targets a different ONTAP condition: A project uses a management LIF for production client data access and bypasses the intended data network isolation. At Crescent Education, for student records and backup repositories, the actual failure is: A tenant VLAN is created on a trunk that is not permitted on the upstream switch ports and NAS access fails. That alternative by itself would not prove the needed outcome: Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.

C:

Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set. That approach targets a different ONTAP condition: An administrator creates LIFs on arbitrary physical ports without checking port, broadcast-domain and failover-group membership. At Crescent Education, for student records and backup repositories, the actual failure is: A tenant VLAN is created on a trunk that is not permitted on the upstream switch ports and NAS access fails. That alternative by itself would not prove the needed outcome: Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.

D:

Separate supported cluster networking from data access networking in the physical design. That approach targets a different ONTAP condition: A cluster interconnect switch is reused for arbitrary client traffic without checking the supported cluster switch topology. At Crescent Education, for student records and backup repositories, the actual failure is: A tenant VLAN is created on a trunk that is not permitted on the upstream switch ports and NAS access fails. That alternative by itself would not prove the needed outcome: Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.

Question 270

At Crescent Education, the production environment supports student records and backup repositories under a measured storage-latency target. Investigators find: A tenant VLAN is created on a trunk that is not permitted on the upstream switch ports and NAS access fails. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?

  1. Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.
  2. Clients use the designated data LIF while the cluster management endpoint is restricted.
  3. LIF placement and failover tests show only allowed network ports are used.
  4. Cluster network health remains stable under a representative client traffic load.

Explanation

Correct Answer

A:

Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated. The observation verifies that the chosen action (Align ONTAP VLAN interfaces, broadcast domains and upstream switch VLAN membership) has corrected the initiating failure (A tenant VLAN is created on a trunk that is not permitted on the upstream switch ports and NAS access fails). This is directly measurable for Crescent Education's student records and backup repositories rather than merely reporting task completion.

Incorrect Answers

B:

Clients use the designated data LIF while the cluster management endpoint is restricted. This is a valid test for another condition (A project uses a management LIF for production client data access and bypasses the intended data network isolation) after a different correction (Provide proper protocol-serving data LIFs and keep management functions on authorized management interfaces). It does not establish the necessary result for Crescent Education's student records and backup repositories: Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.

C:

LIF placement and failover tests show only allowed network ports are used. This is a valid test for another condition (An administrator creates LIFs on arbitrary physical ports without checking port, broadcast-domain and failover-group membership) after a different correction (Assign data LIFs to appropriate ONTAP ports and broadcast domains with a valid failover target set). It does not establish the necessary result for Crescent Education's student records and backup repositories: Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.

D:

Cluster network health remains stable under a representative client traffic load. This is a valid test for another condition (A cluster interconnect switch is reused for arbitrary client traffic without checking the supported cluster switch topology) after a different correction (Separate supported cluster networking from data access networking in the physical design). It does not establish the necessary result for Crescent Education's student records and backup repositories: Tagged client traffic reaches the intended data LIF and an unrelated VLAN remains isolated.

NetApp Certified Data Administrator, ONTAP (NS0-165) Practice Tests