McAfee-Secured Website

Exam Bundle

Exam Code: Associate Cloud Engineer

Exam Name Associate Cloud Engineer

Certification Provider: Google

Corresponding Certification: Associate Cloud Engineer

Google Associate Cloud Engineer Bundle $44.99

100% Google Associate Cloud Engineer Guaranteed Success With Testking Training Materials

Get Real Associate Cloud Engineer Exam Questions & Expert Verified Answers as Experienced on the Real Exam!

  • Questions & Answers

    Associate Cloud Engineer Questions & Answers

    391 Questions & Answers

    The ultimate exam preparation tool, Questions & Answers mirrors the actual Associate Cloud Engineer exam while allowing you to hone and measure every aspect of your test-taking ability.

  • Associate Cloud Engineer Video Course

    Associate Cloud Engineer Video Course

    234 Video Lectures

    Associate Cloud Engineer Video Course is developed by Google Professionals to help you pass the Associate Cloud Engineer exam.

    Description

    This course will improve your knowledge and skills required to pass Associate Cloud Engineer exam.
  • Study Guide

    Associate Cloud Engineer Study Guide

    849 PDF Pages

    Developed by industry experts, this 849-page guide spells out in painstaking detail all of the information you need to ace Associate Cloud Engineer exam.

Associate Cloud Engineer Practice Tests

Satisfaction Guaranteed

Money Back Guarantee

Testking provides hassle-free money back guarantee with our products. That is because we have 100% trust in the abilities of our professional and experience product team, and our record is a proof of that.

99.6% PASS RATE
Total Cost: $194.97
Bundle Price: $149.98

Purchase Individually

  • Questions & Answers

    Questions & Answers

    391 Questions

    $124.99
  • Associate Cloud Engineer Video Course

    Video Course

    234 Video Lectures

    $39.99
  • Study Guide

    Study Guide

    849 PDF Pages

    $29.99

Google Associate Cloud Engineer Practice Test 1

Question 1

Before promoting an environment into production, operations must finish two tasks. These two items involve different cloud resources. The first requirement is that a legacy system needs programmatic discovery of resource ancestry. The second requirement is that a shared services team must make its VPC available to service projects. Which ordered pair gives an appropriate answer for task one, then task two?

  1. inspect the project parent folder and organization metadata; then configure a Shared VPC host project and attach permitted service projects
  2. inspect the project parent folder and organization metadata; then create unrelated public IP addresses in each project
  3. rename the project display name; then configure a Shared VPC host project and attach permitted service projects
  4. rename the project display name; then create unrelated public IP addresses in each project

Explanation

Correct Answer

A

Parent metadata identifies resource hierarchy relationships. Shared VPC centrally hosts networks for service project resources.

Incorrect Answers

B:

The first action is valid: Parent metadata identifies resource hierarchy relationships. But the second fails: Public addresses do not establish shared VPC membership.

C:

The second action is valid: Shared VPC centrally hosts networks for service project resources. But the first fails: Display-name changes do not establish ancestry.

D:

Both requirements remain unmet: Display-name changes do not establish ancestry; Public addresses do not establish shared VPC membership.

Question 2

A product owner approves a $1,200 monthly Cloud Billing budget for an isolated project. Its budget alert is configured at 55% of the budget, and spend is below the threshold. Assuming actual spend tracking, at what cumulative spending level does this threshold occur?

  1. $1,200
  2. $1,860
  3. $660
  4. $540

Explanation

Correct Answer

C

55% of $1,200 is $660; a budget threshold is a percentage of the configured budget.

Incorrect Answers

A:

$1,200 is the full budget, not the specified 55% threshold.

B:

$1,860 adds the budget again and overstates the alert level.

D:

$540 is the unspent balance after the alert, not the cumulative spend that triggers it.

Question 3

A stateless API can safely serve 45 requests per second on each identical Compute Engine VM. Peak demand is 210 requests per second. Assuming perfect balancing, no autoscaling delay, and no further high-availability buffer, what is the minimum VM count that meets the measured safe capacity?

  1. 5 VMs
  2. 4 VMs
  3. 6 VMs
  4. 7 VMs

Explanation

Correct Answer

A

Round up 210 divided by 45, giving 5 instances to satisfy demand.

Incorrect Answers

B:

4 VMs supply only 180 requests per second, which is below peak demand.

C:

6 VMs supply capacity but exceed the mathematical minimum of 5.

D:

7 VMs also exceed the requested minimum and unnecessarily overprovision.

Question 4

A team is migrating an application and must meet two independent technical acceptance criteria. These two items involve different cloud resources. The first requirement is that a mobile app needs document records with real-time data synchronization. The second requirement is that a telemetry system needs low-latency access to huge sparse key-range tables. Which option matches each action to its criterion in the stated order?

  1. use Firestore for document-oriented application storage; then store all records in Cloud DNS resource records
  2. use Memorystore as the only durable system of record; then use Bigtable for wide-column key-based access
  3. use Memorystore as the only durable system of record; then store all records in Cloud DNS resource records
  4. use Firestore for document-oriented application storage; then use Bigtable for wide-column key-based access

Explanation

Correct Answer

D

Firestore is a managed document database. Bigtable supports massive wide-column keyed workloads.

Incorrect Answers

A:

The first action is valid: Firestore is a managed document database. But the second fails: DNS records are not a general telemetry database.

B:

The second action is valid: Bigtable supports massive wide-column keyed workloads. But the first fails: In-memory caches are not a primary persistent document store.

C:

Both requirements remain unmet: In-memory caches are not a primary persistent document store; DNS records are not a general telemetry database.

Question 5

A custom-mode VPC subnet must accommodate at least 19 usable primary IPv4 addresses for Compute Engine instances, with four addresses reserved by Google Cloud in each IPv4 subnet. Among the listed prefixes, which is the smallest subnet that meets the requirement without needless address allocation?

  1. /26
  2. /25
  3. /27
  4. /28

Explanation

Correct Answer

C

/27 has 28 usable primary addresses after four reservations, the smallest listed subnet meeting 19.

Incorrect Answers

A:

/26 has 60 usable addresses, more than necessary in the specified technical environment and operational constraints.

B:

/25 has 124 usable addresses and is larger than necessary.

D:

/28 leaves 12 usable addresses, below 19 in the specified technical environment and operational constraints.

Question 6

A cloud administrator is implementing a two-part operational checklist before a scheduled release. These two items involve different cloud resources. The first requirement is that infrastructure changes must be reviewed before Terraform applies them. The second requirement is that a changed Helm value must be rolled out to a running release. Which ordered action pair resolves the first and second items respectively?

  1. run terraform plan and inspect proposed changes; then change the Kubernetes namespace description only
  2. run terraform destroy as the first review action; then perform a Helm upgrade with approved chart values
  3. run terraform destroy as the first review action; then change the Kubernetes namespace description only
  4. run terraform plan and inspect proposed changes; then perform a Helm upgrade with approved chart values

Explanation

Correct Answer

D

Terraform plan previews intended changes. Helm upgrade applies release configuration changes.

Incorrect Answers

A:

The first action is valid: Terraform plan previews intended changes. But the second fails: Namespace metadata alone does not upgrade release values.

B:

The second action is valid: Helm upgrade applies release configuration changes. But the first fails: Destroy would remove managed infrastructure rather than preview changes.

C:

Both requirements remain unmet: Destroy would remove managed infrastructure rather than preview changes; Namespace metadata alone does not upgrade release values.

Question 7

An HPA manages 3 GKE Deployment replicas. Current average CPU utilization is 52% of requests, while the HPA target is 45%. Ignoring tolerance, stabilization, minimum and maximum limits, how many replicas does the idealized proportional calculation request at this instant?

  1. 4 replicas
  2. 3 replicas
  3. 5 replicas
  4. 6 replicas

Explanation

Correct Answer

A

Compute ceil(3 × 52 / 45) = 4 replicas under the simplified HPA formula.

Incorrect Answers

B:

3 replicas rounds below the calculated target and would not cover the proportional load.

C:

5 replicas is above the formula result; the HPA need not add an unnecessary replica.

D:

6 replicas is further above the computed desired replicas in the specified technical environment and operational constraints.

Question 8

A Cloud Storage Nearline object is deleted after only 8 days in storage. The class has a 30-day minimum storage duration. How many days short of that minimum is the object when it is deleted, regardless of the monetary charge rate?

  1. 52 days
  2. 22 days
  3. 8 days
  4. 30 days

Explanation

Correct Answer

B

30 minus 8 equals 22 days short of the Nearline minimum.

Incorrect Answers

A:

52 days adds the minimum twice and is not a remaining duration.

C:

8 days confuses elapsed object age with the duration still remaining.

D:

30 days is the entire minimum duration, not the shortfall after 8 days.

Question 9

An engineer allocates 2 separate Google Cloud VPC IPv4 subnets of size /24, each with the standard four unavailable primary addresses. Ignoring any later secondary ranges and VM reservations, how many usable primary addresses are available across these subnets combined?

  1. 504 addresses
  2. 512 addresses
  3. 252 addresses
  4. 500 addresses

Explanation

Correct Answer

A

Each /24 provides 252 usable addresses; multiplied by 2 equals 504.

Incorrect Answers

B:

512 counts all raw addresses but fails to subtract four reserved addresses from each subnet.

C:

252 is capacity of only one subnet, not all 2 subnets.

D:

500 subtracts a different number of reserved addresses than Google Cloud uses per subnet.

Question 10

A Cloud Monitoring request-based SLO sets 99% availability over a window with 15,000 total eligible requests. Assuming each request counts equally and no exclusions apply, how many unsuccessful requests may occur without exceeding the numerical error budget?

  1. 150 failed requests
  2. 14,850 failed requests
  3. 225 failed requests
  4. 149 failed requests

Explanation

Correct Answer

A

Allowed failures are 1.00% of 15,000, which equals 150 requests.

Incorrect Answers

B:

14,850 is the successful-request target rather than the allowed failure count.

C:

225 exceeds the SLO failure allowance of 150 in the specified technical environment and operational constraints.

D:

149 is below the maximum tolerated failures, so it is not the calculated budget.