Question 930
Fictional Greenbank Processing Sites is completing an OT security acceptance specification meeting with plant engineering and operations personnel. During an operator-led risk workshop, the case presents this industrial security assessment concern: A plant bid requires daily PLC backups but never describes how to validate integrity or safely restore a working controller configuration. The team must prioritize safe operation, authorized assessment methods, and evidence from the actual process environment. Which maintenance or change-trigger review should accompany the proposed decision?
Explanation
Correct Answer
Retest recovery requirements after firmware, engineering tools, and controller application changes. That recurring check targets the underlying weakness: the existence of backup files does not establish that recovered software will be trustworthy, compatible, or safe to operate.
Incorrect Answers
Tie controller additions and cabinet modifications to asset-register updates and periodic reconciliation. Unlisted control assets cannot be evaluated for credible exposure, supportability, or consequences simply by counting servers. The relevant follow-up is: Retest recovery requirements after firmware, engineering tools, and controller application changes.
Require device-specific safe-discovery approval whenever assessment tools or control hardware change. Industrial devices may react unpredictably to unexpected traffic even when conventional IT scanners consider probes nonintrusive. The relevant follow-up is: Retest recovery requirements after firmware, engineering tools, and controller application changes.
Reassess capture coverage after network redesign, controller redundancy changes, and new segmented links. Passive collection cannot prove absence of a vulnerability on network paths it never monitored. The relevant follow-up is: Retest recovery requirements after firmware, engineering tools, and controller application changes.