McAfee-Secured Website

Exam Bundle

Exam Code: PK0-005

Exam Name CompTIA Project+

Certification Provider: CompTIA

Corresponding Certification: CompTIA Project+

CompTIA PK0-005 Bundle $44.99

100% CompTIA PK0-005 Guaranteed Success With Testking Training Materials

Get Real PK0-005 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    PK0-005 Questions & Answers

    628 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual PK0-005 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • PK0-005 Video Course

    PK0-005 Video Course

    159 Video Lectures

    PK0-005 Video Course is developed by CompTIA Professionals to help you pass the PK0-005 exam.

    Description

    This course will improve your knowledge and skills required to pass CompTIA Project+ exam.
  • Study Guide

    PK0-005 Study Guide

    682 PDF Pages

    Developed by industry experts, this 682-page guide spells out in painstaking detail all of the information you need to ace PK0-005 exam.

CompTIA Project+ (PK0-005) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    628 Questions

    $124.99
  • PK0-005 Video Course

    Video Course

    159 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    682 PDF Pages

    $29.99

CompTIA PK0-005 Practice Test 98

Question 970

Sandstone Publishing is delivering an IT initiative involving editorial documents and partner applications subject to a limited implementation budget. The team observes: The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The forecast uses the team's measured trend rather than treating cross-team points as equivalent.
  2. The review identifies signals outside expected limits instead of reacting to normal noise.
  3. The estimate and assumptions can be independently recomputed from the three inputs.
  4. The chart reveals dominant categories and enables a focused improvement decision.

Explanation

Correct Answer

C:

The estimate and assumptions can be independently recomputed from the three inputs. This is the relevant acceptance evidence because it tests whether the corrective action (Use three-point PERT reasoning to calculate and communicate a weighted expected duration.) fixed the original concern (The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility.) at Sandstone Publishing, rather than relying only on a task marked complete. The affected work concerns editorial documents and partner applications.

Incorrect Answers

A:

The forecast uses the team's measured trend rather than treating cross-team points as equivalent. This evidence would be useful for another condition (The Scrum team cannot judge delivery capacity because it compares different story-point definitions from unrelated teams.) and its different action (Track velocity within the same stable team and estimation approach across iterations.). At Sandstone Publishing, it does not demonstrate the required project outcome: The estimate and assumptions can be independently recomputed from the three inputs.

B:

The review identifies signals outside expected limits instead of reacting to normal noise. This evidence would be useful for another condition (Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency.) and its different action (Use a control chart with appropriately derived control limits to distinguish exceptional variation.). At Sandstone Publishing, it does not demonstrate the required project outcome: The estimate and assumptions can be independently recomputed from the three inputs.

D:

The chart reveals dominant categories and enables a focused improvement decision. This evidence would be useful for another condition (A release has many defect categories and the quality lead cannot tell which few causes produce most rework.) and its different action (Use a Pareto chart to rank defect categories by frequency or impact.). At Sandstone Publishing, it does not demonstrate the required project outcome: The estimate and assumptions can be independently recomputed from the three inputs.

Question 971

For Copper Hill Studios, the project steering committee reports the following delivery problem: The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility. Which project management action BEST addresses the particular issue?

  1. Use a Pareto chart to rank defect categories by frequency or impact.
  2. Use a control chart with appropriately derived control limits to distinguish exceptional variation.
  3. Track velocity within the same stable team and estimation approach across iterations.
  4. Use three-point PERT reasoning to calculate and communicate a weighted expected duration.

Explanation

Correct Answer

D:

Use three-point PERT reasoning to calculate and communicate a weighted expected duration. This directly addresses the reported management gap: The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility. For Copper Hill Studios and its media assets and freelancer collaboration, a useful verification outcome is: The estimate and assumptions can be independently recomputed from the three inputs.

Incorrect Answers

A:

Use a Pareto chart to rank defect categories by frequency or impact. This choice addresses another specific project condition: A release has many defect categories and the quality lead cannot tell which few causes produce most rework. The actual issue at Copper Hill Studios is: The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility. That other intervention does not itself establish the required result: The estimate and assumptions can be independently recomputed from the three inputs.

B:

Use a control chart with appropriately derived control limits to distinguish exceptional variation. This choice addresses another specific project condition: Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency. The actual issue at Copper Hill Studios is: The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility. That other intervention does not itself establish the required result: The estimate and assumptions can be independently recomputed from the three inputs.

C:

Track velocity within the same stable team and estimation approach across iterations. This choice addresses another specific project condition: The Scrum team cannot judge delivery capacity because it compares different story-point definitions from unrelated teams. The actual issue at Copper Hill Studios is: The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility. That other intervention does not itself establish the required result: The estimate and assumptions can be independently recomputed from the three inputs.

Question 972

For Copper Hill Studios, the project steering committee reports the following delivery problem: The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The forecast uses the team's measured trend rather than treating cross-team points as equivalent.
  2. The review identifies signals outside expected limits instead of reacting to normal noise.
  3. The chart reveals dominant categories and enables a focused improvement decision.
  4. The estimate and assumptions can be independently recomputed from the three inputs.

Explanation

Correct Answer

D:

The estimate and assumptions can be independently recomputed from the three inputs. This is the relevant acceptance evidence because it tests whether the corrective action (Use three-point PERT reasoning to calculate and communicate a weighted expected duration.) fixed the original concern (The sponsor asks how many days a project will take but the estimate has best likely and worst cases with unequal plausibility.) at Copper Hill Studios, rather than relying only on a task marked complete. The affected work concerns media assets and freelancer collaboration.

Incorrect Answers

A:

The forecast uses the team's measured trend rather than treating cross-team points as equivalent. This evidence would be useful for another condition (The Scrum team cannot judge delivery capacity because it compares different story-point definitions from unrelated teams.) and its different action (Track velocity within the same stable team and estimation approach across iterations.). At Copper Hill Studios, it does not demonstrate the required project outcome: The estimate and assumptions can be independently recomputed from the three inputs.

B:

The review identifies signals outside expected limits instead of reacting to normal noise. This evidence would be useful for another condition (Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency.) and its different action (Use a control chart with appropriately derived control limits to distinguish exceptional variation.). At Copper Hill Studios, it does not demonstrate the required project outcome: The estimate and assumptions can be independently recomputed from the three inputs.

C:

The chart reveals dominant categories and enables a focused improvement decision. This evidence would be useful for another condition (A release has many defect categories and the quality lead cannot tell which few causes produce most rework.) and its different action (Use a Pareto chart to rank defect categories by frequency or impact.). At Copper Hill Studios, it does not demonstrate the required project outcome: The estimate and assumptions can be independently recomputed from the three inputs.

Question 973

For Marshfield Bank, the project steering committee reports the following delivery problem: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. Which project management action BEST addresses the particular issue?

  1. Use a control chart with appropriately derived control limits to distinguish exceptional variation.
  2. Use a Pareto chart to rank defect categories by frequency or impact.
  3. Plot performance measures in time order using a run chart.
  4. Construct a decision tree with outcome probabilities and relevant cost or value consequences.

Explanation

Correct Answer

D:

Construct a decision tree with outcome probabilities and relevant cost or value consequences. This directly addresses the reported management gap: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. For Marshfield Bank and its payments and confidential client information, a useful verification outcome is: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Incorrect Answers

A:

Use a control chart with appropriately derived control limits to distinguish exceptional variation. This choice addresses another specific project condition: Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency. The actual issue at Marshfield Bank is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

B:

Use a Pareto chart to rank defect categories by frequency or impact. This choice addresses another specific project condition: A release has many defect categories and the quality lead cannot tell which few causes produce most rework. The actual issue at Marshfield Bank is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

C:

Plot performance measures in time order using a run chart. This choice addresses another specific project condition: The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend. The actual issue at Marshfield Bank is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Question 974

For Marshfield Bank, the project steering committee reports the following delivery problem: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The chart reveals dominant categories and enables a focused improvement decision.
  2. The review identifies signals outside expected limits instead of reacting to normal noise.
  3. The preferred branch is justified by transparent expected-value calculations and risk assumptions.
  4. The chart shows the sustained rise and its timing relative to a process change.

Explanation

Correct Answer

C:

The preferred branch is justified by transparent expected-value calculations and risk assumptions. This is the relevant acceptance evidence because it tests whether the corrective action (Construct a decision tree with outcome probabilities and relevant cost or value consequences.) fixed the original concern (The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices.) at Marshfield Bank, rather than relying only on a task marked complete. The affected work concerns payments and confidential client information.

Incorrect Answers

A:

The chart reveals dominant categories and enables a focused improvement decision. This evidence would be useful for another condition (A release has many defect categories and the quality lead cannot tell which few causes produce most rework.) and its different action (Use a Pareto chart to rank defect categories by frequency or impact.). At Marshfield Bank, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

B:

The review identifies signals outside expected limits instead of reacting to normal noise. This evidence would be useful for another condition (Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency.) and its different action (Use a control chart with appropriately derived control limits to distinguish exceptional variation.). At Marshfield Bank, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

D:

The chart shows the sustained rise and its timing relative to a process change. This evidence would be useful for another condition (The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend.) and its different action (Plot performance measures in time order using a run chart.). At Marshfield Bank, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Question 975

At Lakeview Insurance, the delivery assessment finds: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. Which project management action BEST addresses the particular issue?

  1. Plot performance measures in time order using a run chart.
  2. Use a control chart with appropriately derived control limits to distinguish exceptional variation.
  3. Use a Pareto chart to rank defect categories by frequency or impact.
  4. Construct a decision tree with outcome probabilities and relevant cost or value consequences.

Explanation

Correct Answer

D:

Construct a decision tree with outcome probabilities and relevant cost or value consequences. This directly addresses the reported management gap: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. For Lakeview Insurance and its broker collaboration and claim applications, a useful verification outcome is: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Incorrect Answers

A:

Plot performance measures in time order using a run chart. This choice addresses another specific project condition: The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend. The actual issue at Lakeview Insurance is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

B:

Use a control chart with appropriately derived control limits to distinguish exceptional variation. This choice addresses another specific project condition: Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency. The actual issue at Lakeview Insurance is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

C:

Use a Pareto chart to rank defect categories by frequency or impact. This choice addresses another specific project condition: A release has many defect categories and the quality lead cannot tell which few causes produce most rework. The actual issue at Lakeview Insurance is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Question 976

At Lakeview Insurance, the delivery assessment finds: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The chart reveals dominant categories and enables a focused improvement decision.
  2. The preferred branch is justified by transparent expected-value calculations and risk assumptions.
  3. The review identifies signals outside expected limits instead of reacting to normal noise.
  4. The chart shows the sustained rise and its timing relative to a process change.

Explanation

Correct Answer

B:

The preferred branch is justified by transparent expected-value calculations and risk assumptions. This is the relevant acceptance evidence because it tests whether the corrective action (Construct a decision tree with outcome probabilities and relevant cost or value consequences.) fixed the original concern (The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices.) at Lakeview Insurance, rather than relying only on a task marked complete. The affected work concerns broker collaboration and claim applications.

Incorrect Answers

A:

The chart reveals dominant categories and enables a focused improvement decision. This evidence would be useful for another condition (A release has many defect categories and the quality lead cannot tell which few causes produce most rework.) and its different action (Use a Pareto chart to rank defect categories by frequency or impact.). At Lakeview Insurance, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

C:

The review identifies signals outside expected limits instead of reacting to normal noise. This evidence would be useful for another condition (Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency.) and its different action (Use a control chart with appropriately derived control limits to distinguish exceptional variation.). At Lakeview Insurance, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

D:

The chart shows the sustained rise and its timing relative to a process change. This evidence would be useful for another condition (The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend.) and its different action (Plot performance measures in time order using a run chart.). At Lakeview Insurance, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Question 977

Orion Network Services is delivering an IT initiative involving subscriber applications and remote operations under controlled release and records requirements. The team observes: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. Which project management action BEST addresses the particular issue?

  1. Use a control chart with appropriately derived control limits to distinguish exceptional variation.
  2. Plot performance measures in time order using a run chart.
  3. Construct a decision tree with outcome probabilities and relevant cost or value consequences.
  4. Use a Pareto chart to rank defect categories by frequency or impact.

Explanation

Correct Answer

C:

Construct a decision tree with outcome probabilities and relevant cost or value consequences. This directly addresses the reported management gap: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. For Orion Network Services and its subscriber applications and remote operations, a useful verification outcome is: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Incorrect Answers

A:

Use a control chart with appropriately derived control limits to distinguish exceptional variation. This choice addresses another specific project condition: Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency. The actual issue at Orion Network Services is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

B:

Plot performance measures in time order using a run chart. This choice addresses another specific project condition: The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend. The actual issue at Orion Network Services is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

D:

Use a Pareto chart to rank defect categories by frequency or impact. This choice addresses another specific project condition: A release has many defect categories and the quality lead cannot tell which few causes produce most rework. The actual issue at Orion Network Services is: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. That other intervention does not itself establish the required result: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Question 978

Orion Network Services is delivering an IT initiative involving subscriber applications and remote operations under controlled release and records requirements. The team observes: The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The chart reveals dominant categories and enables a focused improvement decision.
  2. The chart shows the sustained rise and its timing relative to a process change.
  3. The preferred branch is justified by transparent expected-value calculations and risk assumptions.
  4. The review identifies signals outside expected limits instead of reacting to normal noise.

Explanation

Correct Answer

C:

The preferred branch is justified by transparent expected-value calculations and risk assumptions. This is the relevant acceptance evidence because it tests whether the corrective action (Construct a decision tree with outcome probabilities and relevant cost or value consequences.) fixed the original concern (The project sponsor must choose between a higher-cost reliable vendor and a lower-cost risky option but sees only headline purchase prices.) at Orion Network Services, rather than relying only on a task marked complete. The affected work concerns subscriber applications and remote operations.

Incorrect Answers

A:

The chart reveals dominant categories and enables a focused improvement decision. This evidence would be useful for another condition (A release has many defect categories and the quality lead cannot tell which few causes produce most rework.) and its different action (Use a Pareto chart to rank defect categories by frequency or impact.). At Orion Network Services, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

B:

The chart shows the sustained rise and its timing relative to a process change. This evidence would be useful for another condition (The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend.) and its different action (Plot performance measures in time order using a run chart.). At Orion Network Services, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

D:

The review identifies signals outside expected limits instead of reacting to normal noise. This evidence would be useful for another condition (Quality measurements fluctuate within expected common-cause limits but managers treat every single data point as an emergency.) and its different action (Use a control chart with appropriately derived control limits to distinguish exceptional variation.). At Orion Network Services, it does not demonstrate the required project outcome: The preferred branch is justified by transparent expected-value calculations and risk assumptions.

Question 979

Evergreen Hospital is delivering an IT initiative involving care coordination and staff identity services with multiple distributed delivery teams. The team observes: An Agile team reports increasing task completion while its sprint still misses the commitment and cannot explain remaining work. Which project management action BEST addresses the particular issue?

  1. Use a burnup chart with a completed-work series and a total-scope series.
  2. Plot performance measures in time order using a run chart.
  3. Use a burndown chart with actual outstanding work versus the planned sprint trajectory.
  4. Use a Pareto chart to rank defect categories by frequency or impact.

Explanation

Correct Answer

C:

Use a burndown chart with actual outstanding work versus the planned sprint trajectory. This directly addresses the reported management gap: An Agile team reports increasing task completion while its sprint still misses the commitment and cannot explain remaining work. For Evergreen Hospital and its care coordination and staff identity services, a useful verification outcome is: The chart shows why remaining work exceeds the expected level before the sprint ends.

Incorrect Answers

A:

Use a burnup chart with a completed-work series and a total-scope series. This choice addresses another specific project condition: A product owner wants to display both rising delivered scope and new scope requests but a chart shows only remaining tasks. The actual issue at Evergreen Hospital is: An Agile team reports increasing task completion while its sprint still misses the commitment and cannot explain remaining work. That other intervention does not itself establish the required result: The chart shows why remaining work exceeds the expected level before the sprint ends.

B:

Plot performance measures in time order using a run chart. This choice addresses another specific project condition: The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend. The actual issue at Evergreen Hospital is: An Agile team reports increasing task completion while its sprint still misses the commitment and cannot explain remaining work. That other intervention does not itself establish the required result: The chart shows why remaining work exceeds the expected level before the sprint ends.

D:

Use a Pareto chart to rank defect categories by frequency or impact. This choice addresses another specific project condition: A release has many defect categories and the quality lead cannot tell which few causes produce most rework. The actual issue at Evergreen Hospital is: An Agile team reports increasing task completion while its sprint still misses the commitment and cannot explain remaining work. That other intervention does not itself establish the required result: The chart shows why remaining work exceeds the expected level before the sprint ends.

Question 980

Evergreen Hospital is delivering an IT initiative involving care coordination and staff identity services with multiple distributed delivery teams. The team observes: An Agile team reports increasing task completion while its sprint still misses the commitment and cannot explain remaining work. The team reports that it has taken corrective action. Which observation BEST verifies that the original issue is resolved?

  1. The chart reveals that completion progress coexists with newly added backlog scope.
  2. The chart reveals dominant categories and enables a focused improvement decision.
  3. The chart shows why remaining work exceeds the expected level before the sprint ends.
  4. The chart shows the sustained rise and its timing relative to a process change.

Explanation

Correct Answer

C:

The chart shows why remaining work exceeds the expected level before the sprint ends. This is the relevant acceptance evidence because it tests whether the corrective action (Use a burndown chart with actual outstanding work versus the planned sprint trajectory.) fixed the original concern (An Agile team reports increasing task completion while its sprint still misses the commitment and cannot explain remaining work.) at Evergreen Hospital, rather than relying only on a task marked complete. The affected work concerns care coordination and staff identity services.

Incorrect Answers

A:

The chart reveals that completion progress coexists with newly added backlog scope. This evidence would be useful for another condition (A product owner wants to display both rising delivered scope and new scope requests but a chart shows only remaining tasks.) and its different action (Use a burnup chart with a completed-work series and a total-scope series.). At Evergreen Hospital, it does not demonstrate the required project outcome: The chart shows why remaining work exceeds the expected level before the sprint ends.

B:

The chart reveals dominant categories and enables a focused improvement decision. This evidence would be useful for another condition (A release has many defect categories and the quality lead cannot tell which few causes produce most rework.) and its different action (Use a Pareto chart to rank defect categories by frequency or impact.). At Evergreen Hospital, it does not demonstrate the required project outcome: The chart shows why remaining work exceeds the expected level before the sprint ends.

D:

The chart shows the sustained rise and its timing relative to a process change. This evidence would be useful for another condition (The team sees cycle time rise over successive weeks but individual weekly reports conceal the trend.) and its different action (Plot performance measures in time order using a run chart.). At Evergreen Hospital, it does not demonstrate the required project outcome: The chart shows why remaining work exceeds the expected level before the sprint ends.