Question 630
Fictional Northshore Plant Operations is completing a plant connectivity architecture assessment with plant engineering and operations personnel. During an operator-led risk workshop, the case presents this industrial security assessment concern: A manufacturing facility allows enterprise analytics desktops to query the live plant historian database from general office subnets without a defined boundary. The team must prioritize safe operation, authorized assessment methods, and evidence from the actual process environment. Which maintenance or change-trigger review should accompany the proposed decision?
Explanation
Correct Answer
Revalidate external consumers and permitted flows whenever new reports or cloud integrations are deployed. That recurring check targets the underlying weakness: shared data requirements need not justify unrestricted network reachability across industrial trust boundaries.
Incorrect Answers
Tie controller additions and cabinet modifications to asset-register updates and periodic reconciliation. Unlisted control assets cannot be evaluated for credible exposure, supportability, or consequences simply by counting servers. The relevant follow-up is: Revalidate external consumers and permitted flows whenever new reports or cloud integrations are deployed.
Require device-specific safe-discovery approval whenever assessment tools or control hardware change. Industrial devices may react unpredictably to unexpected traffic even when conventional IT scanners consider probes nonintrusive. The relevant follow-up is: Revalidate external consumers and permitted flows whenever new reports or cloud integrations are deployed.
Reassess capture coverage after network redesign, controller redundancy changes, and new segmented links. Passive collection cannot prove absence of a vulnerability on network paths it never monitored. The relevant follow-up is: Revalidate external consumers and permitted flows whenever new reports or cloud integrations are deployed.