Question 250
At a power utility operations site in Raleigh, one region’s branch-template group accidentally applies to a newly opened store in another region. The affected services include plant monitoring applications. What evidence should the engineer collect before closing the incident?
Explanation
Correct Answer
At a power utility operations site in Raleigh, this directly validates FortiManager ZTP template and branch mapping: The newly linked device has the planned site identity and approved scoped template configuration. The underlying corrective action is to associate the correct branch model, branch-ID variable and site template group before authorizing automatic installation. The observation tests the required result instead of merely checking whether a configuration was saved.
Incorrect Answers
At a power utility operations site in Raleigh, This checks the outcome for fortimanager device database and revision control instead of fortimanager ztp template and branch mapping. The recorded symptom still requires evidence that the newly linked device has the planned site identity and approved scoped template configuration.
At a power utility operations site in Raleigh, That observation validates metadata variables for branch-specific values, not the indicated fortimanager ztp template and branch mapping failure. It does not show that the newly linked device has the planned site identity and approved scoped template configuration.
At a power utility operations site in Raleigh, A successful check here could be useful for fortianalyzer reporting and troubleshooting, but it would not prove that the newly linked device has the planned site identity and approved scoped template configuration, the test required in this case.