Question 320
During an entry-level network technician review, the team identifies this condition: A small office rack plan shows access switches uplinked to a distribution switch, but an installer connects two adjacent access ports together to match a visually short line on the drawing. Which repeatable network support control most directly reduces the chance of this issue recurring?
Explanation
Correct Answer
The relevant repeatable safeguard is: Document the interface and forwarding plan and demonstrate: the correct interface IDs match the approved diagram and the switching topology has no unintended loop-induced broadcast storm. It addresses the reason (Logical diagrams and labeled uplink ports must guide cabling; accidental Layer 2 loops can disrupt an entire LAN.) and is measured by: The correct interface IDs match the approved diagram and the switching topology has no unintended loop-induced broadcast storm.
Incorrect Answers
This safeguard controls another risk: A network handoff sheet calls for switch port Gi1/0/24 toward the firewall inside interface, but the installer connects port Gi1/0/1 and assumes the number cannot affect the service. The needed control for this case is: Document the interface and forwarding plan and demonstrate: the correct interface IDs match the approved diagram and the switching topology has no unintended loop-induced broadcast storm.
This safeguard controls another risk: A campus classroom diagram assigns one uplink per switch to a fiber-capable distribution port, but the installer uses ordinary RJ-45 cable into the nearby management console socket. The needed control for this case is: Document the interface and forwarding plan and demonstrate: the correct interface IDs match the approved diagram and the switching topology has no unintended loop-induced broadcast storm.
This safeguard controls another risk: A trainee plugs a normal Ethernet patch cord into a Cisco router console port because it resembles the other RJ-45 style connectors and expects IP packets to pass. The needed control for this case is: Document the interface and forwarding plan and demonstrate: the correct interface IDs match the approved diagram and the switching topology has no unintended loop-induced broadcast storm.