McAfee-Secured Website

Exam Bundle

Exam Code: 400-007

Exam Name Cisco Certified Design Expert

Certification Provider: Cisco

Corresponding Certification: CCDE

Cisco 400-007 Bundle $19.99

100% Cisco 400-007 Guaranteed Success With Testking Training Materials

Get Real 400-007 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    400-007 Questions & Answers

    349 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual 400-007 exam while allowing you to hone and measure every aspect of your test-taking ability.

  • Study Guide

    400-007 Study Guide

    934 PDF Pages

    Developed by industry experts, this 934-page guide spells out in painstaking detail all of the information you need to ace 400-007 exam.

Cisco Certified Design Expert (400-007) Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $154.98
Bundle Price: $134.99

Purchase Individually

  • Questions & Answers

    Questions & Answers

    349 Questions

    $124.99
  • Study Guide

    Study Guide

    934 PDF Pages

    $29.99

Cisco 400-007 Practice Test 6

Question 50

A regional network transformation proposal describes this situation: A company wants zero data loss between distant data centers but cannot tolerate the latency of a synchronous commit across the ocean. Which measurable acceptance result most directly validates that design decision?

  1. Path validation proves restricted data remains on approved routes while measured savings accrue elsewhere.
  2. A measured design documents replication lag and meets the agreed user transaction latency.
  3. A site-loss drill restores data whose age is within the business-approved five-minute objective.
  4. Representative distributed training runs meet collective-communication timing under peak load.

Explanation

Correct Answer

B:

This measurable result validates the proposed architecture: A measured design documents replication lag and meets the agreed user transaction latency. It directly checks the selected design (Reconcile achievable RPO and application latency, considering local synchronous and remote asynchronous tiers.) against the original requirements.

Incorrect Answers

A:

This could validate a different design context: A multinational could save carrier costs through direct internet access but its regulated traffic cannot traverse unapproved jurisdictions. It does not demonstrate the necessary outcome for this case: A measured design documents replication lag and meets the agreed user transaction latency.

C:

This could validate a different design context: A payment company requires recovery with at most five minutes of transaction loss but its only remote backup runs every two hours. It does not demonstrate the necessary outcome for this case: A measured design documents replication lag and meets the agreed user transaction latency.

D:

This could validate a different design context: A machine-learning training cluster uses 400-Gbps GPU fabrics, but oversubscribed leaf uplinks produce long all-reduce synchronization stalls. It does not demonstrate the necessary outcome for this case: A measured design documents replication lag and meets the agreed user transaction latency.

Question 51

A regional network transformation proposal describes this situation: A company wants zero data loss between distant data centers but cannot tolerate the latency of a synchronous commit across the ocean. Which architectural tradeoff or failure mechanism most directly explains the design concern?

  1. Acquisition cost alone hides the operating burden that determines long-term economic value.
  2. Uniform maximum redundancy wastes capital when business criticality varies by workload.
  3. Long propagation delay creates a tradeoff between synchronous protection and application responsiveness.
  4. Synchronized accelerator workloads are sensitive to fabric congestion and incast patterns.

Explanation

Correct Answer

C:

This tradeoff explains the reported network design challenge: A company wants zero data loss between distant data centers but cannot tolerate the latency of a synchronous commit across the ocean. A requirement-aligned design would: Reconcile achievable RPO and application latency, considering local synchronous and remote asynchronous tiers. Its validation is: A measured design documents replication lag and meets the agreed user transaction latency.

Incorrect Answers

A:

This principle belongs to another architecture problem: A CFO prefers a low initial purchase price, but a proposed private WAN requires expensive annual site visits and proprietary license renewals. The specific current tradeoff is instead: Long propagation delay creates a tradeoff between synchronous protection and application responsiveness.

B:

This principle belongs to another architecture problem: An enterprise requests five nines of uptime for every lab printer even though the sales platform alone generates most outage losses. The specific current tradeoff is instead: Long propagation delay creates a tradeoff between synchronous protection and application responsiveness.

D:

This principle belongs to another architecture problem: A machine-learning training cluster uses 400-Gbps GPU fabrics, but oversubscribed leaf uplinks produce long all-reduce synchronization stalls. The specific current tradeoff is instead: Long propagation delay creates a tradeoff between synchronous protection and application responsiveness.

Question 52

A regional network transformation proposal describes this situation: A company wants zero data loss between distant data centers but cannot tolerate the latency of a synchronous commit across the ocean. Which recurring design governance control best prevents the problem from returning?

  1. Make jurisdiction and traffic classification explicit constraints in WAN economic models.
  2. Measure actual recoverable data age in periodic business-continuity tests.
  3. Map architecture approvals to the customer's project governance before choosing delivery methods.
  4. Require stakeholders to sign off explicit RPO-versus-latency tradeoffs.

Explanation

Correct Answer

D:

This governance measure targets recurrence of the identified architectural risk: Long propagation delay creates a tradeoff between synchronous protection and application responsiveness. It supports sustained validation using: A measured design documents replication lag and meets the agreed user transaction latency.

Incorrect Answers

A:

This operational control is aimed at a different concern: A multinational could save carrier costs through direct internet access but its regulated traffic cannot traverse unapproved jurisdictions. The current design risk remains: Long propagation delay creates a tradeoff between synchronous protection and application responsiveness.

B:

This operational control is aimed at a different concern: A payment company requires recovery with at most five minutes of transaction loss but its only remote backup runs every two hours. The current design risk remains: Long propagation delay creates a tradeoff between synchronous protection and application responsiveness.

C:

This operational control is aimed at a different concern: A bank mandates a fixed regulatory cutover date while its branch WAN design depends on security sign-offs at four formal milestones. The current design risk remains: Long propagation delay creates a tradeoff between synchronous protection and application responsiveness.

Question 53

An enterprise architecture review identifies this issue: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. Which network architecture or design decision best meets the stated requirements?

  1. Consolidate telemetry into resilient regional clusters with justified local exceptions.
  2. Right-size access capacity and select efficient platforms while preserving measured growth headroom.
  3. Size PoE delivery for realistic simultaneous demand and choose efficient redundant power capacity.
  4. Place inference close to transaction ingress or select a low-latency regional serving tier.

Explanation

Correct Answer

B:

This high-level design choice addresses the stated constraints: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. The design risk is: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit. The defining acceptance evidence is: Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.

Incorrect Answers

A:

This may be suitable for a different CCDE design context (1.3, Environmental sustainability): A managed network team powers up duplicate telemetry collectors at every location although existing regional collectors meet recovery and data residency requirements. It does not resolve the present constraint: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

C:

This may be suitable for a different CCDE design context (1.3, Environmental sustainability): A warehouse refresh combines new Wi-Fi access points with PoE switches whose total power budget cannot supply every radio at peak output. It does not resolve the present constraint: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

D:

This may be suitable for a different CCDE design context (1.4, AI/Machine Learning business needs and governance): A real-time fraud scoring model runs inference across a 180-ms WAN even though payment authorization must complete within 70 ms. It does not resolve the present constraint: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

Question 54

An enterprise architecture review identifies this issue: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. Which measurable acceptance result most directly validates that design decision?

  1. Collector failure tests preserve essential monitoring while the energy footprint decreases.
  2. A full AP load test maintains required radio power while monitoring power draw against budget.
  3. Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.
  4. Representative distributed training runs meet collective-communication timing under peak load.

Explanation

Correct Answer

C:

This measurable result validates the proposed architecture: Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements. It directly checks the selected design (Right-size access capacity and select efficient platforms while preserving measured growth headroom.) against the original requirements.

Incorrect Answers

A:

This could validate a different design context: A managed network team powers up duplicate telemetry collectors at every location although existing regional collectors meet recovery and data residency requirements. It does not demonstrate the necessary outcome for this case: Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.

B:

This could validate a different design context: A warehouse refresh combines new Wi-Fi access points with PoE switches whose total power budget cannot supply every radio at peak output. It does not demonstrate the necessary outcome for this case: Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.

D:

This could validate a different design context: A machine-learning training cluster uses 400-Gbps GPU fabrics, but oversubscribed leaf uplinks produce long all-reduce synchronization stalls. It does not demonstrate the necessary outcome for this case: Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.

Question 55

An enterprise architecture review identifies this issue: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. Which architectural tradeoff or failure mechanism most directly explains the design concern?

  1. Orphaned transport devices consume electricity after their network purpose ends.
  2. Unnecessary localized always-on services can inflate energy and management costs.
  3. A GPU-rich region is not sufficient justification for violating data sovereignty obligations.
  4. Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

Explanation

Correct Answer

D:

This tradeoff explains the reported network design challenge: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. A requirement-aligned design would: Right-size access capacity and select efficient platforms while preserving measured growth headroom. Its validation is: Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.

Incorrect Answers

A:

This principle belongs to another architecture problem: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. The specific current tradeoff is instead: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

B:

This principle belongs to another architecture problem: A managed network team powers up duplicate telemetry collectors at every location although existing regional collectors meet recovery and data residency requirements. The specific current tradeoff is instead: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

C:

This principle belongs to another architecture problem: An AI training project intends to send patient scans to a global cloud GPU cluster, but national residency rules prohibit exporting raw images. The specific current tradeoff is instead: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

Question 56

An enterprise architecture review identifies this issue: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. Which recurring design governance control best prevents the problem from returning?

  1. Review utilized ports and power draw before each access-layer refresh.
  2. Link energy inventory to the live circuit and service catalog.
  3. Review service placement and operational emissions whenever monitoring platforms scale.
  4. Include application inference latency in network placement and service assurance baselines.

Explanation

Correct Answer

A:

This governance measure targets recurrence of the identified architectural risk: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit. It supports sustained validation using: Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.

Incorrect Answers

B:

This operational control is aimed at a different concern: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. The current design risk remains: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

C:

This operational control is aimed at a different concern: A managed network team powers up duplicate telemetry collectors at every location although existing regional collectors meet recovery and data residency requirements. The current design risk remains: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

D:

This operational control is aimed at a different concern: A real-time fraud scoring model runs inference across a 180-ms WAN even though payment authorization must complete within 70 ms. The current design risk remains: Oversized always-on infrastructure can increase energy consumption without meaningful service benefit.

Question 57

A service provider design workshop presents the following case: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. Which network architecture or design decision best meets the stated requirements?

  1. Size PoE delivery for realistic simultaneous demand and choose efficient redundant power capacity.
  2. Evaluate emissions and latency jointly, placing latency-sensitive control close to users and movable batch work in greener regions.
  3. Decommission unused optical hardware with verified service dependency and power removal.
  4. Compare multi-year CAPEX and OPEX with labor, subscription, carrier, and support assumptions.

Explanation

Correct Answer

C:

This high-level design choice addresses the stated constraints: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. The design risk is: Orphaned transport devices consume electricity after their network purpose ends. The defining acceptance evidence is: Circuit inventory shows no active payload on removed equipment and facility power draw falls.

Incorrect Answers

A:

This may be suitable for a different CCDE design context (1.3, Environmental sustainability): A warehouse refresh combines new Wi-Fi access points with PoE switches whose total power budget cannot supply every radio at peak output. It does not resolve the present constraint: Orphaned transport devices consume electricity after their network purpose ends.

B:

This may be suitable for a different CCDE design context (1.3, Environmental sustainability): An enterprise carbon-reduction initiative suggests moving an application to a greener cloud region despite a strict sub-20-ms transaction path to a factory. It does not resolve the present constraint: Orphaned transport devices consume electricity after their network purpose ends.

D:

This may be suitable for a different CCDE design context (1.2, Solutions based on business continuity and operational sustainability): A CFO prefers a low initial purchase price, but a proposed private WAN requires expensive annual site visits and proprietary license renewals. It does not resolve the present constraint: Orphaned transport devices consume electricity after their network purpose ends.

Question 58

A service provider design workshop presents the following case: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. Which measurable acceptance result most directly validates that design decision?

  1. Lifecycle projections show lower energy use without violating port growth and fault-tolerance requirements.
  2. Collector failure tests preserve essential monitoring while the energy footprint decreases.
  3. A simulated unsafe decision is rejected or reversed and the decision record identifies the triggering evidence.
  4. Circuit inventory shows no active payload on removed equipment and facility power draw falls.

Explanation

Correct Answer

D:

This measurable result validates the proposed architecture: Circuit inventory shows no active payload on removed equipment and facility power draw falls. It directly checks the selected design (Decommission unused optical hardware with verified service dependency and power removal.) against the original requirements.

Incorrect Answers

A:

This could validate a different design context: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. It does not demonstrate the necessary outcome for this case: Circuit inventory shows no active payload on removed equipment and facility power draw falls.

B:

This could validate a different design context: A managed network team powers up duplicate telemetry collectors at every location although existing regional collectors meet recovery and data residency requirements. It does not demonstrate the necessary outcome for this case: Circuit inventory shows no active payload on removed equipment and facility power draw falls.

C:

This could validate a different design context: An enterprise deploys an AI-based traffic controller that may change WAN paths autonomously but has no audit trail or human override. It does not demonstrate the necessary outcome for this case: Circuit inventory shows no active payload on removed equipment and facility power draw falls.

Question 59

A service provider design workshop presents the following case: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. Which architectural tradeoff or failure mechanism most directly explains the design concern?

  1. Orphaned transport devices consume electricity after their network purpose ends.
  2. Per-port advertised PoE does not guarantee enough chassis power for all active endpoints.
  3. Unnecessary localized always-on services can inflate energy and management costs.
  4. Model quality alone does not overcome network round-trip limits on synchronous decisions.

Explanation

Correct Answer

A:

This tradeoff explains the reported network design challenge: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. A requirement-aligned design would: Decommission unused optical hardware with verified service dependency and power removal. Its validation is: Circuit inventory shows no active payload on removed equipment and facility power draw falls.

Incorrect Answers

B:

This principle belongs to another architecture problem: A warehouse refresh combines new Wi-Fi access points with PoE switches whose total power budget cannot supply every radio at peak output. The specific current tradeoff is instead: Orphaned transport devices consume electricity after their network purpose ends.

C:

This principle belongs to another architecture problem: A managed network team powers up duplicate telemetry collectors at every location although existing regional collectors meet recovery and data residency requirements. The specific current tradeoff is instead: Orphaned transport devices consume electricity after their network purpose ends.

D:

This principle belongs to another architecture problem: A real-time fraud scoring model runs inference across a 180-ms WAN even though payment authorization must complete within 70 ms. The specific current tradeoff is instead: Orphaned transport devices consume electricity after their network purpose ends.

Question 60

A service provider design workshop presents the following case: A data center leaves retired DWDM transponders energized after its optical circuits migrate, despite continued rack cooling expense. Which recurring design governance control best prevents the problem from returning?

  1. Check aggregate PoE and thermal headroom during wireless capacity design.
  2. Link energy inventory to the live circuit and service catalog.
  3. Review utilized ports and power draw before each access-layer refresh.
  4. Map common-cause hazards before approving disaster recovery topology.

Explanation

Correct Answer

B:

This governance measure targets recurrence of the identified architectural risk: Orphaned transport devices consume electricity after their network purpose ends. It supports sustained validation using: Circuit inventory shows no active payload on removed equipment and facility power draw falls.

Incorrect Answers

A:

This operational control is aimed at a different concern: A warehouse refresh combines new Wi-Fi access points with PoE switches whose total power budget cannot supply every radio at peak output. The current design risk remains: Orphaned transport devices consume electricity after their network purpose ends.

C:

This operational control is aimed at a different concern: A campus proposes replacing all switches with high-density power-hungry models even though existing endpoints use under ten percent of available ports. The current design risk remains: Orphaned transport devices consume electricity after their network purpose ends.

D:

This operational control is aimed at a different concern: A regional operator has one data center and a second site with shared utility power, but its continuity document calls the sites independent. The current design risk remains: Orphaned transport devices consume electricity after their network purpose ends.