Question 180
At fictional Mossfield Education Board, the storage hardware support lead is conducting a scheduled rack maintenance with production change approval. The independent original support incident is: A rack relocation inspection finds that the storage equipment bonding record is missing even though all controllers currently report healthy status. Use only documented facts, authorized field-service boundaries and platform/version-specific vendor guidance. Which repeatable maintenance or assurance control best prevents this particular condition from recurring?
Explanation
Writer-proposed answer: D (UNVERIFIED)
Preliminary individual option explanations — NOT expert validated
Correct Answer
Electrical safety and grounding are independent acceptance requirements beyond software health indicators. Facilities test records confirm acceptable grounding and the new rack as-built documentation is updated.
Incorrect Answers
This response concerns Power restoration sequencing risk. Here, a rack relocation inspection finds that the storage equipment bonding record is missing even though all controllers currently report healthy status. The confirming evidence is: Facilities test records confirm acceptable grounding and the new rack as-built documentation is updated.
Controller NVRAM health alert concerns a different operational mechanism. Electrical safety and grounding are independent acceptance requirements beyond software health indicators.
Focusing on Unlabeled controller front-panel cable would leave this problem unresolved: A rack relocation inspection finds that the storage equipment bonding record is missing even though all controllers currently report healthy status.