Question 620
Fictional Silvercross Operations Centre is completing an inter-zone communication analysis with plant engineering and operations personnel. During a vendor support review, the case presents this industrial security assessment concern: A control-network diagram shows a firewall between operational and supplier zones but omits the diagnostic tunnel established by a vendor appliance. The team must prioritize safe operation, authorized assessment methods, and evidence from the actual process environment. Which repeatable governance check should keep the assessment finding current?
Explanation
Correct Answer
Review conduit records when appliances, VPN services, or vendor diagnostic contracts change. That recurring check targets the underlying weakness: a drawn zone boundary is ineffective as risk evidence if important pathways across it have not been modeled.
Incorrect Answers
Tie controller additions and cabinet modifications to asset-register updates and periodic reconciliation. Unlisted control assets cannot be evaluated for credible exposure, supportability, or consequences simply by counting servers. The relevant follow-up is: Review conduit records when appliances, VPN services, or vendor diagnostic contracts change.
Require device-specific safe-discovery approval whenever assessment tools or control hardware change. Industrial devices may react unpredictably to unexpected traffic even when conventional IT scanners consider probes nonintrusive. The relevant follow-up is: Review conduit records when appliances, VPN services, or vendor diagnostic contracts change.
Reassess capture coverage after network redesign, controller redundancy changes, and new segmented links. Passive collection cannot prove absence of a vulnerability on network paths it never monitored. The relevant follow-up is: Review conduit records when appliances, VPN services, or vendor diagnostic contracts change.