McAfee-Secured Website

Exam Code: NSE5_FSW_AD-7.6

Exam Name: Fortinet NSE 5 - FortiSwitch 7.6 Administrator

Certification Provider: Fortinet

Corresponding Certification: NSE5

100% Fortinet NSE5_FSW_AD-7.6 Guaranteed Success With Testking Training Materials

Get Real NSE5_FSW_AD-7.6 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

64 Questions & Answers with Testing Engine

"Fortinet NSE 5 - FortiSwitch 7.6 Administrator Exam", also known as NSE5_FSW_AD-7.6 exam, is a Fortinet certification exam.

Pass your tests with the always up-to-date NSE5_FSW_AD-7.6 Exam Engine. Your NSE5_FSW_AD-7.6 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Fortinet NSE5_FSW_AD-7.6 Practice Test 28

Question 270

At Brookside Manufacturing, the plant operations team is planning an industrial Ethernet modernization under a requirement for planned downtime and resilient cabling. Following a proposed correction, the change manager requires evidence for this original fault: A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. Which observation BEST demonstrates that the fix worked?

  1. Root and designated-port states match the approved topology with no unstable reconvergence.
  2. STP operational output shows the approved root port and traffic follows the planned redundant path.
  3. The test rogue bridge triggers the approved edge protection without changing the legitimate STP root.
  4. The FortiSwitch topology retains its designated root and forwards through the approved stable paths.

Explanation

Correct Answer

B:

STP operational output shows the approved root port and traffic follows the planned redundant path. This observation verifies the specific reported problem, A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. The intended correction was: Audit STP path cost and priority across the intended topology rather than swapping cable positions blindly. It provides a directly testable outcome for the Brookside Manufacturing environment rather than treating a completed change ticket as proof.

Incorrect Answers

A:

Root and designated-port states match the approved topology with no unstable reconvergence. For Brookside Manufacturing, that measurement would support a separate technical case: A newly connected access switch becomes spanning-tree root and traffic begins traversing a low-bandwidth closet. Its corresponding remedy is: Set appropriate bridge priorities for the intended STP root and verify the region and topology. The reported Brookside Manufacturing condition is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. So the required outcome is: STP operational output shows the approved root port and traffic follows the planned redundant path.

C:

The test rogue bridge triggers the approved edge protection without changing the legitimate STP root. For Brookside Manufacturing, that measurement would support a separate technical case: A user-facing switch port repeatedly receives BPDUs from an unauthorized bridge connected under a desk. Its corresponding remedy is: Apply edge-port BPDU protection according to the endpoint access policy rather than allowing rogue root claims. The reported Brookside Manufacturing condition is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. So the required outcome is: STP operational output shows the approved root port and traffic follows the planned redundant path.

D:

The FortiSwitch topology retains its designated root and forwards through the approved stable paths. For Brookside Manufacturing, that measurement would support a separate technical case: The FortiLink topology joins another unmanaged switching domain that advertises an unexpected STP root. Its corresponding remedy is: Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment. The reported Brookside Manufacturing condition is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. So the required outcome is: STP operational output shows the approved root port and traffic follows the planned redundant path.

Question 271

At Juniper Media, the production networking team is planning a studio distribution refresh under a requirement for low-jitter live media transport. The implementation review detects: A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. Which corrective action BEST addresses the documented issue?

  1. Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment.
  2. Set appropriate bridge priorities for the intended STP root and verify the region and topology.
  3. Audit STP path cost and priority across the intended topology rather than swapping cable positions blindly.
  4. Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings.

Explanation

Correct Answer

C:

Audit STP path cost and priority across the intended topology rather than swapping cable positions blindly. The observed condition specifically concerns A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. In Juniper Media this action directly changes the relevant FortiSwitch configuration or topology instead of a nearby but unrelated control. The necessary acceptance test is: STP operational output shows the approved root port and traffic follows the planned redundant path.

Incorrect Answers

A:

Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment. In the Juniper Media scenario, this addresses a different network condition: The FortiLink topology joins another unmanaged switching domain that advertises an unexpected STP root. Here the observed issue is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. The proposed action does not establish the needed correction; evidence must instead show: STP operational output shows the approved root port and traffic follows the planned redundant path.

B:

Set appropriate bridge priorities for the intended STP root and verify the region and topology. In the Juniper Media scenario, this addresses a different network condition: A newly connected access switch becomes spanning-tree root and traffic begins traversing a low-bandwidth closet. Here the observed issue is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. The proposed action does not establish the needed correction; evidence must instead show: STP operational output shows the approved root port and traffic follows the planned redundant path.

D:

Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings. In the Juniper Media scenario, this addresses a different network condition: A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. Here the observed issue is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. The proposed action does not establish the needed correction; evidence must instead show: STP operational output shows the approved root port and traffic follows the planned redundant path.

Question 272

At Juniper Media, the production networking team is planning a studio distribution refresh under a requirement for low-jitter live media transport. After the switch change, operators must prove that they resolved: A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. Which observation BEST demonstrates that the fix worked?

  1. A normal workstation comes online promptly while a connected unauthorized switch still triggers protection.
  2. STP operational output shows the approved root port and traffic follows the planned redundant path.
  3. The FortiSwitch topology retains its designated root and forwards through the approved stable paths.
  4. Root and designated-port states match the approved topology with no unstable reconvergence.

Explanation

Correct Answer

B:

STP operational output shows the approved root port and traffic follows the planned redundant path. This observation verifies the specific reported problem, A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. The intended correction was: Audit STP path cost and priority across the intended topology rather than swapping cable positions blindly. It provides a directly testable outcome for the Juniper Media environment rather than treating a completed change ticket as proof.

Incorrect Answers

A:

A normal workstation comes online promptly while a connected unauthorized switch still triggers protection. For Juniper Media, that measurement would support a separate technical case: A FortiSwitch access port waits for normal bridge convergence on every ordinary endpoint link-up. Its corresponding remedy is: Use a supported edge-port setting where no downstream bridge is expected and keep protection against unexpected BPDUs. The reported Juniper Media condition is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. So the required outcome is: STP operational output shows the approved root port and traffic follows the planned redundant path.

C:

The FortiSwitch topology retains its designated root and forwards through the approved stable paths. For Juniper Media, that measurement would support a separate technical case: The FortiLink topology joins another unmanaged switching domain that advertises an unexpected STP root. Its corresponding remedy is: Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment. The reported Juniper Media condition is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. So the required outcome is: STP operational output shows the approved root port and traffic follows the planned redundant path.

D:

Root and designated-port states match the approved topology with no unstable reconvergence. For Juniper Media, that measurement would support a separate technical case: A newly connected access switch becomes spanning-tree root and traffic begins traversing a low-bandwidth closet. Its corresponding remedy is: Set appropriate bridge priorities for the intended STP root and verify the region and topology. The reported Juniper Media condition is A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. So the required outcome is: STP operational output shows the approved root port and traffic follows the planned redundant path.

Question 273

At Highland Education, the campus architecture team is planning a residential access-layer rollout under a requirement for accessible management and minimized downtime. The network team observes: A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. Which corrective action BEST addresses the documented issue?

  1. Inspect STP role and state before changing a blocked port and retain the loop-safe alternate path.
  2. Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities.
  3. Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment.
  4. Apply edge-port BPDU protection according to the endpoint access policy rather than allowing rogue root claims.

Explanation

Correct Answer

B:

Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities. The observed condition specifically concerns A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. In Highland Education this action directly changes the relevant FortiSwitch configuration or topology instead of a nearby but unrelated control. The necessary acceptance test is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

Incorrect Answers

A:

Inspect STP role and state before changing a blocked port and retain the loop-safe alternate path. In the Highland Education scenario, this addresses a different network condition: A properly blocked redundant STP port is incorrectly declared faulty and manually forced into forwarding state. Here the observed issue is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The proposed action does not establish the needed correction; evidence must instead show: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

C:

Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment. In the Highland Education scenario, this addresses a different network condition: The FortiLink topology joins another unmanaged switching domain that advertises an unexpected STP root. Here the observed issue is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The proposed action does not establish the needed correction; evidence must instead show: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

D:

Apply edge-port BPDU protection according to the endpoint access policy rather than allowing rogue root claims. In the Highland Education scenario, this addresses a different network condition: A user-facing switch port repeatedly receives BPDUs from an unauthorized bridge connected under a desk. Here the observed issue is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The proposed action does not establish the needed correction; evidence must instead show: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

Question 274

At Highland Education, the campus architecture team is planning a residential access-layer rollout under a requirement for accessible management and minimized downtime. Following a proposed correction, the change manager requires evidence for this original fault: A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. Which observation BEST demonstrates that the fix worked?

  1. Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.
  2. Root and designated-port states match the approved topology with no unstable reconvergence.
  3. The link transitions appropriately on primary-link failure without introducing a broadcast loop.
  4. MAC-flap and broadcast counters normalize while a single loop-free path remains available.

Explanation

Correct Answer

A:

Endpoints regain the intended redundant path and protocol state returns to a loop-free topology. This observation verifies the specific reported problem, A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The intended correction was: Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities. It provides a directly testable outcome for the Highland Education environment rather than treating a completed change ticket as proof.

Incorrect Answers

B:

Root and designated-port states match the approved topology with no unstable reconvergence. For Highland Education, that measurement would support a separate technical case: A newly connected access switch becomes spanning-tree root and traffic begins traversing a low-bandwidth closet. Its corresponding remedy is: Set appropriate bridge priorities for the intended STP root and verify the region and topology. The reported Highland Education condition is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. So the required outcome is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

C:

The link transitions appropriately on primary-link failure without introducing a broadcast loop. For Highland Education, that measurement would support a separate technical case: A properly blocked redundant STP port is incorrectly declared faulty and manually forced into forwarding state. Its corresponding remedy is: Inspect STP role and state before changing a blocked port and retain the loop-safe alternate path. The reported Highland Education condition is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. So the required outcome is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

D:

MAC-flap and broadcast counters normalize while a single loop-free path remains available. For Highland Education, that measurement would support a separate technical case: A redundant connection causes repeated broadcast storms because both ports forward in a physical loop. Its corresponding remedy is: Enable and validate an appropriate supported spanning-tree mode and compatible loop protections. The reported Highland Education condition is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. So the required outcome is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

Question 275

At Eastshore Energy, the remote site communications team is planning a field facility commissioning under a requirement for remote management during a control-link outage. The implementation review detects: A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. Which corrective action BEST addresses the documented issue?

  1. Use a supported edge-port setting where no downstream bridge is expected and keep protection against unexpected BPDUs.
  2. Set appropriate bridge priorities for the intended STP root and verify the region and topology.
  3. Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities.
  4. Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings.

Explanation

Correct Answer

C:

Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities. The observed condition specifically concerns A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. In Eastshore Energy this action directly changes the relevant FortiSwitch configuration or topology instead of a nearby but unrelated control. The necessary acceptance test is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

Incorrect Answers

A:

Use a supported edge-port setting where no downstream bridge is expected and keep protection against unexpected BPDUs. In the Eastshore Energy scenario, this addresses a different network condition: A FortiSwitch access port waits for normal bridge convergence on every ordinary endpoint link-up. Here the observed issue is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The proposed action does not establish the needed correction; evidence must instead show: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

B:

Set appropriate bridge priorities for the intended STP root and verify the region and topology. In the Eastshore Energy scenario, this addresses a different network condition: A newly connected access switch becomes spanning-tree root and traffic begins traversing a low-bandwidth closet. Here the observed issue is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The proposed action does not establish the needed correction; evidence must instead show: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

D:

Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings. In the Eastshore Energy scenario, this addresses a different network condition: A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. Here the observed issue is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The proposed action does not establish the needed correction; evidence must instead show: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

Question 276

At Eastshore Energy, the remote site communications team is planning a field facility commissioning under a requirement for remote management during a control-link outage. After the switch change, operators must prove that they resolved: A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. Which observation BEST demonstrates that the fix worked?

  1. Operational MSTP status shows the intended region identity and stable root per mapped instance.
  2. A normal workstation comes online promptly while a connected unauthorized switch still triggers protection.
  3. The FortiSwitch topology retains its designated root and forwards through the approved stable paths.
  4. Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

Explanation

Correct Answer

D:

Endpoints regain the intended redundant path and protocol state returns to a loop-free topology. This observation verifies the specific reported problem, A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. The intended correction was: Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities. It provides a directly testable outcome for the Eastshore Energy environment rather than treating a completed change ticket as proof.

Incorrect Answers

A:

Operational MSTP status shows the intended region identity and stable root per mapped instance. For Eastshore Energy, that measurement would support a separate technical case: Two switches use incompatible MSTP region names or VLAN-instance mappings and form unexpected boundaries. Its corresponding remedy is: Align the authorized MSTP region configuration or explicitly design the boundary as separate regions. The reported Eastshore Energy condition is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. So the required outcome is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

B:

A normal workstation comes online promptly while a connected unauthorized switch still triggers protection. For Eastshore Energy, that measurement would support a separate technical case: A FortiSwitch access port waits for normal bridge convergence on every ordinary endpoint link-up. Its corresponding remedy is: Use a supported edge-port setting where no downstream bridge is expected and keep protection against unexpected BPDUs. The reported Eastshore Energy condition is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. So the required outcome is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

C:

The FortiSwitch topology retains its designated root and forwards through the approved stable paths. For Eastshore Energy, that measurement would support a separate technical case: The FortiLink topology joins another unmanaged switching domain that advertises an unexpected STP root. Its corresponding remedy is: Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment. The reported Eastshore Energy condition is A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. So the required outcome is: Endpoints regain the intended redundant path and protocol state returns to a loop-free topology.

Question 277

At Maplewood Schools, the district connectivity team is planning a classroom network replacement under a requirement for steady classroom Wi-Fi and VoIP. The network team observes: A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. Which corrective action BEST addresses the documented issue?

  1. Inspect STP role and state before changing a blocked port and retain the loop-safe alternate path.
  2. Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings.
  3. Align the authorized MSTP region configuration or explicitly design the boundary as separate regions.
  4. Enable and validate an appropriate supported spanning-tree mode and compatible loop protections.

Explanation

Correct Answer

B:

Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings. The observed condition specifically concerns A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. In Maplewood Schools this action directly changes the relevant FortiSwitch configuration or topology instead of a nearby but unrelated control. The necessary acceptance test is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

Incorrect Answers

A:

Inspect STP role and state before changing a blocked port and retain the loop-safe alternate path. In the Maplewood Schools scenario, this addresses a different network condition: A properly blocked redundant STP port is incorrectly declared faulty and manually forced into forwarding state. Here the observed issue is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The proposed action does not establish the needed correction; evidence must instead show: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

C:

Align the authorized MSTP region configuration or explicitly design the boundary as separate regions. In the Maplewood Schools scenario, this addresses a different network condition: Two switches use incompatible MSTP region names or VLAN-instance mappings and form unexpected boundaries. Here the observed issue is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The proposed action does not establish the needed correction; evidence must instead show: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

D:

Enable and validate an appropriate supported spanning-tree mode and compatible loop protections. In the Maplewood Schools scenario, this addresses a different network condition: A redundant connection causes repeated broadcast storms because both ports forward in a physical loop. Here the observed issue is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The proposed action does not establish the needed correction; evidence must instead show: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

Question 278

At Maplewood Schools, the district connectivity team is planning a classroom network replacement under a requirement for steady classroom Wi-Fi and VoIP. Following a proposed correction, the change manager requires evidence for this original fault: A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. Which observation BEST demonstrates that the fix worked?

  1. MAC-flap and broadcast counters normalize while a single loop-free path remains available.
  2. The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.
  3. The FortiSwitch topology retains its designated root and forwards through the approved stable paths.
  4. The link transitions appropriately on primary-link failure without introducing a broadcast loop.

Explanation

Correct Answer

B:

The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan. This observation verifies the specific reported problem, A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The intended correction was: Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings. It provides a directly testable outcome for the Maplewood Schools environment rather than treating a completed change ticket as proof.

Incorrect Answers

A:

MAC-flap and broadcast counters normalize while a single loop-free path remains available. For Maplewood Schools, that measurement would support a separate technical case: A redundant connection causes repeated broadcast storms because both ports forward in a physical loop. Its corresponding remedy is: Enable and validate an appropriate supported spanning-tree mode and compatible loop protections. The reported Maplewood Schools condition is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. So the required outcome is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

C:

The FortiSwitch topology retains its designated root and forwards through the approved stable paths. For Maplewood Schools, that measurement would support a separate technical case: The FortiLink topology joins another unmanaged switching domain that advertises an unexpected STP root. Its corresponding remedy is: Define controlled spanning-tree boundaries and root protection compatible with the supported FortiLink deployment. The reported Maplewood Schools condition is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. So the required outcome is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

D:

The link transitions appropriately on primary-link failure without introducing a broadcast loop. For Maplewood Schools, that measurement would support a separate technical case: A properly blocked redundant STP port is incorrectly declared faulty and manually forced into forwarding state. Its corresponding remedy is: Inspect STP role and state before changing a blocked port and retain the loop-safe alternate path. The reported Maplewood Schools condition is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. So the required outcome is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

Question 279

At Brookside Manufacturing, the plant operations team is planning an industrial Ethernet modernization under a requirement for planned downtime and resilient cabling. The implementation review detects: A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. Which corrective action BEST addresses the documented issue?

  1. Use a supported edge-port setting where no downstream bridge is expected and keep protection against unexpected BPDUs.
  2. Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities.
  3. Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings.
  4. Set appropriate bridge priorities for the intended STP root and verify the region and topology.

Explanation

Correct Answer

C:

Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings. The observed condition specifically concerns A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. In Brookside Manufacturing this action directly changes the relevant FortiSwitch configuration or topology instead of a nearby but unrelated control. The necessary acceptance test is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

Incorrect Answers

A:

Use a supported edge-port setting where no downstream bridge is expected and keep protection against unexpected BPDUs. In the Brookside Manufacturing scenario, this addresses a different network condition: A FortiSwitch access port waits for normal bridge convergence on every ordinary endpoint link-up. Here the observed issue is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The proposed action does not establish the needed correction; evidence must instead show: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

B:

Rehearse the expected port-state transitions under the supported STP redundancy design and repair incorrect priorities. In the Brookside Manufacturing scenario, this addresses a different network condition: A spanning-tree topology appears stable but fails to recover after one distribution switch loses power. Here the observed issue is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The proposed action does not establish the needed correction; evidence must instead show: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

D:

Set appropriate bridge priorities for the intended STP root and verify the region and topology. In the Brookside Manufacturing scenario, this addresses a different network condition: A newly connected access switch becomes spanning-tree root and traffic begins traversing a low-bandwidth closet. Here the observed issue is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The proposed action does not establish the needed correction; evidence must instead show: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

Question 280

At Brookside Manufacturing, the plant operations team is planning an industrial Ethernet modernization under a requirement for planned downtime and resilient cabling. After the switch change, operators must prove that they resolved: A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. Which observation BEST demonstrates that the fix worked?

  1. The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.
  2. A link failure converges within the target and no persistent Layer 2 loop appears.
  3. STP operational output shows the approved root port and traffic follows the planned redundant path.
  4. MAC-flap and broadcast counters normalize while a single loop-free path remains available.

Explanation

Correct Answer

A:

The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan. This observation verifies the specific reported problem, A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. The intended correction was: Map the appropriate VLAN groups to intended MSTP instances and confirm compatible regional settings. It provides a directly testable outcome for the Brookside Manufacturing environment rather than treating a completed change ticket as proof.

Incorrect Answers

B:

A link failure converges within the target and no persistent Layer 2 loop appears. For Brookside Manufacturing, that measurement would support a separate technical case: An engineer disables STP on an inter-switch connection to lower convergence time without checking the redundant path. Its corresponding remedy is: Use supported rapid spanning-tree behavior or a validated loop-free routed design instead of blind disabling. The reported Brookside Manufacturing condition is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. So the required outcome is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

C:

STP operational output shows the approved root port and traffic follows the planned redundant path. For Brookside Manufacturing, that measurement would support a separate technical case: A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. Its corresponding remedy is: Audit STP path cost and priority across the intended topology rather than swapping cable positions blindly. The reported Brookside Manufacturing condition is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. So the required outcome is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

D:

MAC-flap and broadcast counters normalize while a single loop-free path remains available. For Brookside Manufacturing, that measurement would support a separate technical case: A redundant connection causes repeated broadcast storms because both ports forward in a physical loop. Its corresponding remedy is: Enable and validate an appropriate supported spanning-tree mode and compatible loop protections. The reported Brookside Manufacturing condition is A team configures MSTP instances but assumes each VLAN automatically inherits a unique tree without explicit mapping. So the required outcome is: The runtime instance-to-VLAN map and bridge states match the approved traffic-engineering plan.

Fortinet NSE 5 - FortiSwitch 7.6 Administrator (NSE5_FSW_AD-7.6) Practice Tests