"HCIP-Datacom-Core Technology V1.0 Exam", also known as H12-821 exam, is a Huawei certification exam.

Pass your tests with the always up-to-date H12-821 Exam Engine. Your H12-821 training materials keep you at the head of the pack!

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Was: $137.49
Now: $124.99

Huawei H12-821 Practice Test 30

Question 290

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-073 — Carrier edge route recursion. Recorded evidence: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. After performing the targeted correction, which case-specific observation would best show that it worked?

  1. The adjacency stays Up at the supported MTU.
  2. Level-two adjacency forms and advertised core routes are reachable.
  3. IS-IS best prefix installs with a resolvable next hop.
  4. The predicted DIS matches configured priority and tie-break values.

Explanation

Correct Answer

C:

This directly verifies remediation of the described issue, SPF-derived route installation requires valid interface and adjacency resolution. The repair was: Repair forwarding next-hop adjacency and verify SPF output. The initial observation was: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. This specific outcome, IS-IS best prefix installs with a resolvable next hop, is more probative than a generic interface-up or routing-up status.

Incorrect Answers

A:

Incorrect for this specific incident. The alternate result would validate a different root issue, IS-IS hello padding or supported circuit MTU is incompatible, triggered by: IS-IS hello adjacency fails after a link MTU reduction despite valid Layer-3 pings. Here the documented failure is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. Verify the correction by checking: IS-IS best prefix installs with a resolvable next hop.

B:

Incorrect for this specific incident. The alternate result would validate a different root issue, There is no common configured IS-IS level on the transit link, triggered by: A router advertises a WAN peer as IS-IS L1-only while that peer is core L2-only. Here the documented failure is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. Verify the correction by checking: IS-IS best prefix installs with a resolvable next hop.

D:

Incorrect for this specific incident. The alternate result would validate a different root issue, IS-IS DIS election tie behavior depends on system-identification ordering, triggered by: A LAN DIS winner differs from engineers' expectation after equal priorities. Here the documented failure is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. Verify the correction by checking: IS-IS best prefix installs with a resolvable next hop.

Question 291

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-073 — Carrier edge route recursion. Recorded evidence: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. Which routing, switching, security, or service issue most directly accounts for this evidence?

  1. SPF-derived route installation requires valid interface and adjacency resolution.
  2. There is no common configured IS-IS level on the transit link.
  3. IS-IS DIS election tie behavior depends on system-identification ordering.
  4. IS-IS hello padding or supported circuit MTU is incompatible.

Explanation

Correct Answer

A:

Correct for the stated facts. The observation — L2 LSDB contains a prefix but the route is unusable because next hop is unresolved — supports: SPF-derived route installation requires valid interface and adjacency resolution. The intended next step is: Repair forwarding next-hop adjacency and verify SPF output. Confirmation of the diagnosis should include: IS-IS best prefix installs with a resolvable next hop. Real environments may have additional causes requiring testing.

Incorrect Answers

B:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: A router advertises a WAN peer as IS-IS L1-only while that peer is core L2-only. In the current case the observed condition is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved; the more directly supported issue is: SPF-derived route installation requires valid interface and adjacency resolution. Its targeted correction is: Repair forwarding next-hop adjacency and verify SPF output.

C:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: A LAN DIS winner differs from engineers' expectation after equal priorities. In the current case the observed condition is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved; the more directly supported issue is: SPF-derived route installation requires valid interface and adjacency resolution. Its targeted correction is: Repair forwarding next-hop adjacency and verify SPF output.

D:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: IS-IS hello adjacency fails after a link MTU reduction despite valid Layer-3 pings. In the current case the observed condition is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved; the more directly supported issue is: SPF-derived route installation requires valid interface and adjacency resolution. Its targeted correction is: Repair forwarding next-hop adjacency and verify SPF output.

Question 292

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-073 — Carrier edge route recursion. Recorded evidence: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. Which post-change control would best detect recurrence of the same identified failure?

  1. Add a change-acceptance check requiring this evidence: The adjacency stays Up at the supported MTU. Escalate recurrence of this warning sign: IS-IS hello adjacency fails after a link MTU reduction despite valid Layer-3 pings.
  2. Add a change-acceptance check requiring this evidence: IS-IS best prefix installs with a resolvable next hop. Escalate recurrence of this warning sign: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved.
  3. Add a change-acceptance check requiring this evidence: The predicted DIS matches configured priority and tie-break values. Escalate recurrence of this warning sign: A LAN DIS winner differs from engineers' expectation after equal priorities.
  4. Add a change-acceptance check requiring this evidence: Level-two adjacency forms and advertised core routes are reachable. Escalate recurrence of this warning sign: A router advertises a WAN peer as IS-IS L1-only while that peer is core L2-only.

Explanation

Correct Answer

B:

The proposed acceptance gate watches for: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved; it checks for: IS-IS best prefix installs with a resolvable next hop. This directly targets recurrence of the issue: SPF-derived route installation requires valid interface and adjacency resolution. This preventive check is derived from the case evidence, not independently validated by a Huawei product engineer.

Incorrect Answers

A:

Incorrect for this recurring fault. That gate monitors a different signal: IS-IS hello adjacency fails after a link MTU reduction despite valid Layer-3 pings. Here the critical observation is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. The matching acceptance criterion is: IS-IS best prefix installs with a resolvable next hop. These are distinct fault-control pairs.

C:

Incorrect for this recurring fault. That gate monitors a different signal: A LAN DIS winner differs from engineers' expectation after equal priorities. Here the critical observation is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. The matching acceptance criterion is: IS-IS best prefix installs with a resolvable next hop. These are distinct fault-control pairs.

D:

Incorrect for this recurring fault. That gate monitors a different signal: A router advertises a WAN peer as IS-IS L1-only while that peer is core L2-only. Here the critical observation is: L2 LSDB contains a prefix but the route is unusable because next hop is unresolved. The matching acceptance criterion is: IS-IS best prefix installs with a resolvable next hop. These are distinct fault-control pairs.

Question 293

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-074 — Retail LAN system ID tie. Recorded evidence: A LAN DIS winner differs from engineers' expectation after equal priorities. Which focused network-engineering action best addresses this observed issue while preserving unrelated controls?

  1. Assign unique system IDs and verify NETs.
  2. Inspect LAN circuit priorities and tie-break conditions.
  3. Configure a unique system ID and valid area address in the NET.
  4. Fix link stability and monitor LSP sequence changes.

Explanation

Correct Answer

B:

Correct for this fictional network case. Evidence: A LAN DIS winner differs from engineers' expectation after equal priorities. The underlying issue is: IS-IS DIS election tie behavior depends on system-identification ordering. The targeted action is: Inspect LAN circuit priorities and tie-break conditions. The validating outcome is: The predicted DIS matches configured priority and tie-break values. Verify on an authorized lab or network before using this intervention in production.

Incorrect Answers

A:

Incorrect for the evidence given. This adjustment better addresses another fictional incident whose symptom is: Two IS-IS devices advertise the same six-byte system ID across a shared domain. That other issue is: A duplicate system ID invalidates unique LSP ownership. Here, A LAN DIS winner differs from engineers' expectation after equal priorities, so the more direct targeted action is: Inspect LAN circuit priorities and tie-break conditions.

C:

Incorrect for the evidence given. This adjustment better addresses another fictional incident whose symptom is: A router with IP addresses configured cannot start an IS-IS adjacency without a network entity title. That other issue is: IS-IS requires a correctly formed NET to identify its system and area. Here, A LAN DIS winner differs from engineers' expectation after equal priorities, so the more direct targeted action is: Inspect LAN circuit priorities and tie-break conditions.

D:

Incorrect for the evidence given. This adjustment better addresses another fictional incident whose symptom is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. That other issue is: IS-IS topology instability is rooted in a flapping physical circuit. Here, A LAN DIS winner differs from engineers' expectation after equal priorities, so the more direct targeted action is: Inspect LAN circuit priorities and tie-break conditions.

Question 294

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-074 — Retail LAN system ID tie. Recorded evidence: A LAN DIS winner differs from engineers' expectation after equal priorities. After performing the targeted correction, which case-specific observation would best show that it worked?

  1. LSP updates and SPF cycles stabilize.
  2. The predicted DIS matches configured priority and tie-break values.
  3. Every LSP has unambiguous system ownership.
  4. IS-IS reports the intended NET and begins level-appropriate adjacency.

Explanation

Correct Answer

B:

This directly verifies remediation of the described issue, IS-IS DIS election tie behavior depends on system-identification ordering. The repair was: Inspect LAN circuit priorities and tie-break conditions. The initial observation was: A LAN DIS winner differs from engineers' expectation after equal priorities. This specific outcome, The predicted DIS matches configured priority and tie-break values, is more probative than a generic interface-up or routing-up status.

Incorrect Answers

A:

Incorrect for this specific incident. The alternate result would validate a different root issue, IS-IS topology instability is rooted in a flapping physical circuit, triggered by: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Here the documented failure is: A LAN DIS winner differs from engineers' expectation after equal priorities. Verify the correction by checking: The predicted DIS matches configured priority and tie-break values.

C:

Incorrect for this specific incident. The alternate result would validate a different root issue, A duplicate system ID invalidates unique LSP ownership, triggered by: Two IS-IS devices advertise the same six-byte system ID across a shared domain. Here the documented failure is: A LAN DIS winner differs from engineers' expectation after equal priorities. Verify the correction by checking: The predicted DIS matches configured priority and tie-break values.

D:

Incorrect for this specific incident. The alternate result would validate a different root issue, IS-IS requires a correctly formed NET to identify its system and area, triggered by: A router with IP addresses configured cannot start an IS-IS adjacency without a network entity title. Here the documented failure is: A LAN DIS winner differs from engineers' expectation after equal priorities. Verify the correction by checking: The predicted DIS matches configured priority and tie-break values.

Question 295

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-074 — Retail LAN system ID tie. Recorded evidence: A LAN DIS winner differs from engineers' expectation after equal priorities. Which routing, switching, security, or service issue most directly accounts for this evidence?

  1. IS-IS DIS election tie behavior depends on system-identification ordering.
  2. IS-IS requires a correctly formed NET to identify its system and area.
  3. A duplicate system ID invalidates unique LSP ownership.
  4. IS-IS topology instability is rooted in a flapping physical circuit.

Explanation

Correct Answer

A:

Correct for the stated facts. The observation — A LAN DIS winner differs from engineers' expectation after equal priorities — supports: IS-IS DIS election tie behavior depends on system-identification ordering. The intended next step is: Inspect LAN circuit priorities and tie-break conditions. Confirmation of the diagnosis should include: The predicted DIS matches configured priority and tie-break values. Real environments may have additional causes requiring testing.

Incorrect Answers

B:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: A router with IP addresses configured cannot start an IS-IS adjacency without a network entity title. In the current case the observed condition is: A LAN DIS winner differs from engineers' expectation after equal priorities; the more directly supported issue is: IS-IS DIS election tie behavior depends on system-identification ordering. Its targeted correction is: Inspect LAN circuit priorities and tie-break conditions.

C:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: Two IS-IS devices advertise the same six-byte system ID across a shared domain. In the current case the observed condition is: A LAN DIS winner differs from engineers' expectation after equal priorities; the more directly supported issue is: IS-IS DIS election tie behavior depends on system-identification ordering. Its targeted correction is: Inspect LAN circuit priorities and tie-break conditions.

D:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. In the current case the observed condition is: A LAN DIS winner differs from engineers' expectation after equal priorities; the more directly supported issue is: IS-IS DIS election tie behavior depends on system-identification ordering. Its targeted correction is: Inspect LAN circuit priorities and tie-break conditions.

Question 296

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-074 — Retail LAN system ID tie. Recorded evidence: A LAN DIS winner differs from engineers' expectation after equal priorities. Which post-change control would best detect recurrence of the same identified failure?

  1. Add a change-acceptance check requiring this evidence: The predicted DIS matches configured priority and tie-break values. Escalate recurrence of this warning sign: A LAN DIS winner differs from engineers' expectation after equal priorities.
  2. Add a change-acceptance check requiring this evidence: LSP updates and SPF cycles stabilize. Escalate recurrence of this warning sign: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions.
  3. Add a change-acceptance check requiring this evidence: Every LSP has unambiguous system ownership. Escalate recurrence of this warning sign: Two IS-IS devices advertise the same six-byte system ID across a shared domain.
  4. Add a change-acceptance check requiring this evidence: IS-IS reports the intended NET and begins level-appropriate adjacency. Escalate recurrence of this warning sign: A router with IP addresses configured cannot start an IS-IS adjacency without a network entity title.

Explanation

Correct Answer

A:

The proposed acceptance gate watches for: A LAN DIS winner differs from engineers' expectation after equal priorities; it checks for: The predicted DIS matches configured priority and tie-break values. This directly targets recurrence of the issue: IS-IS DIS election tie behavior depends on system-identification ordering. This preventive check is derived from the case evidence, not independently validated by a Huawei product engineer.

Incorrect Answers

B:

Incorrect for this recurring fault. That gate monitors a different signal: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Here the critical observation is: A LAN DIS winner differs from engineers' expectation after equal priorities. The matching acceptance criterion is: The predicted DIS matches configured priority and tie-break values. These are distinct fault-control pairs.

C:

Incorrect for this recurring fault. That gate monitors a different signal: Two IS-IS devices advertise the same six-byte system ID across a shared domain. Here the critical observation is: A LAN DIS winner differs from engineers' expectation after equal priorities. The matching acceptance criterion is: The predicted DIS matches configured priority and tie-break values. These are distinct fault-control pairs.

D:

Incorrect for this recurring fault. That gate monitors a different signal: A router with IP addresses configured cannot start an IS-IS adjacency without a network entity title. Here the critical observation is: A LAN DIS winner differs from engineers' expectation after equal priorities. The matching acceptance criterion is: The predicted DIS matches configured priority and tie-break values. These are distinct fault-control pairs.

Question 297

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-075 — Manufacturing WAN SPF churn. Recorded evidence: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Which focused network-engineering action best addresses this observed issue while preserving unrelated controls?

  1. Restrict default leaking to the intended direction and reachable exit.
  2. Align an allowed common area address or use level-two connectivity.
  3. Fix link stability and monitor LSP sequence changes.
  4. Enable supported IPv6 IS-IS advertisements on the intended interfaces.

Explanation

Correct Answer

C:

Correct for this fictional network case. Evidence: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. The underlying issue is: IS-IS topology instability is rooted in a flapping physical circuit. The targeted action is: Fix link stability and monitor LSP sequence changes. The validating outcome is: LSP updates and SPF cycles stabilize. Verify on an authorized lab or network before using this intervention in production.

Incorrect Answers

A:

Incorrect for the evidence given. This adjustment better addresses another fictional incident whose symptom is: L1/L2 devices leak defaults into both levels and create circular forwarding. That other issue is: Improper inter-level default injection introduces a routing loop. Here, Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions, so the more direct targeted action is: Fix link stability and monitor LSP sequence changes.

B:

Incorrect for the evidence given. This adjustment better addresses another fictional incident whose symptom is: L1 neighbors in different areas fail to establish a level-one adjacency. That other issue is: IS-IS level-one adjacency normally requires matching area addresses. Here, Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions, so the more direct targeted action is: Fix link stability and monitor LSP sequence changes.

D:

Incorrect for the evidence given. This adjustment better addresses another fictional incident whose symptom is: IPv6 reachability is missing over IS-IS while IPv4 still converges. That other issue is: The required IPv6 routing capability or topology advertisement is disabled. Here, Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions, so the more direct targeted action is: Fix link stability and monitor LSP sequence changes.

Question 298

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-075 — Manufacturing WAN SPF churn. Recorded evidence: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. After performing the targeted correction, which case-specific observation would best show that it worked?

  1. Adjacency establishes at the planned level.
  2. LSP updates and SPF cycles stabilize.
  3. Traffic exits through a unique supported backbone path.
  4. IPv6 prefixes appear in appropriate IS-IS routing tables.

Explanation

Correct Answer

B:

This directly verifies remediation of the described issue, IS-IS topology instability is rooted in a flapping physical circuit. The repair was: Fix link stability and monitor LSP sequence changes. The initial observation was: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. This specific outcome, LSP updates and SPF cycles stabilize, is more probative than a generic interface-up or routing-up status.

Incorrect Answers

A:

Incorrect for this specific incident. The alternate result would validate a different root issue, IS-IS level-one adjacency normally requires matching area addresses, triggered by: L1 neighbors in different areas fail to establish a level-one adjacency. Here the documented failure is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Verify the correction by checking: LSP updates and SPF cycles stabilize.

C:

Incorrect for this specific incident. The alternate result would validate a different root issue, Improper inter-level default injection introduces a routing loop, triggered by: L1/L2 devices leak defaults into both levels and create circular forwarding. Here the documented failure is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Verify the correction by checking: LSP updates and SPF cycles stabilize.

D:

Incorrect for this specific incident. The alternate result would validate a different root issue, The required IPv6 routing capability or topology advertisement is disabled, triggered by: IPv6 reachability is missing over IS-IS while IPv4 still converges. Here the documented failure is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Verify the correction by checking: LSP updates and SPF cycles stabilize.

Question 299

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-075 — Manufacturing WAN SPF churn. Recorded evidence: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Which routing, switching, security, or service issue most directly accounts for this evidence?

  1. The required IPv6 routing capability or topology advertisement is disabled.
  2. IS-IS topology instability is rooted in a flapping physical circuit.
  3. IS-IS level-one adjacency normally requires matching area addresses.
  4. Improper inter-level default injection introduces a routing loop.

Explanation

Correct Answer

B:

Correct for the stated facts. The observation — Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions — supports: IS-IS topology instability is rooted in a flapping physical circuit. The intended next step is: Fix link stability and monitor LSP sequence changes. Confirmation of the diagnosis should include: LSP updates and SPF cycles stabilize. Real environments may have additional causes requiring testing.

Incorrect Answers

A:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: IPv6 reachability is missing over IS-IS while IPv4 still converges. In the current case the observed condition is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions; the more directly supported issue is: IS-IS topology instability is rooted in a flapping physical circuit. Its targeted correction is: Fix link stability and monitor LSP sequence changes.

C:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: L1 neighbors in different areas fail to establish a level-one adjacency. In the current case the observed condition is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions; the more directly supported issue is: IS-IS topology instability is rooted in a flapping physical circuit. Its targeted correction is: Fix link stability and monitor LSP sequence changes.

D:

Incorrect for the supplied symptom. This diagnosis matches a different example in which: L1/L2 devices leak defaults into both levels and create circular forwarding. In the current case the observed condition is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions; the more directly supported issue is: IS-IS topology instability is rooted in a flapping physical circuit. Its targeted correction is: Fix link stability and monitor LSP sequence changes.

Question 300

Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-075 — Manufacturing WAN SPF churn. Recorded evidence: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. Which post-change control would best detect recurrence of the same identified failure?

  1. Add a change-acceptance check requiring this evidence: IPv6 prefixes appear in appropriate IS-IS routing tables. Escalate recurrence of this warning sign: IPv6 reachability is missing over IS-IS while IPv4 still converges.
  2. Add a change-acceptance check requiring this evidence: Adjacency establishes at the planned level. Escalate recurrence of this warning sign: L1 neighbors in different areas fail to establish a level-one adjacency.
  3. Add a change-acceptance check requiring this evidence: Traffic exits through a unique supported backbone path. Escalate recurrence of this warning sign: L1/L2 devices leak defaults into both levels and create circular forwarding.
  4. Add a change-acceptance check requiring this evidence: LSP updates and SPF cycles stabilize. Escalate recurrence of this warning sign: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions.

Explanation

Correct Answer

D:

The proposed acceptance gate watches for: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions; it checks for: LSP updates and SPF cycles stabilize. This directly targets recurrence of the issue: IS-IS topology instability is rooted in a flapping physical circuit. This preventive check is derived from the case evidence, not independently validated by a Huawei product engineer.

Incorrect Answers

A:

Incorrect for this recurring fault. That gate monitors a different signal: IPv6 reachability is missing over IS-IS while IPv4 still converges. Here the critical observation is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. The matching acceptance criterion is: LSP updates and SPF cycles stabilize. These are distinct fault-control pairs.

B:

Incorrect for this recurring fault. That gate monitors a different signal: L1 neighbors in different areas fail to establish a level-one adjacency. Here the critical observation is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. The matching acceptance criterion is: LSP updates and SPF cycles stabilize. These are distinct fault-control pairs.

C:

Incorrect for this recurring fault. That gate monitors a different signal: L1/L2 devices leak defaults into both levels and create circular forwarding. Here the critical observation is: Frequent IS-IS SPF runs coincide with intermittent physical carrier transitions. The matching acceptance criterion is: LSP updates and SPF cycles stabilize. These are distinct fault-control pairs.