Question 520
A service provider design workshop presents the following case: A factory has legacy PLCs that cannot run endpoint agents and proposes direct unrestricted IP connectivity from contractor laptops. Which recurring design governance control best prevents the problem from returning?
Explanation
Correct Answer
This governance measure targets recurrence of the identified architectural risk: Unmanaged industrial assets require network-level isolation compensating for weak endpoint security. It supports sustained validation using: Contractor devices cannot directly route to PLC control ports but approved maintenance sessions are audited.
Incorrect Answers
This operational control is aimed at a different concern: An enterprise runs encrypted TLS 1.3 between applications and expects an ordinary passive switch SPAN to show sensitive request bodies for investigation. The current design risk remains: Unmanaged industrial assets require network-level isolation compensating for weak endpoint security.
This operational control is aimed at a different concern: A hospital wireless network uses one shared WPA password for technicians and visitors, making individual device revocation impossible. The current design risk remains: Unmanaged industrial assets require network-level isolation compensating for weak endpoint security.
This operational control is aimed at a different concern: An engineering firm moves CAD workloads to a remote data center, but mouse operations feel delayed despite adequate megabit capacity. The current design risk remains: Unmanaged industrial assets require network-level isolation compensating for weak endpoint security.