"Nokia Data Center Fabric Fundamentals Exam", also known as 4A0-D01 exam, is a Nokia certification exam.

Pass your tests with the always up-to-date 4A0-D01 Exam Engine. Your 4A0-D01 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Nokia 4A0-D01 Practice Test 59

Question 580

At Skyline Energy Services, while verifying tenant isolation, the data center fabric team observes: An EVPN overlay tunnel forms but frames arrive under the wrong tenant identifier. What repeatable acceptance check would reduce recurrence?

  1. Monitor unusual tenant MAC growth and audit service attachments
  2. Use cross-tenant route leak checks in L3 overlay regression suites
  3. Audit overlay encapsulation metadata during new tenant provisioning
  4. Test ARP resolution and subsequent unicast after overlay configuration changes

Explanation

Correct Answer

C:

At Skyline Energy Services, while verifying tenant isolation, for Skyline Energy Services, include the safeguard: Audit overlay encapsulation metadata during new tenant provisioning. It reduces repeat risk from the original mechanism and complements a validation of: Sample frames remain in the correct tenant across the remote leaves.

Incorrect Answers

A:

At Skyline Energy Services, while verifying tenant isolation, this option proposes: Monitor unusual tenant MAC growth and audit service attachments. Using that approach would investigate A tenant's bridge MAC table grows with unexpected external endpoint addresses instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The VXLAN network identifier does not match the intended tenant service.

B:

At Skyline Energy Services, while verifying tenant isolation, this option proposes: Use cross-tenant route leak checks in L3 overlay regression suites. The alternative focuses on The EVPN route-target import policy is too broad for the isolated IP-VRF, not on the stated defect. For this scenario the expected acceptance result would be: Sample frames remain in the correct tenant across the remote leaves.

D:

At Skyline Energy Services, while verifying tenant isolation, this option proposes: Test ARP resolution and subsequent unicast after overlay configuration changes. It tests a different symptom: Two virtual machines share a subnet across leaves but ARP requests fail to discover their peers. For the observed case, the relevant distinction is The VXLAN network identifier does not match the intended tenant service, with verification: Sample frames remain in the correct tenant across the remote leaves.

Question 581

At Whitepine Health Systems, while moving a workload between leaves, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. Which action resolves the identified fabric-management issue?

  1. Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves
  2. Withdraw obsolete MAC/IP or prefix advertisements and clean up unused service bindings
  3. Correct underlay reachability for remote VTEP loopbacks without leaking tenant routes
  4. Adjust and validate supported end-to-end transport MTU for the encapsulated service

Explanation

Correct Answer

C:

At Whitepine Health Systems, while moving a workload between leaves, choose this remediation because it targets the mechanism: The remote overlay next hop is not reachable through the intended underlay route table. The supported corrective action is: Correct underlay reachability for remote VTEP loopbacks without leaking tenant routes. Verification requires: The EVPN next hop resolves and a controlled tenant flow succeeds.

Incorrect Answers

A:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves. This option assumes the other problem (Local switching works on a leaf but remote same-VNI switching fails after a VLAN change) is present. The case instead describes An EVPN route is imported but its next-hop resolves to an inaccessible loopback, for which the causal issue is The remote overlay next hop is not reachable through the intended underlay route table.

B:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: Withdraw obsolete MAC/IP or prefix advertisements and clean up unused service bindings. It tests a different symptom: EVPN paths continue to advertise a deleted tenant service after offboarding. For the observed case, the relevant distinction is The remote overlay next hop is not reachable through the intended underlay route table, with verification: The EVPN next hop resolves and a controlled tenant flow succeeds.

D:

An overlay forwarding issue affects only jumbo-sized packets. Here, the remote overlay next hop is not reachable through the intended underlay route table.

Question 582

At Whitepine Health Systems, while moving a workload between leaves, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. Which result would establish that the original defect has been corrected?

  1. Remote peers no longer import the deleted service routes while remaining tenants stay healthy
  2. The host sees the intended gateway and unrelated tenant gateways are unchanged
  3. The EVPN next hop resolves and a controlled tenant flow succeeds
  4. The MAC-VRF contains only legitimate tenant MACs after the correction

Explanation

Correct Answer

C:

At Whitepine Health Systems, while moving a workload between leaves, the decisive validation is: The EVPN next hop resolves and a controlled tenant flow succeeds. It verifies that the change (Correct underlay reachability for remote VTEP loopbacks without leaking tenant routes) resolved the mechanism: The remote overlay next hop is not reachable through the intended underlay route table.

Incorrect Answers

A:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: Remote peers no longer import the deleted service routes while remaining tenants stay healthy. It tests a different symptom: EVPN paths continue to advertise a deleted tenant service after offboarding. For the observed case, the relevant distinction is The remote overlay next hop is not reachable through the intended underlay route table, with verification: The EVPN next hop resolves and a controlled tenant flow succeeds.

B:

The IP-VRF gateway prefix was copied from a different tenant service, but here the case reports An EVPN route is imported but its next-hop resolves to an inaccessible loopback. Here, the remote overlay next hop is not reachable through the intended underlay route table.

D:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: The MAC-VRF contains only legitimate tenant MACs after the correction. This is a valid category of fabric maintenance for another scenario (A tenant's bridge MAC table grows with unexpected external endpoint addresses), not the targeted action for Whitepine Health Systems. The distinction is the actual cause: The remote overlay next hop is not reachable through the intended underlay route table.

Question 583

At Whitepine Health Systems, while moving a workload between leaves, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. Which root cause fits the reported state?

  1. The IP-VRF gateway prefix was copied from a different tenant service
  2. The EVPN route-target import policy is too broad for the isolated IP-VRF
  3. The new MAC-VRF lacks correct endpoint learning or EVPN service advertisement
  4. The remote overlay next hop is not reachable through the intended underlay route table

Explanation

Correct Answer

D:

At Whitepine Health Systems, while moving a workload between leaves, the remote overlay next hop is not reachable through the intended underlay route table. That is the cause of the described failure, and a corrective check should demonstrate: The EVPN next hop resolves and a controlled tenant flow succeeds.

Incorrect Answers

A:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: The IP-VRF gateway prefix was copied from a different tenant service. The option describes a different failure mode: A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. It would address The IP-VRF gateway prefix was copied from a different tenant service, but here the case reports An EVPN route is imported but its next-hop resolves to an inaccessible loopback. The current required evidence is: The EVPN next hop resolves and a controlled tenant flow succeeds.

B:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: The EVPN route-target import policy is too broad for the isolated IP-VRF. That choice would be more relevant when this different symptom occurs: A tenant route leaks into another tenant's routing table. The present scenario instead points to: The remote overlay next hop is not reachable through the intended underlay route table. The correct resolution has its own verification outcome: The EVPN next hop resolves and a controlled tenant flow succeeds.

C:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: The new MAC-VRF lacks correct endpoint learning or EVPN service advertisement. This is a valid category of fabric maintenance for another scenario (A leaf reports healthy EVPN neighbors but has no Type 2 MAC/IP routes for a new VLAN), not the targeted action for Whitepine Health Systems. The distinction is the actual cause: The remote overlay next hop is not reachable through the intended underlay route table.

Question 584

At Whitepine Health Systems, while moving a workload between leaves, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. Which recurring validation best prevents this failure mode?

  1. Check overlay next-hop resolution after changes to underlay advertisement
  2. Document L3 overlay forwarding model before provisioning tenant VNIs
  3. Test per-tenant gateway addressing during subnet provisioning
  4. Test unknown-unicast handling when onboarding a new EVPN segment

Explanation

Correct Answer

A:

At Whitepine Health Systems, while moving a workload between leaves, the preventive control is: Check overlay next-hop resolution after changes to underlay advertisement. It catches the same mechanism (The remote overlay next hop is not reachable through the intended underlay route table) before the symptom recurs. An appropriate regression observation is: The EVPN next hop resolves and a controlled tenant flow succeeds.

Incorrect Answers

B:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: Document L3 overlay forwarding model before provisioning tenant VNIs. This is a valid category of fabric maintenance for another scenario (An asymmetric routed overlay cannot send traffic when the destination subnet is absent locally), not the targeted action for Whitepine Health Systems. The distinction is the actual cause: The remote overlay next hop is not reachable through the intended underlay route table.

C:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: Test per-tenant gateway addressing during subnet provisioning. Although related to EVPN, VXLAN, MAC-VRF and IP-VRF overlays, the proposed change fits another mechanism: The IP-VRF gateway prefix was copied from a different tenant service. The evidence in the current case requires a different result: The EVPN next hop resolves and a controlled tenant flow succeeds.

D:

At Whitepine Health Systems, while moving a workload between leaves, this option proposes: Test unknown-unicast handling when onboarding a new EVPN segment. Using that approach would investigate A fabric duplicates unknown-destination frames unnecessarily for a service that should use learned EVPN state instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The remote overlay next hop is not reachable through the intended underlay route table.

Question 585

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. Which targeted adjustment best corrects this behavior?

  1. Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves
  2. Correct underlay reachability for remote VTEP loopbacks without leaking tenant routes
  3. Validate local bridge attachment and the EVPN MAC/IP export for the affected service
  4. Withdraw obsolete MAC/IP or prefix advertisements and clean up unused service bindings

Explanation

Correct Answer

B:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, for Cresthaven Rail Logistics, the applicable change is: Correct underlay reachability for remote VTEP loopbacks without leaking tenant routes. The causal issue is: The remote overlay next hop is not reachable through the intended underlay route table. A successful validation would show: The EVPN next hop resolves and a controlled tenant flow succeeds.

Incorrect Answers

A:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves. Although related to EVPN, VXLAN, MAC-VRF and IP-VRF overlays, the proposed change fits another mechanism: The local subinterface to MAC-VRF attachment differs from remote service mapping. The evidence in the current case requires a different result: The EVPN next hop resolves and a controlled tenant flow succeeds.

C:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Validate local bridge attachment and the EVPN MAC/IP export for the affected service. The alternative focuses on The new MAC-VRF lacks correct endpoint learning or EVPN service advertisement, not on the stated defect. For this scenario the expected acceptance result would be: The EVPN next hop resolves and a controlled tenant flow succeeds.

D:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Withdraw obsolete MAC/IP or prefix advertisements and clean up unused service bindings. This option assumes the other problem (EVPN paths continue to advertise a deleted tenant service after offboarding) is present. The case instead describes An EVPN route is imported but its next-hop resolves to an inaccessible loopback, for which the causal issue is The remote overlay next hop is not reachable through the intended underlay route table.

Question 586

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. What observation should be required before this case is closed?

  1. Negative traffic tests confirm no cross-tenant flooding or MAC learning
  2. The EVPN next hop resolves and a controlled tenant flow succeeds
  3. Both same-subnet bridging and routed inter-subnet traffic work within the authorized tenant
  4. Small and correctly sized large test frames cross VXLAN without fragmentation issues

Explanation

Correct Answer

B:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, for Cresthaven Rail Logistics, accept the repair only after this observation: The EVPN next hop resolves and a controlled tenant flow succeeds. The test distinguishes real recovery from a superficial status change.

Incorrect Answers

A:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Negative traffic tests confirm no cross-tenant flooding or MAC learning. Using that approach would investigate An EVPN change accidentally exposes one tenant's broadcast traffic to another instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The remote overlay next hop is not reachable through the intended underlay route table.

C:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Both same-subnet bridging and routed inter-subnet traffic work within the authorized tenant. This option assumes the other problem (Inter-subnet tenant traffic fails even though same-subnet EVPN traffic works) is present. The case instead describes An EVPN route is imported but its next-hop resolves to an inaccessible loopback, for which the causal issue is The remote overlay next hop is not reachable through the intended underlay route table.

D:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Small and correctly sized large test frames cross VXLAN without fragmentation issues. It tests a different symptom: An overlay forwarding issue affects only jumbo-sized packets. For the observed case, the relevant distinction is The remote overlay next hop is not reachable through the intended underlay route table, with verification: The EVPN next hop resolves and a controlled tenant flow succeeds.

Question 587

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. What causal finding should the investigation prioritize?

  1. An unintended physical attachment or route-target import is feeding a MAC-VRF
  2. The IP-VRF gateway prefix was copied from a different tenant service
  3. The remote overlay next hop is not reachable through the intended underlay route table
  4. Service decommissioning did not remove all associated EVPN route advertisements

Explanation

Correct Answer

C:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, the evidence points to: The remote overlay next hop is not reachable through the intended underlay route table. The follow-up test (The EVPN next hop resolves and a controlled tenant flow succeeds) distinguishes this mechanism from a separate fabric fault.

Incorrect Answers

A:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: An unintended physical attachment or route-target import is feeding a MAC-VRF. The alternative focuses on An unintended physical attachment or route-target import is feeding a MAC-VRF, not on the stated defect. For this scenario the expected acceptance result would be: The EVPN next hop resolves and a controlled tenant flow succeeds.

B:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: The IP-VRF gateway prefix was copied from a different tenant service. This option assumes the other problem (A tenant interface uses the wrong virtual-router gateway address after a new subnet is created) is present. The case instead describes An EVPN route is imported but its next-hop resolves to an inaccessible loopback, for which the causal issue is The remote overlay next hop is not reachable through the intended underlay route table.

D:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Service decommissioning did not remove all associated EVPN route advertisements. The option describes a different failure mode: EVPN paths continue to advertise a deleted tenant service after offboarding. It would address Service decommissioning did not remove all associated EVPN route advertisements, but here the case reports An EVPN route is imported but its next-hop resolves to an inaccessible loopback. The current required evidence is: The EVPN next hop resolves and a controlled tenant flow succeeds.

Question 588

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, the data center fabric team observes: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. What ongoing operational safeguard directly addresses this root issue?

  1. Check overlay next-hop resolution after changes to underlay advertisement
  2. Test complete VLAN-to-MAC-VRF-to-VNI association in acceptance checks
  3. Compare per-tenant VNI mappings across fabric nodes during deployment
  4. Verify inter-subnet forwarding behavior separately from MAC reachability

Explanation

Correct Answer

A:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, the preventive control is: Check overlay next-hop resolution after changes to underlay advertisement. It catches the same mechanism (The remote overlay next hop is not reachable through the intended underlay route table) before the symptom recurs. An appropriate regression observation is: The EVPN next hop resolves and a controlled tenant flow succeeds.

Incorrect Answers

B:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Test complete VLAN-to-MAC-VRF-to-VNI association in acceptance checks. It tests a different symptom: Local switching works on a leaf but remote same-VNI switching fails after a VLAN change. For the observed case, the relevant distinction is The remote overlay next hop is not reachable through the intended underlay route table, with verification: The EVPN next hop resolves and a controlled tenant flow succeeds.

C:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Compare per-tenant VNI mappings across fabric nodes during deployment. The option describes a different failure mode: Two remote leaves use different VNI values for the same intended tenant broadcast domain. It would address The L2 EVPN service-to-VNI mapping is inconsistent across participants, but here the case reports An EVPN route is imported but its next-hop resolves to an inaccessible loopback. The current required evidence is: The EVPN next hop resolves and a controlled tenant flow succeeds.

D:

At Cresthaven Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Verify inter-subnet forwarding behavior separately from MAC reachability. That choice would be more relevant when this different symptom occurs: The design expects symmetric L3 EVPN routing but only configures local MAC-VRF gateways. The present scenario instead points to: The remote overlay next hop is not reachable through the intended underlay route table. The correct resolution has its own verification outcome: The EVPN next hop resolves and a controlled tenant flow succeeds.

Question 589

At Riverbend Municipal Networks, while moving a workload between leaves, the data center fabric team observes: A multi-leaf EVPN service intermittently fails after a spine path changes. Which supported remediation most directly addresses the stated failure?

  1. Validate local bridge attachment and the EVPN MAC/IP export for the affected service
  2. Correct the tenant gateway address and routing-instance binding for the new subnet
  3. Restore equivalent underlay paths and confirm overlay next-hop resolution under failure
  4. Align the gateway subinterface and tenant IP-VRF service configuration

Explanation

Correct Answer

C:

At Riverbend Municipal Networks, while moving a workload between leaves, choose this remediation because it targets the mechanism: The overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path. The supported corrective action is: Restore equivalent underlay paths and confirm overlay next-hop resolution under failure. Verification requires: Tenant traffic remains successful during a controlled single-underlay-path failover.

Incorrect Answers

A:

The new MAC-VRF lacks correct endpoint learning or EVPN service advertisement, but here the case reports A multi-leaf EVPN service intermittently fails after a spine path changes. Here, the overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path.

B:

A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. Here, the overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path.

D:

At Riverbend Municipal Networks, while moving a workload between leaves, this option proposes: Align the gateway subinterface and tenant IP-VRF service configuration. Although related to EVPN, VXLAN, MAC-VRF and IP-VRF overlays, the proposed change fits another mechanism: The tenant gateway interface is not associated with the correct IP-VRF and subnet. The evidence in the current case requires a different result: Tenant traffic remains successful during a controlled single-underlay-path failover.

Question 590

At Riverbend Municipal Networks, while moving a workload between leaves, the data center fabric team observes: A multi-leaf EVPN service intermittently fails after a spine path changes. Which evidence directly validates the intended repair?

  1. The intended remote VTEPs are present and test traffic traverses the service
  2. Tenant traffic remains successful during a controlled single-underlay-path failover
  3. An approved workload reaches its default gateway and a remote destination through that VRF
  4. A controlled routed flow succeeds using the service model chosen for the fabric

Explanation

Correct Answer

B:

At Riverbend Municipal Networks, while moving a workload between leaves, for Riverbend Municipal Networks, accept the repair only after this observation: Tenant traffic remains successful during a controlled single-underlay-path failover. The test distinguishes real recovery from a superficial status change.

Incorrect Answers

A:

At Riverbend Municipal Networks, while moving a workload between leaves, this option proposes: The intended remote VTEPs are present and test traffic traverses the service. That choice would be more relevant when this different symptom occurs: An EVPN service is configured but no tunnels are shown to its intended peer leaves. The present scenario instead points to: The overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path. The correct resolution has its own verification outcome: Tenant traffic remains successful during a controlled single-underlay-path failover.

C:

At Riverbend Municipal Networks, while moving a workload between leaves, this option proposes: An approved workload reaches its default gateway and a remote destination through that VRF. Although related to EVPN, VXLAN, MAC-VRF and IP-VRF overlays, the proposed change fits another mechanism: The tenant gateway interface is not associated with the correct IP-VRF and subnet. The evidence in the current case requires a different result: Tenant traffic remains successful during a controlled single-underlay-path failover.

D:

At Riverbend Municipal Networks, while moving a workload between leaves, this option proposes: A controlled routed flow succeeds using the service model chosen for the fabric. Using that approach would investigate An asymmetric routed overlay cannot send traffic when the destination subnet is absent locally instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path.