Question 140
Fictional Riverside Industrial Systems is completing a control network inventory review with plant engineering and operations personnel. During a scheduled risk register update, the case presents this industrial security assessment concern: An industrial historian sends production statistics to corporate reporting, but assessors treat the link as read-only without inspecting return sessions. The team must prioritize safe operation, authorized assessment methods, and evidence from the actual process environment. Which repeatable governance check should keep the assessment finding current?
Explanation
Correct Answer
Revalidate trust-boundary flow details after historian, firewall, or enterprise reporting changes. That recurring check targets the underlying weakness: a business intent to export read-only process data does not prove the supporting network session cannot carry inbound control traffic.
Incorrect Answers
Renew the ownership matrix when a facility changes operating company, control integrator, or on-call management structure. Risk findings are actionable only when responsible people can authorize evidence collection and subsequent treatment decisions. The relevant follow-up is: Revalidate trust-boundary flow details after historian, firewall, or enterprise reporting changes.
Trigger as-built scope reconciliation whenever telemetry radios, remote stations, or backbone infrastructure change. Existing industrial systems accumulate architecture changes that can invalidate old threat assumptions and assessment coverage. The relevant follow-up is: Revalidate trust-boundary flow details after historian, firewall, or enterprise reporting changes.
Revisit rare-event likelihood assumptions after threat intelligence, architecture changes, and new consequence evidence. Lack of recorded incidents over a short period does not prove a rare high-consequence event cannot occur. The relevant follow-up is: Revalidate trust-boundary flow details after historian, firewall, or enterprise reporting changes.