Question 260
At Timberline Foods, the supply-chain network operations team is planning a processing-plant network review under a requirement for production-line reliability. After the switch change, operators must prove that they resolved: An engineer disables STP on an inter-switch connection to lower convergence time without checking the redundant path. Which observation BEST demonstrates that the fix worked?
Explanation
Correct Answer
A link failure converges within the target and no persistent Layer 2 loop appears. This observation verifies the specific reported problem, An engineer disables STP on an inter-switch connection to lower convergence time without checking the redundant path. The intended correction was: Use supported rapid spanning-tree behavior or a validated loop-free routed design instead of blind disabling. It provides a directly testable outcome for the Timberline Foods environment rather than treating a completed change ticket as proof.
Incorrect Answers
STP operational output shows the approved root port and traffic follows the planned redundant path. For Timberline Foods, that measurement would support a separate technical case: A new parallel link changes root-port selection and leaves one distribution path unexpectedly oversubscribed. Its corresponding remedy is: Audit STP path cost and priority across the intended topology rather than swapping cable positions blindly. The reported Timberline Foods condition is An engineer disables STP on an inter-switch connection to lower convergence time without checking the redundant path. So the required outcome is: A link failure converges within the target and no persistent Layer 2 loop appears.
The test rogue bridge triggers the approved edge protection without changing the legitimate STP root. For Timberline Foods, that measurement would support a separate technical case: A user-facing switch port repeatedly receives BPDUs from an unauthorized bridge connected under a desk. Its corresponding remedy is: Apply edge-port BPDU protection according to the endpoint access policy rather than allowing rogue root claims. The reported Timberline Foods condition is An engineer disables STP on an inter-switch connection to lower convergence time without checking the redundant path. So the required outcome is: A link failure converges within the target and no persistent Layer 2 loop appears.
MAC-flap and broadcast counters normalize while a single loop-free path remains available. For Timberline Foods, that measurement would support a separate technical case: A redundant connection causes repeated broadcast storms because both ports forward in a physical loop. Its corresponding remedy is: Enable and validate an appropriate supported spanning-tree mode and compatible loop protections. The reported Timberline Foods condition is An engineer disables STP on an inter-switch connection to lower convergence time without checking the redundant path. So the required outcome is: A link failure converges within the target and no persistent Layer 2 loop appears.