Question 340
A service provider design workshop presents the following case: A WAN refresh promises no downtime during carrier replacement, but the migration plan removes the old circuit before the new SD-WAN overlay is fully tested. Which recurring design governance control best prevents the problem from returning?
Explanation
Correct Answer
This governance measure targets recurrence of the identified architectural risk: A cut-first migration violates continuity requirements when replacement transport remains unproven. It supports sustained validation using: Representative transactions pass over the new transport before decommissioning the former route.
Incorrect Answers
This operational control is aimed at a different concern: A newly merged university has duplicate RFC1918 prefixes in two networks that must temporarily share identity services during a staged integration. The current design risk remains: A cut-first migration violates continuity requirements when replacement transport remains unproven.
This operational control is aimed at a different concern: A multisite network requires zero unicast forwarding loops during a core reconvergence but uses independent OSPF timer changes without microloop analysis. The current design risk remains: A cut-first migration violates continuity requirements when replacement transport remains unproven.
This operational control is aimed at a different concern: An AI-assisted network assurance tool recommends changing BGP local preference based on synthetic metrics that cannot be traced to the original collectors. The current design risk remains: A cut-first migration violates continuity requirements when replacement transport remains unproven.