Question 150
During a routine project audit, engineers discover two unrelated control gaps. These two items involve different cloud resources. One open item requires that teams need declarative repeatable provisioning from versioned files. A second open item requires that a failed Helm deployment needs a known prior release. Which ordered remediation addresses the first gap and then the second gap?
Explanation
Correct Answer
Terraform configuration records desired infrastructure state. Helm rollback restores an earlier release revision.
Incorrect Answers
The first action is valid: Terraform configuration records desired infrastructure state. But the second fails: Project-wide deletion is neither scoped nor a release rollback.
The second action is valid: Helm rollback restores an earlier release revision. But the first fails: Screenshots cannot enforce reproducible declarative infrastructure.
Both requirements remain unmet: Screenshots cannot enforce reproducible declarative infrastructure; Project-wide deletion is neither scoped nor a release rollback.