Question 60
Fictional Stonefield Asset Services is completing a supervised field-system review with plant engineering and operations personnel. During an engineering change review, the case presents this industrial security assessment concern: An OEM supplies a self-contained pump skid, but the site and supplier each assume the other owns risk assessment of its embedded controller. The team must prioritize safe operation, authorized assessment methods, and evidence from the actual process environment. Which maintenance or change-trigger review should accompany the proposed decision?
Explanation
Correct Answer
Review ownership at design approval, factory acceptance, installation, service renewal, and decommissioning. It helps maintain the control because the existence of a procurement contract does not itself allocate cybersecurity accountability across shared industrial control interfaces.
Incorrect Answers
Tie controller additions and cabinet modifications to asset-register updates and periodic reconciliation. Unlisted control assets cannot be evaluated for credible exposure, supportability, or consequences simply by counting servers. To reduce recurrence in this case, review ownership at design approval, factory acceptance, installation, service renewal, and decommissioning.
Reconcile I/O communication maps after cabinet expansion and network switch replacement. Distributed I/O is part of the operational control function even when no operator logs directly into the remote rack. To reduce recurrence in this case, review ownership at design approval, factory acceptance, installation, service renewal, and decommissioning.
Revisit rare-event likelihood assumptions after threat intelligence, architecture changes, and new consequence evidence. Lack of recorded incidents over a short period does not prove a rare high-consequence event cannot occur. To reduce recurrence in this case, review ownership at design approval, factory acceptance, installation, service renewal, and decommissioning.