Question 120
Seabright Municipal Works manages infrastructure records and file archives during a controlled maintenance window. A storage incident report states: An HA pair is healthy but the team mistakes routine controller takeover for cross-site disaster recovery. The team reports that the correction is complete. Which observation BEST proves the stated problem is resolved?
Explanation
Correct Answer
The design demonstrates node-failure continuity separately from a documented site-failure recovery test. The observation verifies that the chosen action (Distinguish local HA takeover and giveback from separate cross-site replication and recovery architecture) has corrected the initiating failure (An HA pair is healthy but the team mistakes routine controller takeover for cross-site disaster recovery). This is directly measurable for Seabright Municipal Works's infrastructure records and file archives rather than merely reporting task completion.
Incorrect Answers
Giveback completes without stranded aggregates and both controllers return to healthy ownership. This is a valid test for another condition (An administrator issues giveback while partner healing and disk path faults remain unresolved) after a different correction (Resolve reported takeover/giveback blockers and verify storage paths before restoring the original owner). It does not establish the necessary result for Seabright Municipal Works's infrastructure records and file archives: The design demonstrates node-failure continuity separately from a documented site-failure recovery test.
Local tiers return to their expected owners and partner health checks show normal HA operation. This is a valid test for another condition (After maintenance, one controller continues serving its partner's local tiers because giveback was never reviewed) after a different correction (Review HA ownership and run a supported giveback after all partner issues have cleared). It does not establish the necessary result for Seabright Municipal Works's infrastructure records and file archives: The design demonstrates node-failure continuity separately from a documented site-failure recovery test.
A supervised takeover leaves client access within limits and the partner assumes the intended resources. This is a valid test for another condition (A controller maintenance window begins before the engineer checks whether its HA partner can accept takeover) after a different correction (Inspect partner health, aggregate ownership and takeover readiness before initiating a controlled handoff). It does not establish the necessary result for Seabright Municipal Works's infrastructure records and file archives: The design demonstrates node-failure continuity separately from a documented site-failure recovery test.