Question 290
Ridgeview Finance manages transaction reporting SAN and audit shares with a limited change window. A storage incident report states: A high-bandwidth NAS share is connected through an unplanned single slow uplink while the required service target needs more capacity. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?
Explanation
Correct Answer
A load test achieves the planned bandwidth and survives loss of one approved member link. The observation verifies that the chosen action (Evaluate link speed, supported interface aggregation and redundant path design against measured throughput) has corrected the initiating failure (A high-bandwidth NAS share is connected through an unplanned single slow uplink while the required service target needs more capacity). This is directly measurable for Ridgeview Finance's transaction reporting SAN and audit shares rather than merely reporting task completion.
Incorrect Answers
Cluster network health remains stable under a representative client traffic load. This is a valid test for another condition (A cluster interconnect switch is reused for arbitrary client traffic without checking the supported cluster switch topology) after a different correction (Separate supported cluster networking from data access networking in the physical design). It does not establish the necessary result for Ridgeview Finance's transaction reporting SAN and audit shares: A load test achieves the planned bandwidth and survives loss of one approved member link.
Operators reach each management endpoint through the controlled subnet without cross-tenant leakage. This is a valid test for another condition (A two-node design mixes cluster node-management LIFs with remote client IPspaces and creates ambiguous administration routes) after a different correction (Plan management and data interface separation using appropriate network scopes and gateways). It does not establish the necessary result for Ridgeview Finance's transaction reporting SAN and audit shares: A load test achieves the planned bandwidth and survives loss of one approved member link.
A port-outage rehearsal moves the NAS LIF to an allowed healthy port and restores reachability. This is a valid test for another condition (A NAS client reaches one data LIF but fails after a planned port outage because no alternative data path exists) after a different correction (Design data LIF failover groups and home-port policies for supported NAS high availability). It does not establish the necessary result for Ridgeview Finance's transaction reporting SAN and audit shares: A load test achieves the planned bandwidth and survives loss of one approved member link.