Question 260
At Evergreen Industrial, an OT security team is reviewing Fortinet-protected operational technology networks during an industrial site network upgrade. The issue observed is that a contractor laptop connected to an access switch gains unrestricted historian and PLC communication without inventory review. The correction must preserve established OT segmentation and telemetry requirements. What preventive check belongs in the next OT change approval?
Explanation
Correct Answer
Once the immediate issue is corrected, the ongoing safeguard is to compare switchport events with approved contractor work orders during routine reviews. This control is warranted because admission is not tied to a device classification or approved remediation state. At Evergreen Industrial, it can be checked by confirming that the contractor device is held in a controlled segment while approved plant workstations retain necessary access.
Incorrect Answers
That review targets a separate issue (802.1X compatibility on legacy PLC), where enterprise authentication methods cannot be assumed to operate on legacy OT endpoints. At Evergreen Industrial, the relevant risk is that admission is not tied to a device classification or approved remediation state. The stated control does not address that recurring failure; compare switchport events with approved contractor work orders during routine reviews.
That practice applies to MAC authorization mistaken for strong identity, where layer-two address claims are insufficient as proof of a trustworthy human or device identity. At Evergreen Industrial, the relevant risk is that admission is not tied to a device classification or approved remediation state. The stated control does not address that recurring failure; compare switchport events with approved contractor work orders during routine reviews.
The proposed control addresses FortiNAC classification timing during device restart, where admission state changes occur before device classification and plant-approved recovery workflows complete. At Evergreen Industrial, the relevant risk is that admission is not tied to a device classification or approved remediation state. The stated control does not address that recurring failure; compare switchport events with approved contractor work orders during routine reviews.