Question 1180
Original unofficial Huawei H12-821 V1.0 practice scenario R182-CASE-295 — Corporate campus redesign. Recorded evidence: A campus design places every departmental subnet in one flat bridge domain. Which post-change control would best detect recurrence of the same identified failure?
Explanation
Correct Answer
The proposed acceptance gate watches for: A campus design places every departmental subnet in one flat bridge domain; it checks for: Department isolation and failure domains match design targets. This directly targets recurrence of the issue: Flat Layer-2 broadcast scope conflicts with required segmentation and resilience. This preventive check is derived from the case evidence, not independently validated by a Huawei product engineer.
Incorrect Answers
Incorrect for this recurring fault. That gate monitors a different signal: A proposed multi-rack fabric connects all leaves in a chain rather than through spines. Here the critical observation is: A campus design places every departmental subnet in one flat bridge domain. The matching acceptance criterion is: Department isolation and failure domains match design targets. These are distinct fault-control pairs.
Incorrect for this recurring fault. That gate monitors a different signal: Branch policies diverge after manual per-device edits despite centralized intent. Here the critical observation is: A campus design places every departmental subnet in one flat bridge domain. The matching acceptance criterion is: Department isolation and failure domains match design targets. These are distinct fault-control pairs.
Incorrect for this recurring fault. That gate monitors a different signal: Cutover plan removes the original MPLS link before SD-WAN overlay tunnels prove reachability. Here the critical observation is: A campus design places every departmental subnet in one flat bridge domain. The matching acceptance criterion is: Department isolation and failure domains match design targets. These are distinct fault-control pairs.