Question 610
At Evercrest Energy Services, while reviewing a packet-capture request, the data center fabric team observes: An operator enables a broad system ACL as a quick workaround to an unrelated data-plane incident. What test result proves the affected fabric function now works?
Explanation
Correct Answer
At Evercrest Energy Services, while reviewing a packet-capture request, the decisive validation is: Management restrictions remain in effect while the tenant forwarding defect is resolved. It verifies that the change (Restore the scoped data-plane investigation and leave approved system ACL limits intact) resolved the mechanism: The proposed control change conflates management access policy with tenant forwarding policy.
Incorrect Answers
At Evercrest Energy Services, while reviewing a packet-capture request, this option proposes: The incident record distinguishes interface status from last-report time. This is a valid category of fabric maintenance for another scenario (A dashboard treats a stale telemetry timestamp as proof that a link is down), not the targeted action for Evercrest Energy Services. The distinction is the actual cause: The proposed control change conflates management access policy with tenant forwarding policy.
At Evercrest Energy Services, while reviewing a packet-capture request, this option proposes: A safe test event arrives at the remote collector with expected device identity. Although related to Logging, monitoring, filters and ACLs, the proposed change fits another mechanism: The remote logging destination or source path was not configured correctly. The evidence in the current case requires a different result: Management restrictions remain in effect while the tenant forwarding defect is resolved.
At Evercrest Energy Services, while reviewing a packet-capture request, this option proposes: A bounded permitted test flow appears in the capture without excess unrelated traffic. The alternative focuses on The capture match, source point or protocol selection excludes the intended packets, not on the stated defect. For this scenario the expected acceptance result would be: Management restrictions remain in effect while the tenant forwarding defect is resolved.