Question 160
At Dunhaven University, the campus systems team is preparing a multi-building classroom network upgrade. The operational constraint is classroom Wi-Fi and VoIP availability. The owner reports that the correction is complete for this issue: Two data-center switches must connect at short range but the purchasing team orders an optic/DAC combination incompatible with the platform. Which result BEST demonstrates that this specific issue was resolved?
Explanation
Correct Answer
The supported part numbers pass physical link validation on both interfaces. This is the relevant acceptance observation for the reported issue: Two data-center switches must connect at short range but the purchasing team orders an optic/DAC combination incompatible with the platform. The intended corrective choice is: Use the vendor-supported DAC or transceiver/cable combination for the specified distance and interface. At Dunhaven University, this outcome verifies actual operation under classroom Wi-Fi and VoIP availability, rather than only a ticket marked complete.
Incorrect Answers
Power telemetry shows adequate headroom and all designated endpoints boot without PoE-denial events. Such an observation would verify a separate issue: A new access switch powers phones but several higher-draw APs fail to start when all ports are populated. It would follow the distinct action: Verify PSU sizing, PoE mode and per-port allocation against concurrent load. Here the reported failure is Two data-center switches must connect at short range but the purchasing team orders an optic/DAC combination incompatible with the platform. The decisive result for Dunhaven University must instead be: The supported part numbers pass physical link validation on both interfaces.
Both sides report a stable negotiated link with supported optics and acceptable signal levels. Such an observation would verify a separate issue: An uplink module fits physically but fails to establish a link because the optic speed is unsupported on the port. It would follow the distinct action: Check transceiver compatibility, supported speed and optical media rather than assuming physical fit ensures operation. Here the reported failure is Two data-center switches must connect at short range but the purchasing team orders an optic/DAC combination incompatible with the platform. The decisive result for Dunhaven University must instead be: The supported part numbers pass physical link validation on both interfaces.
Environmental sensors remain inside supported limits under representative link and PoE load. Such an observation would verify a separate issue: A distribution closet frequently overheats after a higher-power switch is installed. It would follow the distinct action: Check environmental operating limits, airflow orientation, rack clearance and redundant fan/PSU status. Here the reported failure is Two data-center switches must connect at short range but the purchasing team orders an optic/DAC combination incompatible with the platform. The decisive result for Dunhaven University must instead be: The supported part numbers pass physical link validation on both interfaces.