Question 160
During a multi-site Security Fabric rollout at Eastgate Packaging, an OT security engineer is rechecking the Fortinet-protected operational technology networks design. The issue observed is that a design labels all 10.x addresses as control network devices regardless of service or deployment zone. The correction must preserve plant owner signoff and change rollback evidence. Which review requirement would reduce recurrence of the observed condition?
Explanation
Correct Answer
To prevent recurrence at Eastgate Packaging, require topology and business-function evidence for every zoning exception. This control is warranted because address blocks cannot independently prove Purdue functional level or trust boundary. At Eastgate Packaging, it can be checked by confirming that an engineering workstation and enterprise server with similar addresses receive role-appropriate zone labels.
Incorrect Answers
This could be useful when reviewing OT security fabric segmentation map drift, where the displayed network diagram may not include current physical and logical forwarding changes. At Eastgate Packaging, the relevant risk is that address blocks cannot independently prove Purdue functional level or trust boundary. The stated control does not address that recurring failure; require topology and business-function evidence for every zoning exception.
That review targets a separate issue (OT asset decommission not reconciled), where asset inventory retirement and SIEM data-retention processes are not synchronized. At Eastgate Packaging, the relevant risk is that address blocks cannot independently prove Purdue functional level or trust boundary. The stated control does not address that recurring failure; require topology and business-function evidence for every zoning exception.
The proposed control addresses FortiNAC manual classification override, where unreviewed manual classifications can bypass the approval and inventory-quality safeguards. At Eastgate Packaging, the relevant risk is that address blocks cannot independently prove Purdue functional level or trust boundary. The stated control does not address that recurring failure; require topology and business-function evidence for every zoning exception.