Question 10
At a power utility operations site in Raleigh, the enterprise added a downstream component but has not established an authenticated Fabric relationship. The affected services include plant monitoring applications. What evidence should the engineer collect before closing the incident?
Explanation
Correct Answer
At a power utility operations site in Raleigh, this directly validates Security Fabric connectors: The approved devices appear in the Fabric topology and their permitted alerts or objects propagate to the intended members. The underlying corrective action is to check Fabric membership and the proper connector trust/authorization before expecting shared security context. The observation tests the required result instead of merely checking whether a configuration was saved.
Incorrect Answers
At a power utility operations site in Raleigh, This is not sufficient signoff for the reported security fabric connectors issue. It measures fgcp active-active operation, whereas the required result is that the approved devices appear in the Fabric topology and their permitted alerts or objects propagate to the intended members.
At a power utility operations site in Raleigh, That observation validates fgsp session synchronization, not the indicated security fabric connectors failure. It does not show that the approved devices appear in the Fabric topology and their permitted alerts or objects propagate to the intended members.
At a power utility operations site in Raleigh, A successful check here could be useful for automation stitches, but it would not prove that the approved devices appear in the Fabric topology and their permitted alerts or objects propagate to the intended members, the test required in this case.