Question 580
At Eastgate Packaging, an OT security team is reviewing Fortinet-protected operational technology networks during a production-line acceptance test. The issue observed is that a contractor service is published from the internet directly to a PLC maintenance port through a broad VIP. The correction must preserve plant owner signoff and change rollback evidence. What preventive check belongs in the next OT change approval?
Explanation
Correct Answer
Once the immediate issue is corrected, the ongoing safeguard is to audit public VIP and destination NAT rules for unauthorized industrial device exposures. This control is warranted because external publication bypasses the intended authenticated jump and OT zone boundary. At Eastgate Packaging, it can be checked by confirming that an external connection to the PLC service is blocked while the approved authenticated maintenance route works.
Incorrect Answers
That review targets a separate issue (North-south inspection misses lateral movement), where only the site perimeter is enforced, leaving unwanted lateral flows within the same control trust zone. At Eastgate Packaging, the relevant risk is that external publication bypasses the intended authenticated jump and OT zone boundary. The stated control does not address that recurring failure; audit public VIP and destination NAT rules for unauthorized industrial device exposures.
That practice applies to Industrial multicast control traffic drop, where protocol delivery and forwarding requirements were not captured in the pre-deployment traffic baseline. At Eastgate Packaging, the relevant risk is that external publication bypasses the intended authenticated jump and OT zone boundary. The stated control does not address that recurring failure; audit public VIP and destination NAT rules for unauthorized industrial device exposures.
The proposed control addresses FAZ quarantine automation with unverified identity, where unqualified automated response may isolate a misattributed or safety-critical OT device. At Eastgate Packaging, the relevant risk is that external publication bypasses the intended authenticated jump and OT zone boundary. The stated control does not address that recurring failure; audit public VIP and destination NAT rules for unauthorized industrial device exposures.