McAfee-Secured Website

Exam Code: JN0-664

Exam Name: Service Provider Routing and Switching, Professional (JNCIP-SP)

Certification Provider: Juniper

Corresponding Certification: JNCIP-SP

100% Juniper JN0-664 Guaranteed Success With Testking Training Materials

Get Real JN0-664 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

96 Questions & Answers with Testing Engine

"Service Provider Routing and Switching, Professional (JNCIP-SP) Exam", also known as JN0-664 exam, is a Juniper certification exam.

Pass your tests with the always up-to-date JN0-664 Exam Engine. Your JN0-664 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Juniper JN0-664 Practice Test 71

Question 700

A provider transports customer VLAN frames over an L2 circuit. Observed: Customer tags disappear at the remote CE port. Which change-acceptance control is most relevant to preventing this exact failure?

  1. For each approved related change, verify that both IPv4 and IPv6 EtherTypes cross according to the customer contract. Flag recurrence if iPv6 frames fail while ordinary IPv4 packets cross the same circuit.
  2. For each approved related change, verify that mAC stability returns and failover works without a storm. Flag recurrence if mAC movement and broadcast storms appear after both CE ports activate.
  3. For each approved related change, verify that remote captures preserve the contracted customer VLAN header. Flag recurrence if customer tags disappear at the remote CE port.
  4. For each approved related change, verify that both ends exchange VC labels and the pseudowire becomes operational. Flag recurrence if the circuit stays Down because no VC label is negotiated.

Explanation

Correct Answer

C:

The control is specific to the initial failure. It requires the result Remote captures preserve the contracted customer VLAN header. and treats Customer tags disappear at the remote CE port. as a failure signal. The causal concern is vlan tagging and pseudowire encapsulation semantics differ at the endpoints.

Incorrect Answers

A:

The proposed control is tied to the service has an inappropriate ethertype filter or nontransparent encapsulation, typically observed when iPv6 frames fail while ordinary IPv4 packets cross the same circuit. Here the target is vlan tagging and pseudowire encapsulation semantics differ at the endpoints; monitor remote captures preserve the contracted customer VLAN header.

B:

This gate monitors a different failure, mac movement and broadcast storms appear after both ce ports activate. It would not detect the current problem: Customer tags disappear at the remote CE port. The appropriate check requires remote captures preserve the contracted customer VLAN header.

D:

It is valid for another service scenario but checks the circuit stays down because no vc label is negotiated. This case instead needs a gate for customer tags disappear at the remote ce port and evidence that remote captures preserve the contracted customer VLAN header.

Question 701

Two LDP pseudowire PEs have reachable loopback addresses. Observed: The circuit stays Down because no VC label is negotiated. What should the routing engineer change first to address this particular symptom?

  1. Align stacked VLAN handling and supported pseudowire encapsulation at both PEs.
  2. Correct the remote attachment circuit interface mapping for the VC.
  3. Repair targeted LDP peering and the configured circuit neighbor relationship.
  4. Establish required LDP VPLS signaling and service identifiers.

Explanation

Correct Answer

C:

The decisive evidence is that The circuit stays Down because no VC label is negotiated. This follows from the pes do not establish the required targeted ldp signaling for the remote endpoint. The focused remedy is to repair targeted LDP peering and the configured circuit neighbor relationship. Confirm improvement when both ends exchange VC labels and the pseudowire becomes operational. Validate on an approved lab or change window before touching production.

Incorrect Answers

A:

This remediates qinq tag handling differs between ingress and remote attachment circuits, normally indicated by Only the outer service VLAN survives and nested customer tags are lost. It would leave the observed problem (The circuit stays Down because no VC label is negotiated) unresolved. Address it with repair targeted LDP peering and the configured circuit neighbor relationship.

B:

This change belongs to a different Layer 2 VPNs issue: The near-end L2 circuit is Up but remote customer frames do not return. That issue involves a remote attachment circuit is mapped to the wrong customer interface. The current symptom is The circuit stays Down because no VC label is negotiated. It instead requires repair targeted LDP peering and the configured circuit neighbor relationship.

D:

The option may be useful when a PE cannot find the other site's pseudowire although the underlay path is healthy, but that is not the current evidence. Here, the circuit stays Down because no VC label is negotiated, indicating the pes do not establish the required targeted ldp signaling for the remote endpoint. The targeted action is Repair targeted LDP peering and the configured circuit neighbor relationship.

Question 702

Two LDP pseudowire PEs have reachable loopback addresses. Observed: The circuit stays Down because no VC label is negotiated. Which acceptance observation best confirms that the proposed change worked?

  1. Both ends exchange VC labels and the pseudowire becomes operational.
  2. Captures at both sites show identical intended inner and outer tag structure.
  3. All VPLS members exchange signaling and form the expected forwarding topology.
  4. End-to-end unicast test traffic reaches only the intended customer port.

Explanation

Correct Answer

A:

This acceptance criterion tests the actual fault. The source evidence was The circuit stays Down because no VC label is negotiated. The correction addresses the pes do not establish the required targeted ldp signaling for the remote endpoint; success requires both ends exchange VC labels and the pseudowire becomes operational.

Incorrect Answers

B:

This result is useful in another case with evidence Only the outer service VLAN survives and nested customer tags are lost. It does not test recovery from the circuit stays down because no vc label is negotiated. Check instead whether both ends exchange VC labels and the pseudowire becomes operational.

C:

That observation would verify a separate fault involving vpls signaling or targeted ldp sessions are missing between pes. Its symptom is A PE cannot find the other site's pseudowire although the underlay path is healthy. For this case the actual issue is the pes do not establish the required targeted ldp signaling for the remote endpoint, and the relevant success signal is Both ends exchange VC labels and the pseudowire becomes operational.

D:

It confirms an unrelated service correction: A remote attachment circuit is mapped to the wrong customer interface. The present case reports The circuit stays Down because no VC label is negotiated. Its completion test is Both ends exchange VC labels and the pseudowire becomes operational.

Question 703

Two LDP pseudowire PEs have reachable loopback addresses. Observed: The circuit stays Down because no VC label is negotiated. What is the most likely source of the observed routing or service failure?

  1. The PEs do not establish the required targeted LDP signaling for the remote endpoint.
  2. QinQ tag handling differs between ingress and remote attachment circuits.
  3. A remote attachment circuit is mapped to the wrong customer interface.
  4. VPLS signaling or targeted LDP sessions are missing between PEs.

Explanation

Correct Answer

A:

This explanation is the closest match to the observed symptom: The circuit stays Down because no VC label is negotiated. The specified root issue is The PEs do not establish the required targeted LDP signaling for the remote endpoint. Repair it through repair targeted LDP peering and the configured circuit neighbor relationship, then check both ends exchange VC labels and the pseudowire becomes operational.

Incorrect Answers

B:

That explanation fits another condition: Only the outer service VLAN survives and nested customer tags are lost. The evidence here is The circuit stays Down because no VC label is negotiated. Its closer root cause is The PEs do not establish the required targeted LDP signaling for the remote endpoint.

C:

A remote attachment circuit is mapped to the wrong customer interface. would normally be accompanied by the near-end l2 circuit is up but remote customer frames do not return. The observed symptom is different: The circuit stays Down because no VC label is negotiated. The likely cause is The PEs do not establish the required targeted LDP signaling for the remote endpoint.

D:

The stated cause is possible elsewhere but explains a pe cannot find the other site's pseudowire although the underlay path is healthy, not the circuit stays down because no vc label is negotiated. This incident is better attributed to the pes do not establish the required targeted ldp signaling for the remote endpoint.

Question 704

Two LDP pseudowire PEs have reachable loopback addresses. Observed: The circuit stays Down because no VC label is negotiated. What operational check best guards against this problem returning?

  1. For each approved related change, verify that both ends exchange VC labels and the pseudowire becomes operational. Flag recurrence if the circuit stays Down because no VC label is negotiated.
  2. For each approved related change, verify that end-to-end unicast test traffic reaches only the intended customer port. Flag recurrence if the near-end L2 circuit is Up but remote customer frames do not return.
  3. For each approved related change, verify that captures at both sites show identical intended inner and outer tag structure. Flag recurrence if only the outer service VLAN survives and nested customer tags are lost.
  4. For each approved related change, verify that all VPLS members exchange signaling and form the expected forwarding topology. Flag recurrence if a PE cannot find the other site's pseudowire although the underlay path is healthy.

Explanation

Correct Answer

A:

This control asks for the same recovery evidence (Both ends exchange VC labels and the pseudowire becomes operational) and flags recurrence of the same failure (The circuit stays Down because no VC label is negotiated). It targets the underlying issue, the pes do not establish the required targeted ldp signaling for the remote endpoint, rather than a different service problem. The exact cadence must be agreed with operations.

Incorrect Answers

B:

This gate monitors a different failure, the near-end l2 circuit is up but remote customer frames do not return. It would not detect the current problem: The circuit stays Down because no VC label is negotiated. The appropriate check requires both ends exchange VC labels and the pseudowire becomes operational.

C:

It is valid for another service scenario but checks only the outer service vlan survives and nested customer tags are lost. This case instead needs a gate for the circuit stays down because no vc label is negotiated and evidence that both ends exchange VC labels and the pseudowire becomes operational.

D:

The proposed control is tied to vpls signaling or targeted ldp sessions are missing between pes, typically observed when a PE cannot find the other site's pseudowire although the underlay path is healthy. Here the target is the pes do not establish the required targeted ldp signaling for the remote endpoint; monitor both ends exchange VC labels and the pseudowire becomes operational.

Question 705

A wholesale provider delivers a point-to-point Ethernet circuit. Observed: The near-end L2 circuit is Up but remote customer frames do not return. Which targeted remediation is most appropriate for the observed condition?

  1. Correct the remote attachment circuit interface mapping for the VC.
  2. Repair supported EVPN label allocation and MPLS transport resolution.
  3. Select a supported interworking mode and align encapsulation on both PEs.
  4. Apply supported VPLS storm control and consider a scalable EVPN design.

Explanation

Correct Answer

A:

This fix addresses the stated cause rather than an unrelated protocol. The reported symptom—The near-end L2 circuit is Up but remote customer frames do not return—is consistent with a remote attachment circuit is mapped to the wrong customer interface. Use the specified correction, then verify: End-to-end unicast test traffic reaches only the intended customer port. Preserve existing policy and tenant isolation.

Incorrect Answers

B:

This change belongs to a different Layer 2 VPNs issue: One PE advertises a MAC route but no corresponding service label is usable. That issue involves evpn mpls service-label mapping is missing or mismatched across control and forwarding planes. The current symptom is The near-end L2 circuit is Up but remote customer frames do not return. It instead requires correct the remote attachment circuit interface mapping for the VC.

C:

The option may be useful when data is discarded because the ingress and egress service framing differ, but that is not the current evidence. Here, the near-end L2 circuit is Up but remote customer frames do not return, indicating a remote attachment circuit is mapped to the wrong customer interface. The targeted action is Correct the remote attachment circuit interface mapping for the VC.

D:

This remediates flooding and mac learning behavior were not accounted for as the broadcast domain grew, normally indicated by Broadcast and unknown-unicast replication overloads the service. It would leave the observed problem (The near-end L2 circuit is Up but remote customer frames do not return) unresolved. Address it with correct the remote attachment circuit interface mapping for the VC.

Question 706

A wholesale provider delivers a point-to-point Ethernet circuit. Observed: The near-end L2 circuit is Up but remote customer frames do not return. What evidence would validate recovery from this precise failure mode?

  1. End-to-end unicast test traffic reaches only the intended customer port.
  2. Broadcast utilization drops while essential MAC discovery and traffic still work.
  3. Test frames cross with correct service framing and no unexpected protocol drops.
  4. Remote MAC lookup resolves a valid EVPN service label and frames forward.

Explanation

Correct Answer

A:

The intended result is End-to-end unicast test traffic reaches only the intended customer port. It specifically verifies recovery from a remote attachment circuit is mapped to the wrong customer interface, which produced the original symptom: The near-end L2 circuit is Up but remote customer frames do not return. It is stronger evidence than a generic interface-up indicator.

Incorrect Answers

B:

This result is useful in another case with evidence Broadcast and unknown-unicast replication overloads the service. It does not test recovery from the near-end l2 circuit is up but remote customer frames do not return. Check instead whether end-to-end unicast test traffic reaches only the intended customer port.

C:

That observation would verify a separate fault involving layer 2 interworking and payload encapsulation expectations are incompatible. Its symptom is Data is discarded because the ingress and egress service framing differ. For this case the actual issue is a remote attachment circuit is mapped to the wrong customer interface, and the relevant success signal is End-to-end unicast test traffic reaches only the intended customer port.

D:

It confirms an unrelated service correction: EVPN MPLS service-label mapping is missing or mismatched across control and forwarding planes. The present case reports The near-end L2 circuit is Up but remote customer frames do not return. Its completion test is End-to-end unicast test traffic reaches only the intended customer port.

Question 707

A wholesale provider delivers a point-to-point Ethernet circuit. Observed: The near-end L2 circuit is Up but remote customer frames do not return. What underlying protocol or service configuration problem best explains the evidence?

  1. Layer 2 interworking and payload encapsulation expectations are incompatible.
  2. A remote attachment circuit is mapped to the wrong customer interface.
  3. Flooding and MAC learning behavior were not accounted for as the broadcast domain grew.
  4. EVPN MPLS service-label mapping is missing or mismatched across control and forwarding planes.

Explanation

Correct Answer

B:

Because the near-end L2 circuit is Up but remote customer frames do not return, the likely cause is a remote attachment circuit is mapped to the wrong customer interface. It is testable: Correct the remote attachment circuit interface mapping for the VC. Expected follow-up: End-to-end unicast test traffic reaches only the intended customer port.

Incorrect Answers

A:

The stated cause is possible elsewhere but explains data is discarded because the ingress and egress service framing differ, not the near-end l2 circuit is up but remote customer frames do not return. This incident is better attributed to a remote attachment circuit is mapped to the wrong customer interface.

C:

That explanation fits another condition: Broadcast and unknown-unicast replication overloads the service. The evidence here is The near-end L2 circuit is Up but remote customer frames do not return. Its closer root cause is A remote attachment circuit is mapped to the wrong customer interface.

D:

EVPN MPLS service-label mapping is missing or mismatched across control and forwarding planes. would normally be accompanied by one pe advertises a mac route but no corresponding service label is usable. The observed symptom is different: The near-end L2 circuit is Up but remote customer frames do not return. The likely cause is A remote attachment circuit is mapped to the wrong customer interface.

Question 708

A wholesale provider delivers a point-to-point Ethernet circuit. Observed: The near-end L2 circuit is Up but remote customer frames do not return. Which ongoing validation gate would best detect a recurrence of this problem?

  1. For each approved related change, verify that end-to-end unicast test traffic reaches only the intended customer port. Flag recurrence if the near-end L2 circuit is Up but remote customer frames do not return.
  2. For each approved related change, verify that remote MAC lookup resolves a valid EVPN service label and frames forward. Flag recurrence if one PE advertises a MAC route but no corresponding service label is usable.
  3. For each approved related change, verify that test frames cross with correct service framing and no unexpected protocol drops. Flag recurrence if data is discarded because the ingress and egress service framing differ.
  4. For each approved related change, verify that broadcast utilization drops while essential MAC discovery and traffic still work. Flag recurrence if broadcast and unknown-unicast replication overloads the service.

Explanation

Correct Answer

A:

A useful regression gate tests whether end-to-end unicast test traffic reaches only the intended customer port and alerts when the near-end L2 circuit is Up but remote customer frames do not return. This directly checks the technical weakness: A remote attachment circuit is mapped to the wrong customer interface. The gate is derived from the fictional incident and is not an independent Juniper engineer signoff.

Incorrect Answers

B:

This gate monitors a different failure, one pe advertises a mac route but no corresponding service label is usable. It would not detect the current problem: The near-end L2 circuit is Up but remote customer frames do not return. The appropriate check requires end-to-end unicast test traffic reaches only the intended customer port.

C:

The proposed control is tied to layer 2 interworking and payload encapsulation expectations are incompatible, typically observed when data is discarded because the ingress and egress service framing differ. Here the target is a remote attachment circuit is mapped to the wrong customer interface; monitor end-to-end unicast test traffic reaches only the intended customer port.

D:

It is valid for another service scenario but checks broadcast and unknown-unicast replication overloads the service. This case instead needs a gate for the near-end l2 circuit is up but remote customer frames do not return and evidence that end-to-end unicast test traffic reaches only the intended customer port.

Question 709

An interworking pseudowire carries Ethernet between dissimilar CE interfaces. Observed: Data is discarded because the ingress and egress service framing differ. Which change most directly corrects the failure while respecting the existing service boundary?

  1. Align contracted L2VPN RT memberships on each involved PE.
  2. Select a supported interworking mode and align encapsulation on both PEs.
  3. Align bridge MAC aging and EVPN/VPLS learning with the customer's change profile.
  4. Enable proper type-2 MAC route origination and scoped EVPN RT exchange.

Explanation

Correct Answer

B:

The observed condition is Data is discarded because the ingress and egress service framing differ. That indicates layer 2 interworking and payload encapsulation expectations are incompatible. Applying the proposed remedy directly changes that condition. A concrete completion check is: Test frames cross with correct service framing and no unexpected protocol drops.

Incorrect Answers

A:

This remediates import route targets do not include the originating l2vpn service, normally indicated by One remote PE receives BGP routes but does not establish the required connection. It would leave the observed problem (Data is discarded because the ingress and egress service framing differ) unresolved. Address it with select a supported interworking mode and align encapsulation on both PEs.

C:

The option may be useful when one CE continues forwarding to a moved MAC on a stale port, but that is not the current evidence. Here, data is discarded because the ingress and egress service framing differ, indicating layer 2 interworking and payload encapsulation expectations are incompatible. The targeted action is Select a supported interworking mode and align encapsulation on both PEs.

D:

This change belongs to a different Layer 2 VPNs issue: The remote PE never learns the MAC although EVPN BGP neighbors are Established. That issue involves mac/ip route type 2 advertisement or its route-target import is missing. The current symptom is Data is discarded because the ingress and egress service framing differ. It instead requires select a supported interworking mode and align encapsulation on both PEs.

Question 710

An interworking pseudowire carries Ethernet between dissimilar CE interfaces. Observed: Data is discarded because the ingress and egress service framing differ. After the correction, which result would most convincingly show that this fault is resolved?

  1. Test frames cross with correct service framing and no unexpected protocol drops.
  2. Moved MACs converge to their new attachment within accepted time.
  3. Each intended site imports the circuit NLRI and builds its matching connection.
  4. The remote PE installs the authorized MAC and forwards unicast across the service.

Explanation

Correct Answer

A:

After select a supported interworking mode and align encapsulation on both PEs, inspect whether test frames cross with correct service framing and no unexpected protocol drops. This closes the loop between the reported observation (Data is discarded because the ingress and egress service framing differ) and the underlying issue (Layer 2 interworking and payload encapsulation expectations are incompatible).

Incorrect Answers

B:

That observation would verify a separate fault involving mac aging and control-plane refresh behavior conflict with the active service topology. Its symptom is One CE continues forwarding to a moved MAC on a stale port. For this case the actual issue is layer 2 interworking and payload encapsulation expectations are incompatible, and the relevant success signal is Test frames cross with correct service framing and no unexpected protocol drops.

C:

This result is useful in another case with evidence One remote PE receives BGP routes but does not establish the required connection. It does not test recovery from data is discarded because the ingress and egress service framing differ. Check instead whether test frames cross with correct service framing and no unexpected protocol drops.

D:

It confirms an unrelated service correction: MAC/IP route type 2 advertisement or its route-target import is missing. The present case reports Data is discarded because the ingress and egress service framing differ. Its completion test is Test frames cross with correct service framing and no unexpected protocol drops.

Service Provider Routing and Switching, Professional (JNCIP-SP) (JN0-664) Practice Tests