Question 290
At fictional Willowfield Public Library, the storage hardware support lead is conducting a documented change review with independent client access verification. The independent original support incident is: Capacity monitoring shows the surviving HA node would be saturated if the adjacent controller failed during the nightly workload peak. Use only documented facts, authorized field-service boundaries and platform/version-specific vendor guidance. Which repeatable maintenance or assurance control best prevents this particular condition from recurring?
Explanation
Writer-proposed answer: B (UNVERIFIED)
Preliminary individual option explanations — NOT expert validated
Correct Answer
Nominal HA pairing alone is not proof of sufficient peak workload capacity after takeover. Partner CPU, memory and I/O headroom meet service objectives under the documented failover scenario.
Incorrect Answers
This response concerns Failover test performed during production peak. Here, capacity monitoring shows the surviving HA node would be saturated if the adjacent controller failed during the nightly workload peak. The confirming evidence is: Partner CPU, memory and I/O headroom meet service objectives under the documented failover scenario.
Focusing on Unplanned auto-giveback after diagnostic boot would leave this problem unresolved: Capacity monitoring shows the surviving HA node would be saturated if the adjacent controller failed during the nightly workload peak.
Giveback veto during partner recovery concerns another aspect of the problem. Nominal HA pairing alone is not proof of sufficient peak workload capacity after takeover.