Question 70
At a design studio in Berlin, engineers report that the uplink is active yet the management VRF has no route to the onboarding service. The work affects wireless workstations and video conferences. Which test result most directly confirms the required behavior?
Explanation
Correct Answer
This observation tests the Zero-touch provisioning and initial management requirement at a design studio in Berlin. The expected result is that the device acquires the expected bootstrap configuration and checks in to the authorized management system without a manual rescue. The necessary correction is to validate supported DHCP/ZTP provisioning information and management reachability, then apply the intended software and site template; a saved configuration alone would not prove it is working. In this case, the observed fault is that the uplink is active yet the management VRF has no route to the onboarding service.
Incorrect Answers
At a design studio in Berlin, this measures a different network requirement, Campus uplinks, link speed and optics validation. The case describes that the uplink is active yet the management VRF has no route to the onboarding service, so accepting this result would leave the primary fault without direct verification.
At a design studio in Berlin, the observation may be useful for a separate PoE budgets and AP or phone edge connectivity test, but it does not establish that the uplink is active yet the management VRF has no route to the onboarding service has been resolved. The relevant check is the Zero-touch provisioning and initial management outcome.
At a design studio in Berlin, this measures a different network requirement, Aruba Central inventory and device onboarding. The case describes that the uplink is active yet the management VRF has no route to the onboarding service, so accepting this result would leave the primary fault without direct verification.