100% Nokia 4A0-D01 Guaranteed Success With Testking Training Materials

Get Real 4A0-D01 Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

61 Questions & Answers with Testing Engine

"Nokia Data Center Fabric Fundamentals Exam", also known as 4A0-D01 exam, is a Nokia certification exam.

Pass your tests with the always up-to-date 4A0-D01 Exam Engine. Your 4A0-D01 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Nokia 4A0-D01 Practice Test 50

Question 490

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, the data center fabric team observes: Local switching works on a leaf but remote same-VNI switching fails after a VLAN change. What observation should be required before this case is closed?

  1. Remote peers no longer import the deleted service routes while remaining tenants stay healthy
  2. A controlled ARP request resolves the remote endpoint and unicast traffic succeeds
  3. The affected VLAN reaches the correct remote tenant service without changing other VNIs
  4. A controlled routed flow succeeds using the service model chosen for the fabric

Explanation

Correct Answer

C:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, the decisive validation is: The affected VLAN reaches the correct remote tenant service without changing other VNIs. It verifies that the change (Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves) resolved the mechanism: The local subinterface to MAC-VRF attachment differs from remote service mapping.

Incorrect Answers

A:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Remote peers no longer import the deleted service routes while remaining tenants stay healthy. Using that approach would investigate EVPN paths continue to advertise a deleted tenant service after offboarding instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The local subinterface to MAC-VRF attachment differs from remote service mapping.

B:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: A controlled ARP request resolves the remote endpoint and unicast traffic succeeds. The alternative focuses on The L2 EVPN overlay lacks the expected MAC/IP learning or flood behavior, not on the stated defect. For this scenario the expected acceptance result would be: The affected VLAN reaches the correct remote tenant service without changing other VNIs.

D:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: A controlled routed flow succeeds using the service model chosen for the fabric. It tests a different symptom: An asymmetric routed overlay cannot send traffic when the destination subnet is absent locally. For the observed case, the relevant distinction is The local subinterface to MAC-VRF attachment differs from remote service mapping, with verification: The affected VLAN reaches the correct remote tenant service without changing other VNIs.

Question 491

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, the data center fabric team observes: Local switching works on a leaf but remote same-VNI switching fails after a VLAN change. What causal finding should the investigation prioritize?

  1. The local subinterface to MAC-VRF attachment differs from remote service mapping
  2. The VXLAN network identifier does not match the intended tenant service
  3. The route-target or prefix filter was not updated with the approved tenant expansion
  4. The routed underlay MTU does not accommodate the additional VXLAN encapsulation overhead

Explanation

Correct Answer

A:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, for Midvale Rail Logistics, investigate this cause first: The local subinterface to MAC-VRF attachment differs from remote service mapping. It is directly linked to the observed symptom rather than another service issue.

Incorrect Answers

B:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: The VXLAN network identifier does not match the intended tenant service. This option assumes the other problem (An EVPN overlay tunnel forms but frames arrive under the wrong tenant identifier) is present. The case instead describes Local switching works on a leaf but remote same-VNI switching fails after a VLAN change, for which the causal issue is The local subinterface to MAC-VRF attachment differs from remote service mapping.

C:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: The route-target or prefix filter was not updated with the approved tenant expansion. It tests a different symptom: An EVPN route import policy permits the expected tenant prefix but blocks a new legitimate subnet. For the observed case, the relevant distinction is The local subinterface to MAC-VRF attachment differs from remote service mapping, with verification: The affected VLAN reaches the correct remote tenant service without changing other VNIs.

D:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: The routed underlay MTU does not accommodate the additional VXLAN encapsulation overhead. The option describes a different failure mode: An overlay forwarding issue affects only jumbo-sized packets. It would address The routed underlay MTU does not accommodate the additional VXLAN encapsulation overhead, but here the case reports Local switching works on a leaf but remote same-VNI switching fails after a VLAN change. The current required evidence is: The affected VLAN reaches the correct remote tenant service without changing other VNIs.

Question 492

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, the data center fabric team observes: Local switching works on a leaf but remote same-VNI switching fails after a VLAN change. What ongoing operational safeguard directly addresses this root issue?

  1. Account for tunnel overhead when selecting underlay interface MTU
  2. Check overlay next-hop resolution after changes to underlay advertisement
  3. Test complete VLAN-to-MAC-VRF-to-VNI association in acceptance checks
  4. Review gateway-to-VRF binding and prefix scope during tenant changes

Explanation

Correct Answer

C:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, for Midvale Rail Logistics, include the safeguard: Test complete VLAN-to-MAC-VRF-to-VNI association in acceptance checks. It reduces repeat risk from the original mechanism and complements a validation of: The affected VLAN reaches the correct remote tenant service without changing other VNIs.

Incorrect Answers

A:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Account for tunnel overhead when selecting underlay interface MTU. This option assumes the other problem (An overlay forwarding issue affects only jumbo-sized packets) is present. The case instead describes Local switching works on a leaf but remote same-VNI switching fails after a VLAN change, for which the causal issue is The local subinterface to MAC-VRF attachment differs from remote service mapping.

B:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Check overlay next-hop resolution after changes to underlay advertisement. It tests a different symptom: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. For the observed case, the relevant distinction is The local subinterface to MAC-VRF attachment differs from remote service mapping, with verification: The affected VLAN reaches the correct remote tenant service without changing other VNIs.

D:

At Midvale Rail Logistics, while testing cross-subnet tenant traffic, this option proposes: Review gateway-to-VRF binding and prefix scope during tenant changes. That choice would be more relevant when this different symptom occurs: A routed tenant interface has no effective gateway for workloads. The present scenario instead points to: The local subinterface to MAC-VRF attachment differs from remote service mapping. The correct resolution has its own verification outcome: The affected VLAN reaches the correct remote tenant service without changing other VNIs.

Question 493

At Farsight Digital Commerce, while onboarding a new EVPN tenant, the data center fabric team observes: A newly advertised tenant subnet is absent from remote L3 EVPN routing. Which supported remediation most directly addresses the stated failure?

  1. Check the applicable EVPN IP-prefix route export and import settings
  2. Validate MAC-VRF membership, EVPN route exchange and permitted broadcast handling
  3. Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves
  4. Separate the tenants' bridge services, VNIs and interface memberships

Explanation

Correct Answer

A:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, check the applicable EVPN IP-prefix route export and import settings. This addresses the specific failure mechanism (The intended IP prefix route is not originated or imported for the L3 service) rather than treating only the visible alarm. The required acceptance evidence is: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop.

Incorrect Answers

B:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: Validate MAC-VRF membership, EVPN route exchange and permitted broadcast handling. That choice would be more relevant when this different symptom occurs: Two virtual machines share a subnet across leaves but ARP requests fail to discover their peers. The present scenario instead points to: The intended IP prefix route is not originated or imported for the L3 service. The correct resolution has its own verification outcome: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop.

C:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves. This is a valid category of fabric maintenance for another scenario (Local switching works on a leaf but remote same-VNI switching fails after a VLAN change), not the targeted action for Farsight Digital Commerce. The distinction is the actual cause: The intended IP prefix route is not originated or imported for the L3 service.

D:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: Separate the tenants' bridge services, VNIs and interface memberships. Although related to EVPN, VXLAN, MAC-VRF and IP-VRF overlays, the proposed change fits another mechanism: Two MAC-VRFs share an unintended service attachment or VNI mapping. The evidence in the current case requires a different result: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop.

Question 494

At Farsight Digital Commerce, while onboarding a new EVPN tenant, the data center fabric team observes: A newly advertised tenant subnet is absent from remote L3 EVPN routing. Which evidence directly validates the intended repair?

  1. Remote VTEP endpoints can be reached from the selected source loopbacks
  2. A tenant test packet reaches its remote leaf using the intended VXLAN path
  3. A remote tenant IP-VRF imports the required prefix with the correct overlay next hop
  4. A test endpoint on each leaf exchanges tenant frames in the intended L2 service

Explanation

Correct Answer

C:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, the decisive validation is: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop. It verifies that the change (Check the applicable EVPN IP-prefix route export and import settings) resolved the mechanism: The intended IP prefix route is not originated or imported for the L3 service.

Incorrect Answers

A:

A VXLAN VTEP cannot reach a remote tenant endpoint even though MAC-VRFs exist. Here, the intended IP prefix route is not originated or imported for the L3 service.

B:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: A tenant test packet reaches its remote leaf using the intended VXLAN path. This is a valid category of fabric maintenance for another scenario (BGP EVPN peers come up over the underlay but a remote VTEP remains unable to carry data traffic), not the targeted action for Farsight Digital Commerce. The distinction is the actual cause: The intended IP prefix route is not originated or imported for the L3 service.

D:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: A test endpoint on each leaf exchanges tenant frames in the intended L2 service. Using that approach would investigate Two remote leaves use different VNI values for the same intended tenant broadcast domain instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The intended IP prefix route is not originated or imported for the L3 service.

Question 495

At Farsight Digital Commerce, while onboarding a new EVPN tenant, the data center fabric team observes: A newly advertised tenant subnet is absent from remote L3 EVPN routing. Which underlying mechanism best accounts for this symptom?

  1. The intended IP prefix route is not originated or imported for the L3 service
  2. MAC and IP binding dissemination is incomplete for the endpoint advertisement
  3. Two MAC-VRFs share an unintended service attachment or VNI mapping
  4. An unintended overlay attachment or duplicated MAC advertisement exists in the fabric

Explanation

Correct Answer

A:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, for Farsight Digital Commerce, investigate this cause first: The intended IP prefix route is not originated or imported for the L3 service. It is directly linked to the observed symptom rather than another service issue.

Incorrect Answers

B:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: MAC and IP binding dissemination is incomplete for the endpoint advertisement. Although related to EVPN, VXLAN, MAC-VRF and IP-VRF overlays, the proposed change fits another mechanism: MAC and IP binding dissemination is incomplete for the endpoint advertisement. The evidence in the current case requires a different result: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop.

C:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: Two MAC-VRFs share an unintended service attachment or VNI mapping. Using that approach would investigate An EVPN change accidentally exposes one tenant's broadcast traffic to another instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The intended IP prefix route is not originated or imported for the L3 service.

D:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: An unintended overlay attachment or duplicated MAC advertisement exists in the fabric. The alternative focuses on An unintended overlay attachment or duplicated MAC advertisement exists in the fabric, not on the stated defect. For this scenario the expected acceptance result would be: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop.

Question 496

At Farsight Digital Commerce, while onboarding a new EVPN tenant, the data center fabric team observes: A newly advertised tenant subnet is absent from remote L3 EVPN routing. Which review gate should be added to prevent the same error?

  1. Include route-type and prefix advertisement tests in L3 EVPN acceptance
  2. Include separate control-plane and VXLAN data-plane checks for every overlay
  3. Gate overlay validation on underlay VTEP-address reachability
  4. Use cross-tenant route leak checks in L3 overlay regression suites

Explanation

Correct Answer

A:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, the preventive control is: Include route-type and prefix advertisement tests in L3 EVPN acceptance. It catches the same mechanism (The intended IP prefix route is not originated or imported for the L3 service) before the symptom recurs. An appropriate regression observation is: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop.

Incorrect Answers

B:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: Include separate control-plane and VXLAN data-plane checks for every overlay. Using that approach would investigate BGP EVPN peers come up over the underlay but a remote VTEP remains unable to carry data traffic instead. No evidence for that separate failure is supplied here; the reported case is consistent with: The intended IP prefix route is not originated or imported for the L3 service.

C:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: Gate overlay validation on underlay VTEP-address reachability. The alternative focuses on The VTEP source address is not reachable in the routed underlay, not on the stated defect. For this scenario the expected acceptance result would be: A remote tenant IP-VRF imports the required prefix with the correct overlay next hop.

D:

At Farsight Digital Commerce, while onboarding a new EVPN tenant, this option proposes: Use cross-tenant route leak checks in L3 overlay regression suites. This option assumes the other problem (A tenant route leaks into another tenant's routing table) is present. The case instead describes A newly advertised tenant subnet is absent from remote L3 EVPN routing, for which the causal issue is The intended IP prefix route is not originated or imported for the L3 service.

Question 497

At Greenfield Rail Logistics, while moving a workload between leaves, the data center fabric team observes: A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. What configuration or operational change should the engineer prioritize?

  1. Correct the tenant gateway address and routing-instance binding for the new subnet
  2. Align the selected asymmetric or symmetric L3 EVPN model with deployed tenant subnets
  3. Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves
  4. Validate local bridge attachment and the EVPN MAC/IP export for the affected service

Explanation

Correct Answer

A:

At Greenfield Rail Logistics, while moving a workload between leaves, correct the tenant gateway address and routing-instance binding for the new subnet. This addresses the specific failure mechanism (The IP-VRF gateway prefix was copied from a different tenant service) rather than treating only the visible alarm. The required acceptance evidence is: The host sees the intended gateway and unrelated tenant gateways are unchanged.

Incorrect Answers

B:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Align the selected asymmetric or symmetric L3 EVPN model with deployed tenant subnets. This option assumes the other problem (An asymmetric routed overlay cannot send traffic when the destination subnet is absent locally) is present. The case instead describes A tenant interface uses the wrong virtual-router gateway address after a new subnet is created, for which the causal issue is The IP-VRF gateway prefix was copied from a different tenant service.

C:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Reconcile local VLAN tagging, MAC-VRF and VXLAN VNI membership across leaves. It tests a different symptom: Local switching works on a leaf but remote same-VNI switching fails after a VLAN change. For the observed case, the relevant distinction is The IP-VRF gateway prefix was copied from a different tenant service, with verification: The host sees the intended gateway and unrelated tenant gateways are unchanged.

D:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Validate local bridge attachment and the EVPN MAC/IP export for the affected service. The option describes a different failure mode: A leaf reports healthy EVPN neighbors but has no Type 2 MAC/IP routes for a new VLAN. It would address The new MAC-VRF lacks correct endpoint learning or EVPN service advertisement, but here the case reports A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. The current required evidence is: The host sees the intended gateway and unrelated tenant gateways are unchanged.

Question 498

At Greenfield Rail Logistics, while moving a workload between leaves, the data center fabric team observes: A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. What test result proves the affected fabric function now works?

  1. A controlled ARP request resolves the remote endpoint and unicast traffic succeeds
  2. The EVPN next hop resolves and a controlled tenant flow succeeds
  3. Both remote leaves converge to the new VTEP location after a controlled move
  4. The host sees the intended gateway and unrelated tenant gateways are unchanged

Explanation

Correct Answer

D:

At Greenfield Rail Logistics, while moving a workload between leaves, the host sees the intended gateway and unrelated tenant gateways are unchanged. This is linked directly to the observed symptom (A tenant interface uses the wrong virtual-router gateway address after a new subnet is created) and cannot be replaced by an unrelated healthy dashboard.

Incorrect Answers

A:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: A controlled ARP request resolves the remote endpoint and unicast traffic succeeds. This option assumes the other problem (Two virtual machines share a subnet across leaves but ARP requests fail to discover their peers) is present. The case instead describes A tenant interface uses the wrong virtual-router gateway address after a new subnet is created, for which the causal issue is The IP-VRF gateway prefix was copied from a different tenant service.

B:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: The EVPN next hop resolves and a controlled tenant flow succeeds. It tests a different symptom: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. For the observed case, the relevant distinction is The IP-VRF gateway prefix was copied from a different tenant service, with verification: The host sees the intended gateway and unrelated tenant gateways are unchanged.

C:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Both remote leaves converge to the new VTEP location after a controlled move. The option describes a different failure mode: A relocated virtual machine is reachable from one leaf but stale on another. It would address The old EVPN MAC/IP advertisement has not been updated or withdrawn after the move, but here the case reports A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. The current required evidence is: The host sees the intended gateway and unrelated tenant gateways are unchanged.

Question 499

At Greenfield Rail Logistics, while moving a workload between leaves, the data center fabric team observes: A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. What specific misconfiguration or design error is most likely?

  1. The IP-VRF gateway prefix was copied from a different tenant service
  2. The overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path
  3. MAC and IP binding dissemination is incomplete for the endpoint advertisement
  4. Two MAC-VRFs share an unintended service attachment or VNI mapping

Explanation

Correct Answer

A:

At Greenfield Rail Logistics, while moving a workload between leaves, for Greenfield Rail Logistics, investigate this cause first: The IP-VRF gateway prefix was copied from a different tenant service. It is directly linked to the observed symptom rather than another service issue.

Incorrect Answers

B:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: The overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path. The option describes a different failure mode: A multi-leaf EVPN service intermittently fails after a spine path changes. It would address The overlay's remote VTEP reachability depends on an unhealthy or missing underlay ECMP path, but here the case reports A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. The current required evidence is: The host sees the intended gateway and unrelated tenant gateways are unchanged.

C:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: MAC and IP binding dissemination is incomplete for the endpoint advertisement. That choice would be more relevant when this different symptom occurs: A leaf learns a remote host's MAC but not its expected IP information. The present scenario instead points to: The IP-VRF gateway prefix was copied from a different tenant service. The correct resolution has its own verification outcome: The host sees the intended gateway and unrelated tenant gateways are unchanged.

D:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Two MAC-VRFs share an unintended service attachment or VNI mapping. This is a valid category of fabric maintenance for another scenario (An EVPN change accidentally exposes one tenant's broadcast traffic to another), not the targeted action for Greenfield Rail Logistics. The distinction is the actual cause: The IP-VRF gateway prefix was copied from a different tenant service.

Question 500

At Greenfield Rail Logistics, while moving a workload between leaves, the data center fabric team observes: A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. What repeatable acceptance check would reduce recurrence?

  1. Account for tunnel overhead when selecting underlay interface MTU
  2. Check overlay next-hop resolution after changes to underlay advertisement
  3. Test per-tenant gateway addressing during subnet provisioning
  4. Gate overlay validation on underlay VTEP-address reachability

Explanation

Correct Answer

C:

At Greenfield Rail Logistics, while moving a workload between leaves, for Greenfield Rail Logistics, include the safeguard: Test per-tenant gateway addressing during subnet provisioning. It reduces repeat risk from the original mechanism and complements a validation of: The host sees the intended gateway and unrelated tenant gateways are unchanged.

Incorrect Answers

A:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Account for tunnel overhead when selecting underlay interface MTU. The option describes a different failure mode: An overlay forwarding issue affects only jumbo-sized packets. It would address The routed underlay MTU does not accommodate the additional VXLAN encapsulation overhead, but here the case reports A tenant interface uses the wrong virtual-router gateway address after a new subnet is created. The current required evidence is: The host sees the intended gateway and unrelated tenant gateways are unchanged.

B:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Check overlay next-hop resolution after changes to underlay advertisement. That choice would be more relevant when this different symptom occurs: An EVPN route is imported but its next-hop resolves to an inaccessible loopback. The present scenario instead points to: The IP-VRF gateway prefix was copied from a different tenant service. The correct resolution has its own verification outcome: The host sees the intended gateway and unrelated tenant gateways are unchanged.

D:

At Greenfield Rail Logistics, while moving a workload between leaves, this option proposes: Gate overlay validation on underlay VTEP-address reachability. Although related to EVPN, VXLAN, MAC-VRF and IP-VRF overlays, the proposed change fits another mechanism: The VTEP source address is not reachable in the routed underlay. The evidence in the current case requires a different result: The host sees the intended gateway and unrelated tenant gateways are unchanged.